Laserfiche WebLink
2.2.2 Phase 2 Services. Design -Builder's Phase 2 services shall consist of the procurement of <br />all materials and equipment for the Project, the performance of construction services for the Project, <br />development of various documents associated with Phase 2, training of Owner's operations staff, and the <br />provision of warranty services, all as may be described in the Phase 2 Proposal and GMP Amendment. <br />2.2.3 Early Works Packages. Owner may negotiate one or more early works packages with <br />Design -Builder prior to the GMP Amendment. Scope of work, bonding (consistent with the requirements of <br />Article 11), insurance (consistent with the requirements of Article 11), pricing, and other terms for any early <br />works shall be negotiated and memorialized in a written executed agreement prior to issuance of a notice <br />to proceed. Pricing shall be substantially similar to the pricing structure for Phase 2 set forth in Article 7 <br />hereof and any General Conditions Fee shall be pro -rated to the scope of General Conditions Work included <br />in the early works package. <br />2.3 Phase 2 Proposal. Design -Builder may develop a Phase 2 Proposal at any point following <br />completion of the 60 percent design, and any other Basis of Design Documents upon which the parties may <br />agree. Design -Builder shall submit a proposal to Owner (the "Phase 2 Proposal") for the construction and <br />associated Work and the Contract Price. The Contract Price in the Phase 2 Proposal shall be based on <br />the Design -Build Fee (Section 7.4), the Construction General Conditions Fee (Section 7.3), Pass -Through <br />Costs (Section 7.5.3) plus the Cost of the Phase 2 Work (Section 7.5) as provided in Article 7 hereof, <br />presented on an open -book basis, all subject to a Guaranteed Maximum Price (GMP). <br />2.3.1 The Phase 2 Proposal shall include the following unless the parties mutually agree <br />otherwise: <br />2.3.1.1 The Contract Price, subject to a GMP, shall be the sum of: <br />i. Design -Build Fee as defined in as defined in Section 7.4 hereof; and <br />ii. Construction General Conditions Fee as defined in Section 7.3 hereof; and <br />iii. The Cost of the Phase 2 Work as defined in Section 7.5 hereof, inclusive of <br />any Design -Builder's Contingency as defined in Section 7.6.2 hereof; and <br />iv. Pass -Through Costs as defined in Section 7.5.3 hereof. <br />2.3.1.2 The Basis of Design Documents, which shall include, by way of example, Owner's <br />Project Criteria (Exhibit B), as may have been modified pursuant to Section 2.1.2 hereof, drawings and <br />specifications, all of which are set forth in detail and are attached to the Phase 2 Proposal; <br />2.3.1.3 A list of the assumptions and clarifications made by Design -Builder in the <br />preparation of the Phase 2 Proposal, which list is intended to supplement the information contained in the <br />drawings and specifications and is specifically included as part of the Basis of Design Documents; <br />2.3.1.4 A Project Schedule for the Phase 2 Work based upon the Contract Time(s) set <br />forth in Article 6 hereof; <br />basis; <br />2.3.1.5 If applicable, a list of Allowance Items, Allowance Values, and a statement of their <br />2.3.1.6 If applicable, a schedule of alternate prices; <br />2.3.1.7 If applicable, a schedule of unit prices; <br />PROGRESSIVE DESIGN -BUILD CONTRACT, Page 4 <br />