iii. Require Design -Builder to proceed with remaining Phase 1 Scope of Services <br />for the agreed upon Contract Price for Phase 1 Services set forth at Section <br />7.1 minus payments for all Work performed through the date of termination; <br />iv. Require Design -Builder to perform any specific portion of the Work under this <br />Contract on the basis of the Design -Build Fee (Section 7.4), the Construction <br />General Conditions Fee (Section 7.3), Pass -Through Costs (Section 7.5.3) <br />plus the Cost of the Phase 2 Work (Section 7.5.1) as provided in Article 7 <br />hereof without a GMP Amendment, in which case all references in this <br />Contract to the GMP Amendment shall not be applicable; or <br />v. Require Design -Builder to continue to proceed with the Work, until further <br />notice (reserving the right to terminate this Contract pursuant to Section <br />2.3.2.3.i.) on the basis of the Design -Build Fee (Section 7.4), the Construction <br />General Conditions Fee (Section 7.3), Pass -Through Costs (Section 7.5.3) <br />plus the Cost of the Phase 2 Work (Section 7.5.1) as provided in Article 7 <br />hereof without a GMP Amendment, in which case all references in this <br />Contract to the GMP Amendment shall not be applicable. <br />2.3.2.4 If Owner fails to exercise any of the options set forth in Section 2.3.2.3 above, <br />Design -Builder shall continue with the Work as if Owner had elected to proceed in accordance with <br />Item 2.3.2.3.v. above, and be paid by Owner accordingly, unless and until Owner notifies Design - <br />Builder in writing to stop the Work. <br />Article 3 <br />Contract Documents <br />The Contract Documents are comprised of the following documents, which are incorporated herein by this <br />reference: <br />3.1 All written and fully executed modifications, amendments, minor changes, and Change Orders to <br />this Contract issued in accordance with the General Conditions; <br />3.2 The GMP Amendment including the Basis of Design Documents; <br />3.3 This Contract, including all Exhibits and attachments with the exception of the Reference <br />Documents identified in Exhibit A. The Reference Documents are not Contract Documents, and <br />except as specifically indicated in Exhibit A are provided for information only. <br />3.4 The General Conditions; <br />3.5 Owner's Request for Qualifications, its Request for Proposals, and its Request for Best and Final <br />Proposals, and Addenda thereto, if any; <br />3.6 Construction Documents prepared and approved in accordance with Section 2.4 of the General <br />Conditions. <br />PROGRESSIVE DESIGN -BUILD CONTRACT, Page 6 <br />