`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: Reservoir 3 Structural Improvements <br />Council Bill # interoffice use <br />Agenda dates requested• <br />11/17/21 <br />Briefing <br />Proposed action <br />Consent 11/17/21 <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />x No <br />Budget amendment: <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Attachments: <br />Scoring Summary <br />Department(s) involved: <br />Public Works, Legal <br />Contact person: <br />Souheil Nasr <br />Phone number: <br />425.257.7210 <br />Email: <br />snasr@everettwa.gov <br />Initialed by: <br />R. LS <br />Department head <br />Administration <br />Council President <br />Consideration: Selection of Design -Builder and Award of Progressive Design Build <br />Contract <br />Project: Reservoir No. 3 Structural Improvements <br />Partner/Supplier: JW Fowler Company <br />Location: Reservoir No. 3, 6107 Evergreen Way <br />Preceding action: Authorization of Request for Qualifications and Request for <br />Proposals <br />Fiscal summaryfffitiaieater/Sewer Utility Fund <br />Fund 401 will fund this project. The authorized funding is $3,200,000, which is for the <br />completion of Phase 1 (design) and Phase 2 (construction). <br />Project summary statement: <br />Reservoir 3 is a 20-million-gallon drinking water reservoir originally constructed as an <br />open-air reservoir in the 1920s and subsequently covered with a concrete roof structure <br />in the 1980s. The concrete roof structure, which covers an area of approximately 3.8 <br />acres, needs structural repairs. <br />This project is being delivered using the "progressive design -build" process, which is <br />authorized under RCW 39.10 as an alternative project delivery method to traditional <br />"design -bid -build". Under progressive design -build, interested design -build contractors <br />first respond to Request for Qualifications (RFQ), then the City narrows that group to <br />finalists, of which one is selected for award. Six teams responded to the Reservoir 3 <br />RFQ. City staff selected three finalists to submit proposals. Following an extensive <br />evaluation of each finalist's proposals, qualifications, approach to the project, <br />interviews, and proposed design pricing, the JW Fowler team attained the highest score. <br />Accordingly, City staff recommends that Council select JW Fowler as the design -builder <br />for award and contract execution. <br />Progressive design -build is a two-phase process: Phase 1 (design) and Phase 2 <br />(construction). The design -build contract authorized in this agenda item is only for <br />Phase 1. During Phase 1, the design -builder will design the project in close coordination <br />with the City. When the design reaches about 60% completion (which will take 6-9 <br />months), City staff and the design -builder will then negotiate a construction price for <br />Phase 2. If those negotiations are successful, City staff will then bring Council a <br />proposed amendment to the design build contract that authorizes Phase 2 at the <br />negotiated construction price, and then construction will begin. <br />Recommendation (exact action requested of Council): <br />Award the contract to JW Fowler for the Design -Build contract for the Reservoir 3 <br />Structural Improvements Project in the amount of $753,079.00 and Authorize the <br />Mayor to sign the contract in substantially the form provided. <br />