Laserfiche WebLink
(2) Adopt Resolution authorizing electronic transfer claims against the City of Everett <br />in the amount of $8,544,465.40 for the period of October 1, 2021 through October 31, <br />2021. <br />Documents: <br />Council Resolution - EFT 10 2021 PDF.pdf <br />(4) Authorize the award of Invitation for Bid #2021-065 Water Treatment Chemicals to <br />Univar Solutions USA, Inc., Newco, Inc. dba Cascade Columbia Distribution Co., <br />Thatcher Company of Montana, Inc., Polydyne, Inc., Chemtrade Chemicals US LLC, <br />and HASA, Inc., Inc. for one (1) year with five (5) additional one-year extension <br />options for approximately $870,236 annually, including Washington State sales tax. <br />Documents: <br />2021-065 Water Treatment Chemicals PDF (2).pdf <br />(5) Authorize the Mayor to sign the Professional Service Agreements for on -call <br />Geotechnical Engineering Services. <br />Documents: <br />Geotech On -Call PSA PDF.pdf <br />(6) Accept the Grand Avenue Park Bridge Project as complete and authorize the Mayor to <br />sign the Certificate of Completion with Interwest Construction, Inc. <br />Documents: <br />Interwest Const Inc Grand Ave Park Bridge FinalAccept KA PDF.pdf <br />(7) Authorize the Mayor to sign Amendment No. 2 to the Professional Service Agreement <br />with KDW Salas O'Brien. <br />Documents: <br />PSA Amend 2 KDW Salas Arc Flash Breaker PDF.pdf <br />(8) Authorize the Mayor to sign Amendment No. 3 with Jacobs Engineering Group, Inc. for <br />the SEI to SRI Intertie and SRO8 Outfall Rehabilitation Construction Support, for extension <br />of the Agreement end date and no additional funding. <br />Documents: <br />SEI to SRI and SRO8 Amend3 Jacobs PDF.pdf <br />(9) Authorize a Call for Bids for the Shore Avenue Forcemain Project. <br />Documents: <br />Shore Ave Forcemain Call for Bids CA PDF.pdf <br />(10) Authorize the Mayor to sign Amendment No. 1 to the Professional Services <br />Agreement with Parametrix, Inc., for the Water Filter Plant Phase 2 Capital Upgrades <br />project to revise the scope of services and increase the compensation by $62,212.00 for <br />a total amount not to exceed $110,094.00. <br />