|
Your world. Delivered.
<br />APPROVED
<br />PLANNING & COMMUNITY
<br />DE LOPMENT DEPT.
<br />DATE q FT
<br />VICINITY MAP
<br />y IN
<br />F �
<br />SITE LOCATION -,N3y
<br />b =
<br />F•�eTeH r '>�ft 51 SE e
<br />aU J C(
<br />Qnd 5' SE � 6Ra1 S. -
<br />tir.Yks'�•p °'
<br />K'
<br />4'lral 8t 3E
<br />w:,
<br />Ord ST 5F
<br />s
<br />Lnglun Ase
<br />L Q
<br />4Eran P'
<br />APPROVAUSIGN OFF OF DRAWINGS
<br />CONSULTANT DATE SIGNATURE
<br />PROJECT MANAGER
<br />CONSTRUCTION MANAGER
<br />SITE ACQUISITION
<br />LANDLORD'S REPRESENTATIVE
<br />CARRIER DATE SIGNATURE
<br />PROJECT MANAGER
<br />CONSTRUCTION MANAGER
<br />RF ENGINEER
<br />INTERCONNECT
<br />OPERATIONS
<br />COMPI-IANCF
<br />REVIEWERS SHALL CLEARLY PLACE INITIALS ADJACENT TO EAG#
<br />REDLINE NOTE AS DRAWINGS ARE BEING REDLINED
<br />GENERAL DYN,
<br />EVERETT GOLF & COUNTRY CLUB - LTE 3C-4C
<br />6107 BERKSHIRE DRIVE
<br />EVERETT, WA 98203
<br />SNOHOMISH COUNTY
<br />CROWN CASTLE #823967
<br />GENERAL LOCATION MAP
<br />•., q hero .b s e, I �
<br />6 sPAo lyP1E
<br />j °1 ss N
<br />a Is� W.,s.� Y }• �
<br />SITE LOCATIONR 111#6" �•; Lti; h�
<br />' 4 u
<br />3 YI • m aw 0:. P-.
<br />„�,bt� •�� P.-y D fH F•x SI Y
<br />r" rymw weuy 7.
<br />v_ a 4,r - � •�• C
<br />I DRIVING DIRECTIONS
<br />FROM NEW CINGULAR WIRELESS IN REDMOND. WA
<br />TAKE 1-405 NORTH
<br />TAKE RAMP RIGHT FOR 1-5 N
<br />AT EXIT 189, TAKE RAMP RIGHT FOR WA-526 WEST TOWARDKI WHIDBEY IS. FERRY I MULTEO
<br />TAKE RAMP RIGHT AND FOLLOW SIGNS FOR EVERGREEN WAY
<br />TURN RIGHT ONTO EVERGREEN WAY
<br />TURN RIGHT ONTO HIGHWAY PL
<br />ARRIVE AT 47.943055,-122.212638
<br />LEGAL DESCRIPTION
<br />SEC 06 TWP 28 RGE 05RT-23) BEG NE COR NW114 SE114 TH S 858MH W
<br />1125.88FT TH N 858FT TH E 1125.88MO P08 LESS TR 14 AC ON W SO &
<br />LESS TR .68 AC IN NE COR SUBJ TO ESE- PUD 1
<br />PER SNOHOMISH COUNTY ASSESSORS RECORDS
<br />PROJECT TEAM
<br />APPLICANT:
<br />NEW CINGULAR WIRELESS.LLC.
<br />16221 NE 72nd WAY, RTC 3
<br />P.O. BOX 97061
<br />REDMOND, WA 98052
<br />PROJECT ENGINEER:
<br />CORNERSTONE ENGINEERING. INC.
<br />16928 WOODINVILLE-REDMOND RD N.E. STE 210
<br />WOODINVILLE, WA98072
<br />MARK W OLSON, P.E.
<br />(425)487-1732
<br />PROJECT CONSULTANT:
<br />GENERAL DYNAMICS
<br />175C POUNDERS PARKWAY. SUITE 120
<br />ALPHARETTA, GA 30009
<br />(770)225-1564
<br />PROPERTY OWNER:
<br />CITY OF EVERETT. WA
<br />3002 WETMORE AVE
<br />EVERETT, WA98201
<br />TOWER OWNER:
<br />CROWN CASTLE INTERNATIONAL
<br />2000 CORPORATE DRIVE
<br />CANONSBURG, PA 15317
<br />PROJECT LEAD:
<br />ED BELLAN
<br />(781)400-7459
<br />ea bellan@gdit com
<br />CONSTRUCTION MANAGER__
<br />ED BELLAN
<br />(751)400-7459
<br />ed.bellan@gdd.com
<br />LEASING:
<br />CHELSEA SHEARER
<br />(206) 523.1941
<br />cstiearer@rykaconsulfing.com
<br />PERMITTING:
<br />CHRIS DEVOtST
<br />(206) 523-1941
<br />cdevolst@rykaconsulting c om
<br />RF ENGINEER.
<br />ANNE LE
<br />(425) 580.1577
<br />a17568@att.com
<br />Permit#: B1703-026
<br />Site Address: 6107 BERK-SHIRE DR
<br />n,., FIICDCTF CITY
<br />Tenant: [I
<br />App. Date: 3,
<br />Proposed Use: CI
<br />Description: A
<br />ADD (6) REMOTE
<br />Reviewed By:_
<br />Office Set _
<br />9� Z'�3UER —
<br />MAR 21 2017,
<br />CITY OF EVERETT
<br />Permit Service
<br />CITY OF EVERETT
<br />REVIEWED FOR PERMIT
<br />I PROJECT INFORMATION I
<br />CODE INFORMATION: PARCEL NUMBER: ZONING CLASSIFICATION: R-1 2W50600400900
<br />BUILDING CODE: IBC 2015
<br />CONSTRUCTION TYPE: V-B AREA OF PARCEL:
<br />OCCUPANCY: GROUP U 121.54 ACRES
<br />JURISDICTION: CITY OF EVERETT. WA
<br />PROPOSED BUILDING USE: TELL-COMM PROJECT AREA:
<br />*144 SQ. FT. (EQUIPMENT AREA)
<br />SITE LOCATION (BASED ON NAD 83):
<br />LATITUDE: 47- 56' 35.0(Y N (47,943056) NEW IMPERVIOUSA: ARE
<br />LONGITUDE 122. 12' 45.5W W (.122.212638) 0 SQ FT
<br />TOP OF STRUCTURE: t130.0' (MONOPOLE)
<br />BASE OF STRUCTURE t0.d A.V!SL (ASSUMED)
<br />GENERAL INFORMATION.
<br />1. PARKING REQUIREMENTS ARE UNCHANGED. (NON ASSIGNED TECH PARKING)
<br />2. TRAFFIC IS UNAFFECTED
<br />DRAWING INDEX
<br />DWG DESCRIPTION
<br />T-1 TITLE SHEET
<br />G-1 GENERAL NOTES
<br />A-1 SITE PLAN
<br />A-1.1 EXISTING ENLARGED SITE PLAN
<br />A-12 EXISTING & PROPOSED EQUIPMENT PLANS
<br />A-2 EXISTING & PROPOSED NORTHEAST ELEVATIONS
<br />A-3 DETAILS
<br />A3.1 BATTERY SYSTEM REQUIREMENTS
<br />RF-1 ANTENNA PLANS & SCHEDULES
<br />E-1 SCHEMATIC GROUNDING PLAN
<br />E-1.1 GROUNDING DETAILS
<br />PROJECT INFORMATION
<br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4
<br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^
<br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1
<br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS
<br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY
<br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH)
<br />MOUNTED NEAR EQUIPMENT ON THE GROUND
<br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO
<br />HEADS(RRH)
<br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT
<br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S
<br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4-
<br />DC POWER CABLES & (1) 112- FIBER CABLE
<br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND
<br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION
<br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6)
<br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU
<br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT
<br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY
<br />CABINET
<br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW
<br />CONVERTERS IN (E) TE43 CABINET
<br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz
<br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43
<br />CABINET
<br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S
<br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET
<br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET
<br />PER RFDS REV 2.0 DATED 12-19.2016
<br />SCOPING TRACKER DATED 01-24-2017
<br />OF
<br />-enName]
<br />'13/2017
<br />JMMERCIAL
<br />FT&T REMOVE/REPLACE (3) ANTENNAS
<br />RADIO UNITS
<br />Date: v ob Site Set Fire/Planning Lt
<br />YfY(W ..........
<br />r-PROJEC- INFO
<br />WA6808
<br />EVERETT GOLF
<br />& COUNTRY CLUB
<br />6107 BERKSHIRE DRIVE
<br />EVERETT, WA 98203
<br />SNOHOMISH COUNTY
<br />—ISSUFO FOR:
<br />CCONSTRUCTION
<br />rREV::DATE: =ISSUED FOR: BY
<br />DRAWN BY: =CHK-. APV : r
<br />L DMO MIND MWO
<br />CURRENT ISSUEDAIE:
<br />03-03-17
<br />1, S /i jl
<br />4 lb
<br />JURISDICTIONAL APPROVAL:
<br />PROPRIETARY INFORMATION.
<br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY
<br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY
<br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS
<br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION
<br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS
<br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE
<br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5
<br />SIRC.IL Y PRCw'BJED
<br />DRAWING TITLE'.
<br />TITLE SHEET
<br />r DRAWING NUM8FR
<br />T-1
<br />GENERAL DYN,
<br />EVERETT GOLF & COUNTRY CLUB - LTE 3C-4C
<br />6107 BERKSHIRE DRIVE
<br />EVERETT, WA 98203
<br />SNOHOMISH COUNTY
<br />CROWN CASTLE #823967
<br />GENERAL LOCATION MAP
<br />•., q hero .b s e, I �
<br />6 sPAo lyP1E
<br />j °1 ss N
<br />a Is� W.,s.� Y }• �
<br />SITE LOCATIONR 111#6" �•; Lti; h�
<br />' 4 u
<br />3 YI • m aw 0:. P-.
<br />„�,bt� •�� P.-y D fH F•x SI Y
<br />r" rymw weuy 7.
<br />v_ a 4,r - � •�• C
<br />I DRIVING DIRECTIONS
<br />FROM NEW CINGULAR WIRELESS IN REDMOND. WA
<br />TAKE 1-405 NORTH
<br />TAKE RAMP RIGHT FOR 1-5 N
<br />AT EXIT 189, TAKE RAMP RIGHT FOR WA-526 WEST TOWARDKI WHIDBEY IS. FERRY I MULTEO
<br />TAKE RAMP RIGHT AND FOLLOW SIGNS FOR EVERGREEN WAY
<br />TURN RIGHT ONTO EVERGREEN WAY
<br />TURN RIGHT ONTO HIGHWAY PL
<br />ARRIVE AT 47.943055,-122.212638
<br />LEGAL DESCRIPTION
<br />SEC 06 TWP 28 RGE 05RT-23) BEG NE COR NW114 SE114 TH S 858MH W
<br />1125.88FT TH N 858FT TH E 1125.88MO P08 LESS TR 14 AC ON W SO &
<br />LESS TR .68 AC IN NE COR SUBJ TO ESE- PUD 1
<br />PER SNOHOMISH COUNTY ASSESSORS RECORDS
<br />PROJECT TEAM
<br />APPLICANT:
<br />NEW CINGULAR WIRELESS.LLC.
<br />16221 NE 72nd WAY, RTC 3
<br />P.O. BOX 97061
<br />REDMOND, WA 98052
<br />PROJECT ENGINEER:
<br />CORNERSTONE ENGINEERING. INC.
<br />16928 WOODINVILLE-REDMOND RD N.E. STE 210
<br />WOODINVILLE, WA98072
<br />MARK W OLSON, P.E.
<br />(425)487-1732
<br />PROJECT CONSULTANT:
<br />GENERAL DYNAMICS
<br />175C POUNDERS PARKWAY. SUITE 120
<br />ALPHARETTA, GA 30009
<br />(770)225-1564
<br />PROPERTY OWNER:
<br />CITY OF EVERETT. WA
<br />3002 WETMORE AVE
<br />EVERETT, WA98201
<br />TOWER OWNER:
<br />CROWN CASTLE INTERNATIONAL
<br />2000 CORPORATE DRIVE
<br />CANONSBURG, PA 15317
<br />PROJECT LEAD:
<br />ED BELLAN
<br />(781)400-7459
<br />ea bellan@gdit com
<br />CONSTRUCTION MANAGER__
<br />ED BELLAN
<br />(751)400-7459
<br />ed.bellan@gdd.com
<br />LEASING:
<br />CHELSEA SHEARER
<br />(206) 523.1941
<br />cstiearer@rykaconsulfing.com
<br />PERMITTING:
<br />CHRIS DEVOtST
<br />(206) 523-1941
<br />cdevolst@rykaconsulting c om
<br />RF ENGINEER.
<br />ANNE LE
<br />(425) 580.1577
<br />a17568@att.com
<br />Permit#: B1703-026
<br />Site Address: 6107 BERK-SHIRE DR
<br />n,., FIICDCTF CITY
<br />Tenant: [I
<br />App. Date: 3,
<br />Proposed Use: CI
<br />Description: A
<br />ADD (6) REMOTE
<br />Reviewed By:_
<br />Office Set _
<br />9� Z'�3UER —
<br />MAR 21 2017,
<br />CITY OF EVERETT
<br />Permit Service
<br />CITY OF EVERETT
<br />REVIEWED FOR PERMIT
<br />I PROJECT INFORMATION I
<br />CODE INFORMATION: PARCEL NUMBER: ZONING CLASSIFICATION: R-1 2W50600400900
<br />BUILDING CODE: IBC 2015
<br />CONSTRUCTION TYPE: V-B AREA OF PARCEL:
<br />OCCUPANCY: GROUP U 121.54 ACRES
<br />JURISDICTION: CITY OF EVERETT. WA
<br />PROPOSED BUILDING USE: TELL-COMM PROJECT AREA:
<br />*144 SQ. FT. (EQUIPMENT AREA)
<br />SITE LOCATION (BASED ON NAD 83):
<br />LATITUDE: 47- 56' 35.0(Y N (47,943056) NEW IMPERVIOUSA: ARE
<br />LONGITUDE 122. 12' 45.5W W (.122.212638) 0 SQ FT
<br />TOP OF STRUCTURE: t130.0' (MONOPOLE)
<br />BASE OF STRUCTURE t0.d A.V!SL (ASSUMED)
<br />GENERAL INFORMATION.
<br />1. PARKING REQUIREMENTS ARE UNCHANGED. (NON ASSIGNED TECH PARKING)
<br />2. TRAFFIC IS UNAFFECTED
<br />DRAWING INDEX
<br />DWG DESCRIPTION
<br />T-1 TITLE SHEET
<br />G-1 GENERAL NOTES
<br />A-1 SITE PLAN
<br />A-1.1 EXISTING ENLARGED SITE PLAN
<br />A-12 EXISTING & PROPOSED EQUIPMENT PLANS
<br />A-2 EXISTING & PROPOSED NORTHEAST ELEVATIONS
<br />A-3 DETAILS
<br />A3.1 BATTERY SYSTEM REQUIREMENTS
<br />RF-1 ANTENNA PLANS & SCHEDULES
<br />E-1 SCHEMATIC GROUNDING PLAN
<br />E-1.1 GROUNDING DETAILS
<br />PROJECT INFORMATION
<br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4
<br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^
<br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1
<br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS
<br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY
<br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH)
<br />MOUNTED NEAR EQUIPMENT ON THE GROUND
<br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO
<br />HEADS(RRH)
<br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT
<br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S
<br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4-
<br />DC POWER CABLES & (1) 112- FIBER CABLE
<br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND
<br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION
<br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6)
<br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU
<br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT
<br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY
<br />CABINET
<br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW
<br />CONVERTERS IN (E) TE43 CABINET
<br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz
<br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43
<br />CABINET
<br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S
<br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET
<br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET
<br />PER RFDS REV 2.0 DATED 12-19.2016
<br />SCOPING TRACKER DATED 01-24-2017
<br />OF
<br />-enName]
<br />'13/2017
<br />JMMERCIAL
<br />FT&T REMOVE/REPLACE (3) ANTENNAS
<br />RADIO UNITS
<br />Date: v ob Site Set Fire/Planning Lt
<br />YfY(W ..........
<br />r-PROJEC- INFO
<br />WA6808
<br />EVERETT GOLF
<br />& COUNTRY CLUB
<br />6107 BERKSHIRE DRIVE
<br />EVERETT, WA 98203
<br />SNOHOMISH COUNTY
<br />—ISSUFO FOR:
<br />CCONSTRUCTION
<br />rREV::DATE: =ISSUED FOR: BY
<br />DRAWN BY: =CHK-. APV : r
<br />L DMO MIND MWO
<br />CURRENT ISSUEDAIE:
<br />03-03-17
<br />1, S /i jl
<br />4 lb
<br />JURISDICTIONAL APPROVAL:
<br />PROPRIETARY INFORMATION.
<br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY
<br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY
<br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS
<br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION
<br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS
<br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE
<br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5
<br />SIRC.IL Y PRCw'BJED
<br />DRAWING TITLE'.
<br />TITLE SHEET
<br />r DRAWING NUM8FR
<br />T-1
<br />TOP OF STRUCTURE: t130.0' (MONOPOLE)
<br />BASE OF STRUCTURE t0.d A.V!SL (ASSUMED)
<br />GENERAL INFORMATION.
<br />1. PARKING REQUIREMENTS ARE UNCHANGED. (NON ASSIGNED TECH PARKING)
<br />2. TRAFFIC IS UNAFFECTED
<br />DRAWING INDEX
<br />DWG DESCRIPTION
<br />T-1 TITLE SHEET
<br />G-1 GENERAL NOTES
<br />A-1 SITE PLAN
<br />A-1.1 EXISTING ENLARGED SITE PLAN
<br />A-12 EXISTING & PROPOSED EQUIPMENT PLANS
<br />A-2 EXISTING & PROPOSED NORTHEAST ELEVATIONS
<br />A-3 DETAILS
<br />A3.1 BATTERY SYSTEM REQUIREMENTS
<br />RF-1 ANTENNA PLANS & SCHEDULES
<br />E-1 SCHEMATIC GROUNDING PLAN
<br />E-1.1 GROUNDING DETAILS
<br />PROJECT INFORMATION
<br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4
<br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^
<br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1
<br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS
<br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY
<br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH)
<br />MOUNTED NEAR EQUIPMENT ON THE GROUND
<br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO
<br />HEADS(RRH)
<br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT
<br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S
<br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4-
<br />DC POWER CABLES & (1) 112- FIBER CABLE
<br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND
<br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION
<br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6)
<br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU
<br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT
<br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY
<br />CABINET
<br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW
<br />CONVERTERS IN (E) TE43 CABINET
<br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz
<br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43
<br />CABINET
<br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S
<br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET
<br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET
<br />PER RFDS REV 2.0 DATED 12-19.2016
<br />SCOPING TRACKER DATED 01-24-2017
<br />OF
<br />-enName]
<br />'13/2017
<br />JMMERCIAL
<br />FT&T REMOVE/REPLACE (3) ANTENNAS
<br />RADIO UNITS
<br />Date: v ob Site Set Fire/Planning Lt
<br />YfY(W ..........
<br />r-PROJEC- INFO
<br />WA6808
<br />EVERETT GOLF
<br />& COUNTRY CLUB
<br />6107 BERKSHIRE DRIVE
<br />EVERETT, WA 98203
<br />SNOHOMISH COUNTY
<br />—ISSUFO FOR:
<br />CCONSTRUCTION
<br />rREV::DATE: =ISSUED FOR: BY
<br />DRAWN BY: =CHK-. APV : r
<br />L DMO MIND MWO
<br />CURRENT ISSUEDAIE:
<br />03-03-17
<br />1, S /i jl
<br />4 lb
<br />JURISDICTIONAL APPROVAL:
<br />PROPRIETARY INFORMATION.
<br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY
<br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY
<br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS
<br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION
<br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS
<br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE
<br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5
<br />SIRC.IL Y PRCw'BJED
<br />DRAWING TITLE'.
<br />TITLE SHEET
<br />r DRAWING NUM8FR
<br />T-1
<br />PROJECT INFORMATION
<br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4
<br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^
<br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1
<br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS
<br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY
<br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH)
<br />MOUNTED NEAR EQUIPMENT ON THE GROUND
<br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO
<br />HEADS(RRH)
<br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT
<br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S
<br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4-
<br />DC POWER CABLES & (1) 112- FIBER CABLE
<br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND
<br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION
<br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6)
<br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU
<br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT
<br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY
<br />CABINET
<br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW
<br />CONVERTERS IN (E) TE43 CABINET
<br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz
<br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43
<br />CABINET
<br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S
<br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET
<br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET
<br />PER RFDS REV 2.0 DATED 12-19.2016
<br />SCOPING TRACKER DATED 01-24-2017
<br />OF
<br />-enName]
<br />'13/2017
<br />JMMERCIAL
<br />FT&T REMOVE/REPLACE (3) ANTENNAS
<br />RADIO UNITS
<br />Date: v ob Site Set Fire/Planning Lt
<br />YfY(W ..........
<br />r-PROJEC- INFO
<br />WA6808
<br />EVERETT GOLF
<br />& COUNTRY CLUB
<br />6107 BERKSHIRE DRIVE
<br />EVERETT, WA 98203
<br />SNOHOMISH COUNTY
<br />—ISSUFO FOR:
<br />CCONSTRUCTION
<br />rREV::DATE: =ISSUED FOR: BY
<br />DRAWN BY: =CHK-. APV : r
<br />L DMO MIND MWO
<br />CURRENT ISSUEDAIE:
<br />03-03-17
<br />1, S /i jl
<br />4 lb
<br />JURISDICTIONAL APPROVAL:
<br />PROPRIETARY INFORMATION.
<br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY
<br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY
<br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS
<br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION
<br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS
<br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE
<br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5
<br />SIRC.IL Y PRCw'BJED
<br />DRAWING TITLE'.
<br />TITLE SHEET
<br />r DRAWING NUM8FR
<br />T-1
<br />0
<br />GEL JOB NUMBER LTE 3C-4C 16-(Wr17
<br />ill
<br />
|