Laserfiche WebLink
Your world. Delivered. <br />APPROVED <br />PLANNING & COMMUNITY <br />DE LOPMENT DEPT. <br />DATE q FT <br />VICINITY MAP <br />y IN <br />F � <br />SITE LOCATION -,N3y <br />b = <br />F•�eTeH r '>�ft 51 SE e <br />aU J C( <br />Qnd 5' SE � 6Ra1 S. - <br />tir.Yks'�•p °' <br />K' <br />4'lral 8t 3E <br />w:, <br />Ord ST 5F <br />s <br />Lnglun Ase <br />L Q <br />4Eran P' <br />APPROVAUSIGN OFF OF DRAWINGS <br />CONSULTANT DATE SIGNATURE <br />PROJECT MANAGER <br />CONSTRUCTION MANAGER <br />SITE ACQUISITION <br />LANDLORD'S REPRESENTATIVE <br />CARRIER DATE SIGNATURE <br />PROJECT MANAGER <br />CONSTRUCTION MANAGER <br />RF ENGINEER <br />INTERCONNECT <br />OPERATIONS <br />COMPI-IANCF <br />REVIEWERS SHALL CLEARLY PLACE INITIALS ADJACENT TO EAG# <br />REDLINE NOTE AS DRAWINGS ARE BEING REDLINED <br />GENERAL DYN, <br />EVERETT GOLF & COUNTRY CLUB - LTE 3C-4C <br />6107 BERKSHIRE DRIVE <br />EVERETT, WA 98203 <br />SNOHOMISH COUNTY <br />CROWN CASTLE #823967 <br />GENERAL LOCATION MAP <br />•., q hero .b s e, I � <br />6 sPAo lyP1E <br />j °1 ss N <br />a Is� W.,s.� Y }• � <br />SITE LOCATIONR 111#6" �•; Lti; h� <br />' 4 u <br />3 YI • m aw 0:. P-. <br />„�,bt� •�� P.-y D fH F•x SI Y <br />r" rymw weuy 7. <br />v_ a 4,r - � •�• C <br />I DRIVING DIRECTIONS <br />FROM NEW CINGULAR WIRELESS IN REDMOND. WA <br />TAKE 1-405 NORTH <br />TAKE RAMP RIGHT FOR 1-5 N <br />AT EXIT 189, TAKE RAMP RIGHT FOR WA-526 WEST TOWARDKI WHIDBEY IS. FERRY I MULTEO <br />TAKE RAMP RIGHT AND FOLLOW SIGNS FOR EVERGREEN WAY <br />TURN RIGHT ONTO EVERGREEN WAY <br />TURN RIGHT ONTO HIGHWAY PL <br />ARRIVE AT 47.943055,-122.212638 <br />LEGAL DESCRIPTION <br />SEC 06 TWP 28 RGE 05RT-23) BEG NE COR NW114 SE114 TH S 858MH W <br />1125.88FT TH N 858FT TH E 1125.88MO P08 LESS TR 14 AC ON W SO & <br />LESS TR .68 AC IN NE COR SUBJ TO ESE- PUD 1 <br />PER SNOHOMISH COUNTY ASSESSORS RECORDS <br />PROJECT TEAM <br />APPLICANT: <br />NEW CINGULAR WIRELESS.LLC. <br />16221 NE 72nd WAY, RTC 3 <br />P.O. BOX 97061 <br />REDMOND, WA 98052 <br />PROJECT ENGINEER: <br />CORNERSTONE ENGINEERING. INC. <br />16928 WOODINVILLE-REDMOND RD N.E. STE 210 <br />WOODINVILLE, WA98072 <br />MARK W OLSON, P.E. <br />(425)487-1732 <br />PROJECT CONSULTANT: <br />GENERAL DYNAMICS <br />175C POUNDERS PARKWAY. SUITE 120 <br />ALPHARETTA, GA 30009 <br />(770)225-1564 <br />PROPERTY OWNER: <br />CITY OF EVERETT. WA <br />3002 WETMORE AVE <br />EVERETT, WA98201 <br />TOWER OWNER: <br />CROWN CASTLE INTERNATIONAL <br />2000 CORPORATE DRIVE <br />CANONSBURG, PA 15317 <br />PROJECT LEAD: <br />ED BELLAN <br />(781)400-7459 <br />ea bellan@gdit com <br />CONSTRUCTION MANAGER__ <br />ED BELLAN <br />(751)400-7459 <br />ed.bellan@gdd.com <br />LEASING: <br />CHELSEA SHEARER <br />(206) 523.1941 <br />cstiearer@rykaconsulfing.com <br />PERMITTING: <br />CHRIS DEVOtST <br />(206) 523-1941 <br />cdevolst@rykaconsulting c om <br />RF ENGINEER. <br />ANNE LE <br />(425) 580.1577 <br />a17568@att.com <br />Permit#: B1703-026 <br />Site Address: 6107 BERK-SHIRE DR <br />n,., FIICDCTF CITY <br />Tenant: [I <br />App. Date: 3, <br />Proposed Use: CI <br />Description: A <br />ADD (6) REMOTE <br />Reviewed By:_ <br />Office Set _ <br />9� Z'�3UER — <br />MAR 21 2017, <br />CITY OF EVERETT <br />Permit Service <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />I PROJECT INFORMATION I <br />CODE INFORMATION: PARCEL NUMBER: ZONING CLASSIFICATION: R-1 2W50600400900 <br />BUILDING CODE: IBC 2015 <br />CONSTRUCTION TYPE: V-B AREA OF PARCEL: <br />OCCUPANCY: GROUP U 121.54 ACRES <br />JURISDICTION: CITY OF EVERETT. WA <br />PROPOSED BUILDING USE: TELL-COMM PROJECT AREA: <br />*144 SQ. FT. (EQUIPMENT AREA) <br />SITE LOCATION (BASED ON NAD 83): <br />LATITUDE: 47- 56' 35.0(Y N (47,943056) NEW IMPERVIOUSA: ARE <br />LONGITUDE 122. 12' 45.5W W (.122.212638) 0 SQ FT <br />TOP OF STRUCTURE: t130.0' (MONOPOLE) <br />BASE OF STRUCTURE t0.d A.V!SL (ASSUMED) <br />GENERAL INFORMATION. <br />1. PARKING REQUIREMENTS ARE UNCHANGED. (NON ASSIGNED TECH PARKING) <br />2. TRAFFIC IS UNAFFECTED <br />DRAWING INDEX <br />DWG DESCRIPTION <br />T-1 TITLE SHEET <br />G-1 GENERAL NOTES <br />A-1 SITE PLAN <br />A-1.1 EXISTING ENLARGED SITE PLAN <br />A-12 EXISTING & PROPOSED EQUIPMENT PLANS <br />A-2 EXISTING & PROPOSED NORTHEAST ELEVATIONS <br />A-3 DETAILS <br />A3.1 BATTERY SYSTEM REQUIREMENTS <br />RF-1 ANTENNA PLANS & SCHEDULES <br />E-1 SCHEMATIC GROUNDING PLAN <br />E-1.1 GROUNDING DETAILS <br />PROJECT INFORMATION <br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4 <br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^ <br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1 <br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS <br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY <br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH) <br />MOUNTED NEAR EQUIPMENT ON THE GROUND <br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO <br />HEADS(RRH) <br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT <br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S <br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4- <br />DC POWER CABLES & (1) 112- FIBER CABLE <br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND <br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION <br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6) <br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU <br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT <br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY <br />CABINET <br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW <br />CONVERTERS IN (E) TE43 CABINET <br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz <br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43 <br />CABINET <br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S <br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET <br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET <br />PER RFDS REV 2.0 DATED 12-19.2016 <br />SCOPING TRACKER DATED 01-24-2017 <br />OF <br />-enName] <br />'13/2017 <br />JMMERCIAL <br />FT&T REMOVE/REPLACE (3) ANTENNAS <br />RADIO UNITS <br />Date: v ob Site Set Fire/Planning Lt <br />YfY(W .......... <br />r-PROJEC- INFO <br />WA6808 <br />EVERETT GOLF <br />& COUNTRY CLUB <br />6107 BERKSHIRE DRIVE <br />EVERETT, WA 98203 <br />SNOHOMISH COUNTY <br />—ISSUFO FOR: <br />CCONSTRUCTION <br />rREV::DATE: =ISSUED FOR: BY <br />DRAWN BY: =CHK-. APV : r <br />L DMO MIND MWO <br />CURRENT ISSUEDAIE: <br />03-03-17 <br />1, S /i jl <br />4 lb <br />JURISDICTIONAL APPROVAL: <br />PROPRIETARY INFORMATION. <br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY <br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY <br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS <br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION <br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS <br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE <br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5 <br />SIRC.IL Y PRCw'BJED <br />DRAWING TITLE'. <br />TITLE SHEET <br />r DRAWING NUM8FR <br />T-1 <br />GENERAL DYN, <br />EVERETT GOLF & COUNTRY CLUB - LTE 3C-4C <br />6107 BERKSHIRE DRIVE <br />EVERETT, WA 98203 <br />SNOHOMISH COUNTY <br />CROWN CASTLE #823967 <br />GENERAL LOCATION MAP <br />•., q hero .b s e, I � <br />6 sPAo lyP1E <br />j °1 ss N <br />a Is� W.,s.� Y }• � <br />SITE LOCATIONR 111#6" �•; Lti; h� <br />' 4 u <br />3 YI • m aw 0:. P-. <br />„�,bt� •�� P.-y D fH F•x SI Y <br />r" rymw weuy 7. <br />v_ a 4,r - � •�• C <br />I DRIVING DIRECTIONS <br />FROM NEW CINGULAR WIRELESS IN REDMOND. WA <br />TAKE 1-405 NORTH <br />TAKE RAMP RIGHT FOR 1-5 N <br />AT EXIT 189, TAKE RAMP RIGHT FOR WA-526 WEST TOWARDKI WHIDBEY IS. FERRY I MULTEO <br />TAKE RAMP RIGHT AND FOLLOW SIGNS FOR EVERGREEN WAY <br />TURN RIGHT ONTO EVERGREEN WAY <br />TURN RIGHT ONTO HIGHWAY PL <br />ARRIVE AT 47.943055,-122.212638 <br />LEGAL DESCRIPTION <br />SEC 06 TWP 28 RGE 05RT-23) BEG NE COR NW114 SE114 TH S 858MH W <br />1125.88FT TH N 858FT TH E 1125.88MO P08 LESS TR 14 AC ON W SO & <br />LESS TR .68 AC IN NE COR SUBJ TO ESE- PUD 1 <br />PER SNOHOMISH COUNTY ASSESSORS RECORDS <br />PROJECT TEAM <br />APPLICANT: <br />NEW CINGULAR WIRELESS.LLC. <br />16221 NE 72nd WAY, RTC 3 <br />P.O. BOX 97061 <br />REDMOND, WA 98052 <br />PROJECT ENGINEER: <br />CORNERSTONE ENGINEERING. INC. <br />16928 WOODINVILLE-REDMOND RD N.E. STE 210 <br />WOODINVILLE, WA98072 <br />MARK W OLSON, P.E. <br />(425)487-1732 <br />PROJECT CONSULTANT: <br />GENERAL DYNAMICS <br />175C POUNDERS PARKWAY. SUITE 120 <br />ALPHARETTA, GA 30009 <br />(770)225-1564 <br />PROPERTY OWNER: <br />CITY OF EVERETT. WA <br />3002 WETMORE AVE <br />EVERETT, WA98201 <br />TOWER OWNER: <br />CROWN CASTLE INTERNATIONAL <br />2000 CORPORATE DRIVE <br />CANONSBURG, PA 15317 <br />PROJECT LEAD: <br />ED BELLAN <br />(781)400-7459 <br />ea bellan@gdit com <br />CONSTRUCTION MANAGER__ <br />ED BELLAN <br />(751)400-7459 <br />ed.bellan@gdd.com <br />LEASING: <br />CHELSEA SHEARER <br />(206) 523.1941 <br />cstiearer@rykaconsulfing.com <br />PERMITTING: <br />CHRIS DEVOtST <br />(206) 523-1941 <br />cdevolst@rykaconsulting c om <br />RF ENGINEER. <br />ANNE LE <br />(425) 580.1577 <br />a17568@att.com <br />Permit#: B1703-026 <br />Site Address: 6107 BERK-SHIRE DR <br />n,., FIICDCTF CITY <br />Tenant: [I <br />App. Date: 3, <br />Proposed Use: CI <br />Description: A <br />ADD (6) REMOTE <br />Reviewed By:_ <br />Office Set _ <br />9� Z'�3UER — <br />MAR 21 2017, <br />CITY OF EVERETT <br />Permit Service <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />I PROJECT INFORMATION I <br />CODE INFORMATION: PARCEL NUMBER: ZONING CLASSIFICATION: R-1 2W50600400900 <br />BUILDING CODE: IBC 2015 <br />CONSTRUCTION TYPE: V-B AREA OF PARCEL: <br />OCCUPANCY: GROUP U 121.54 ACRES <br />JURISDICTION: CITY OF EVERETT. WA <br />PROPOSED BUILDING USE: TELL-COMM PROJECT AREA: <br />*144 SQ. FT. (EQUIPMENT AREA) <br />SITE LOCATION (BASED ON NAD 83): <br />LATITUDE: 47- 56' 35.0(Y N (47,943056) NEW IMPERVIOUSA: ARE <br />LONGITUDE 122. 12' 45.5W W (.122.212638) 0 SQ FT <br />TOP OF STRUCTURE: t130.0' (MONOPOLE) <br />BASE OF STRUCTURE t0.d A.V!SL (ASSUMED) <br />GENERAL INFORMATION. <br />1. PARKING REQUIREMENTS ARE UNCHANGED. (NON ASSIGNED TECH PARKING) <br />2. TRAFFIC IS UNAFFECTED <br />DRAWING INDEX <br />DWG DESCRIPTION <br />T-1 TITLE SHEET <br />G-1 GENERAL NOTES <br />A-1 SITE PLAN <br />A-1.1 EXISTING ENLARGED SITE PLAN <br />A-12 EXISTING & PROPOSED EQUIPMENT PLANS <br />A-2 EXISTING & PROPOSED NORTHEAST ELEVATIONS <br />A-3 DETAILS <br />A3.1 BATTERY SYSTEM REQUIREMENTS <br />RF-1 ANTENNA PLANS & SCHEDULES <br />E-1 SCHEMATIC GROUNDING PLAN <br />E-1.1 GROUNDING DETAILS <br />PROJECT INFORMATION <br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4 <br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^ <br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1 <br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS <br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY <br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH) <br />MOUNTED NEAR EQUIPMENT ON THE GROUND <br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO <br />HEADS(RRH) <br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT <br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S <br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4- <br />DC POWER CABLES & (1) 112- FIBER CABLE <br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND <br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION <br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6) <br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU <br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT <br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY <br />CABINET <br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW <br />CONVERTERS IN (E) TE43 CABINET <br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz <br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43 <br />CABINET <br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S <br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET <br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET <br />PER RFDS REV 2.0 DATED 12-19.2016 <br />SCOPING TRACKER DATED 01-24-2017 <br />OF <br />-enName] <br />'13/2017 <br />JMMERCIAL <br />FT&T REMOVE/REPLACE (3) ANTENNAS <br />RADIO UNITS <br />Date: v ob Site Set Fire/Planning Lt <br />YfY(W .......... <br />r-PROJEC- INFO <br />WA6808 <br />EVERETT GOLF <br />& COUNTRY CLUB <br />6107 BERKSHIRE DRIVE <br />EVERETT, WA 98203 <br />SNOHOMISH COUNTY <br />—ISSUFO FOR: <br />CCONSTRUCTION <br />rREV::DATE: =ISSUED FOR: BY <br />DRAWN BY: =CHK-. APV : r <br />L DMO MIND MWO <br />CURRENT ISSUEDAIE: <br />03-03-17 <br />1, S /i jl <br />4 lb <br />JURISDICTIONAL APPROVAL: <br />PROPRIETARY INFORMATION. <br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY <br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY <br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS <br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION <br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS <br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE <br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5 <br />SIRC.IL Y PRCw'BJED <br />DRAWING TITLE'. <br />TITLE SHEET <br />r DRAWING NUM8FR <br />T-1 <br />TOP OF STRUCTURE: t130.0' (MONOPOLE) <br />BASE OF STRUCTURE t0.d A.V!SL (ASSUMED) <br />GENERAL INFORMATION. <br />1. PARKING REQUIREMENTS ARE UNCHANGED. (NON ASSIGNED TECH PARKING) <br />2. TRAFFIC IS UNAFFECTED <br />DRAWING INDEX <br />DWG DESCRIPTION <br />T-1 TITLE SHEET <br />G-1 GENERAL NOTES <br />A-1 SITE PLAN <br />A-1.1 EXISTING ENLARGED SITE PLAN <br />A-12 EXISTING & PROPOSED EQUIPMENT PLANS <br />A-2 EXISTING & PROPOSED NORTHEAST ELEVATIONS <br />A-3 DETAILS <br />A3.1 BATTERY SYSTEM REQUIREMENTS <br />RF-1 ANTENNA PLANS & SCHEDULES <br />E-1 SCHEMATIC GROUNDING PLAN <br />E-1.1 GROUNDING DETAILS <br />PROJECT INFORMATION <br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4 <br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^ <br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1 <br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS <br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY <br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH) <br />MOUNTED NEAR EQUIPMENT ON THE GROUND <br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO <br />HEADS(RRH) <br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT <br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S <br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4- <br />DC POWER CABLES & (1) 112- FIBER CABLE <br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND <br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION <br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6) <br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU <br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT <br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY <br />CABINET <br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW <br />CONVERTERS IN (E) TE43 CABINET <br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz <br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43 <br />CABINET <br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S <br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET <br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET <br />PER RFDS REV 2.0 DATED 12-19.2016 <br />SCOPING TRACKER DATED 01-24-2017 <br />OF <br />-enName] <br />'13/2017 <br />JMMERCIAL <br />FT&T REMOVE/REPLACE (3) ANTENNAS <br />RADIO UNITS <br />Date: v ob Site Set Fire/Planning Lt <br />YfY(W .......... <br />r-PROJEC- INFO <br />WA6808 <br />EVERETT GOLF <br />& COUNTRY CLUB <br />6107 BERKSHIRE DRIVE <br />EVERETT, WA 98203 <br />SNOHOMISH COUNTY <br />—ISSUFO FOR: <br />CCONSTRUCTION <br />rREV::DATE: =ISSUED FOR: BY <br />DRAWN BY: =CHK-. APV : r <br />L DMO MIND MWO <br />CURRENT ISSUEDAIE: <br />03-03-17 <br />1, S /i jl <br />4 lb <br />JURISDICTIONAL APPROVAL: <br />PROPRIETARY INFORMATION. <br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY <br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY <br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS <br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION <br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS <br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE <br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5 <br />SIRC.IL Y PRCw'BJED <br />DRAWING TITLE'. <br />TITLE SHEET <br />r DRAWING NUM8FR <br />T-1 <br />PROJECT INFORMATION <br />1. REMOVE (3) GSM PANEL ANTENNAS IN POSITION 4 <br />2 REPLACE (3) GSM PANEL ANTENNAS IN POSITION 1 Y^ <br />(3) NEW LTE PANEL ANTENNAS IN POSITION 1 <br />3. INSTALL (3) NEW WCS 230OMHz REMOTE RADIO HEADS <br />(RRH) MOUNTED NEAR (E) ANTENNA ARRAY <br />4. INSTALL (3) NEW 85CMHz REMOTE RADIO HEADS (RRH) <br />MOUNTED NEAR EQUIPMENT ON THE GROUND <br />5. UTILIZE (E) GSM COAX FOR &90MFiz REMOTE RADIO <br />HEADS(RRH) <br />6. INSTALL (1) FIBER SLACK BOX NEAR EQUIPMENT <br />7. INSTALL JUMPERS FROM LTE ANTENNAS TO NEW RRH'S <br />B. INSTALL (1) NEW SURGE SUPPRESSION UNIT W1 (2) 3J4- <br />DC POWER CABLES & (1) 112- FIBER CABLE <br />THIS SITE IS EQUIPPED WITH (26) MARATHON BATTERIES AND <br />(6) CORDEX RECTIFIERS. THIS SITE REQUIRES THE ADDITION <br />OF (2) MARATHON BATTERIES FOR A TOTAL OF (28) AND (6) <br />COROEX RECTIFIERS TO MEET ATT-002-290-347-V9 BBU <br />RUNTIME REQUIREMENTS. THIS SITE IS NOT COMPLIANT <br />9. INSTALL (2) MARATHON BATTERIES TO (E) TE40 BATTERY <br />CABINET <br />10 INSTALL (1) NEW LTE CONVERTER SHELF W1 (2) NEW <br />CONVERTERS IN (E) TE43 CABINET <br />11. INSTALL (3) 15 AMP BREAKERS FOR NEW WSC 230OMHz <br />RRH'S AT NEW LTE CONVERTER SHELF IN (E) TE43 <br />CABINET <br />12. INSTALL (3) 15 AMP BREAKERS FOR NEW 850MHz RRH'S <br />AT NEW LTE CONVERTER SHELF IN (E) TE43 CABINET <br />13. INSTALL (1) DC6 SURGE PROTECTOR IN (E) TE43 CABINET <br />PER RFDS REV 2.0 DATED 12-19.2016 <br />SCOPING TRACKER DATED 01-24-2017 <br />OF <br />-enName] <br />'13/2017 <br />JMMERCIAL <br />FT&T REMOVE/REPLACE (3) ANTENNAS <br />RADIO UNITS <br />Date: v ob Site Set Fire/Planning Lt <br />YfY(W .......... <br />r-PROJEC- INFO <br />WA6808 <br />EVERETT GOLF <br />& COUNTRY CLUB <br />6107 BERKSHIRE DRIVE <br />EVERETT, WA 98203 <br />SNOHOMISH COUNTY <br />—ISSUFO FOR: <br />CCONSTRUCTION <br />rREV::DATE: =ISSUED FOR: BY <br />DRAWN BY: =CHK-. APV : r <br />L DMO MIND MWO <br />CURRENT ISSUEDAIE: <br />03-03-17 <br />1, S /i jl <br />4 lb <br />JURISDICTIONAL APPROVAL: <br />PROPRIETARY INFORMATION. <br />DO NOT SCALE DRAWINGS CONTRACTOR NWST VERIFY <br />ALL DWNSN).1S AND ADVISE CONSULTANTS OF ANY <br />ERRORS AND ONSSICNS. ALL PREV*US ISSUES OF THIS <br />DRAWING ARE SUPERSEDED BY THE LATEST REVLSION <br />THE NIFORTdATIOH CONTAWED IN THS SET Of DOCVWNIS <br />IS PROPRIETARY BY NATURE ANY USE OR DISCLOSURE <br />OTHER THAN WHICH IS RELATED TO HAWED CLENT 5 <br />SIRC.IL Y PRCw'BJED <br />DRAWING TITLE'. <br />TITLE SHEET <br />r DRAWING NUM8FR <br />T-1 <br />0 <br />GEL JOB NUMBER LTE 3C-4C 16-(Wr17 <br />ill <br />