My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6107 BERKSHIRE DR A T AND T ANTENNA 2021-12-10
>
Address Records
>
BERKSHIRE DR
>
6107
>
A T AND T ANTENNA
>
6107 BERKSHIRE DR A T AND T ANTENNA 2021-12-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 9:41:13 AM
Creation date
12/9/2021 9:41:50 AM
Metadata
Fields
Template:
Address Document
Street Name
BERKSHIRE DR
Street Number
6107
Tenant Name
A T AND T ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
127 Ft Monopole Tower Structural Analysis <br />Project Number 37518-0703.001.7805, Application 423837, Revision 1 <br />Notes: <br />1) Existing Equipment <br />2) Equipment To Be Removed <br />Table 3 - Design Antenna and Cable Information <br />February 19, 2018 <br />CCI BU No 823967 <br />a'e-4,_. <br />'Center . ' <br />Mounting Le emberLineA <br />tenna <br />� <br />l+lumber <br />Feed' <br />' <br />Of . <br />Level,i t) Elevation <br />Antennas <br />Mar4ufact i er <br />Antenna odel <br />M <br />of Feed <br />Line <br />'(in)' <br />(ft) <br />Lines: <br />Size <br />i <br />3) ANALYSIS PROCEDURE <br />Table 4 - Documents Provided <br />3.1) Analysis Method <br />tnxTower (version 7.0.5.1), a commercially available analysis software package, was used to create a <br />three-dimensional model of the tower and calculate member stresses for various loading cases. <br />Selected output from the analysis is included in Appendix A. <br />3.2) Assumptions <br />1) Tower and structures were built in accordance with the manufacturer's specifications. <br />2) The tower and structures have been maintained in accordance with the manufacturer's <br />specification. <br />3) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br />specified in Tables 1 and 2 and the referenced drawings. <br />4) Wind loading governs. Seismic forces have been inputted as user defined loads for use within <br />tnxTower. The foundation, anchor rods, flanges, and base plate have been analyzed for the <br />reactions from the wind loading analysis. <br />This analysis may be affected if any assumptions are not valid or have been made in error. Paul J. <br />Ford & Company should be notified to determine the effect on the structural integrity of the tower. <br />tnxTower Report - version 7.0.5.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.