Laserfiche WebLink
EXHIBIT A - SCOPE OF WORK <br />PROJECT OVERVIEW <br />This project involves the replacement of an existing built-up roofmg system with a new built-up roofmg system at <br />the 21,530 square foot Filter Building located at the City of Everett's Water Filter Plant. The building is rectangular <br />in shape with a raised area for ventilation that runs the lengthwise down the middle of the roof and is framed in <br />precast concrete double tee joists and concrete walls. 2812 architecture will design the new roofmg system. 2812 <br />architecture will prepare specifications and drawings for the proposed roofmg system. 2812 architecture will also <br />provide structural details to supplement the roofing drawings if necessary, to obtain the building permit <br />This contract will includes 150 hours of miscellaneous on -call architectural services for Public Works. <br />Task 1 FILTER BUILDING REROOF <br />Sub Task 1 — Preliminary Design <br />2812 architects will evaluate existing conditions and collect field measurements. Subtasks include: <br />1.1 Provide one site visit to confirm project dimensions <br />1.2 Obtain and review available existing drawings and historical documents. <br />1.3 Prepare preliminary plans. <br />Sub Task 2 — Construction Documents <br />2812 architects will provide final design documents, which will include plans for the proposed project. Subtasks <br />include: <br />2.1 Prepare 100% specifications. <br />2.2 Prepare architectural drawings with details. <br />2.2 Provide bid estimate. <br />Sub Task 3 — Bidding <br />3.1 Finalize documents and specifications for bidding as necessary. <br />3.2 Attend pre -bid meeting. <br />3.3 Prepare one bid addendum as necessary. <br />3.4- Assist with bid evaluation as necessary. <br />Sub Task 4 — Construction Administration <br />4.1 Provide construction support as required to construct the improvements. <br />4.2 Respond to bid RFI's (not to exceed 4 RFI's) <br />4.3 Working with the City's project manager prepare a punch list associated with the work when construction has <br />been substantially completed. <br />Assumptions <br />• The City is responsible for front end specifications, such as general conditions. <br />• City will pay all applicable permitting fees. <br />• The City will be responsible for the preparation and advertisement of all bid documents. <br />• City project manager will be responsible for day-to-day construction administration activities. <br />