Laserfiche WebLink
Intake & Approval Sheet (V (FOR PERMIT STAFF ONLY) 0 PERMIT # S IAO3 — UDS <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />❑No ❑Yes , <br />Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: []Update Existing El New System <br />[]Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: []Update Existing ❑New System <br />❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No <br />Add'I RCW 64.55 does required prior to final? Oyes ❑ No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: <br />Approved By: Date: <br />-% <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />❑Fire Sprinklers []FireAlarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: l <br />SST � <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />Qwegayftreementls:�,tka�� <br />Nonresidential Use <br />Q6 <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before al? ❑Yes ❑No <br />"In Lieu" Fee: Type: A unt $ <br />School Impact Fee: Total $ <br />Calculated: Cr?dit: <br />❑Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />Approved B Date: <br />PUBLIC WORKS " <br />Intake OK by: Date: <br />............................... ................ ........................................... ......... ............... ......................... <br />.,....,........ <br />Intake Comments: PIN Worksheet Needed if. <br />`Sys Dev Eval ❑Traffic Mit Eval <br />=Site Work or Drainage Proposed <br />�Backflow Prevention for high hazard: <br />,(dental, medical, animals, mortuary, hospital, <br />,supportive housing) <br />i.................................................................................................................................................-. <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />[]This project also has a separate concurrent PW Review (Green Folder) <br />AND [Create Green Folder ❑Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ Will be Issued separately (separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />Z <br />L. <br />