Laserfiche WebLink
� 0 _' <br />• 1 Intake & Approval Sheet (FOR PERMIT STAFF ONL � PERMIT # 0D <br />BUILDING <br />Intake OK b . Date: G <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />❑No ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing ❑New System El Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing El New System El Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes ❑ No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: <br />Approved By: Date: 10 l <br />u <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />❑Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Date: <br />Intake Comments: Assign To: L l^�Q <br />�I- /f7 Vfiv!�i�l/5-/111-Spy <br />Z11 <br />(fibraAttac <br />Project No. kel`h �lP <br />❑ Route to Historic Reviewer <br />OK to Route to Other Departments <br />Hold in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes 9No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />El Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: �, 0ZL4 Le, net <br />enet UC c <br />Approved B Date: g <br />PUBLIC WORKS <br />Intake OK by: `a Date: 4 f 7-3 , LO I. 6 <br />----------------------------------------- <br />Intake Comments: Comments: ; PW Worksheet Needed if. <br />—EwL,,.i t -66,4CA .,.r R-ov-i : ❑Sys Dev Eval ❑Traffic Mit Eval <br />1g000..+1D S.oCwAL-rC. ; El Site Work or Drainage Proposed <br />y 5� SF 'j AvEp 4"A ❑Backflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, hospital, <br />:supportive housing) <br />: ----------------------------------------- <br />PRoute this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br />® This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ WIII be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By'—,-)- ' �, )� Date: <br />