Laserfiche WebLink
0 <br />James Bronder <br />From: JONATHAN FARRELL <JONATHAN@gsheating.com> <br />Sent: Wednesday, March 11, 2020 16:15 <br />To: James Bronder <br />Subject: RE: M2003-034 4925 Evergreen Way Comments <br />Attachments: Project Narrative and Mechanical Plan 3-11-20.pdf <br />Good afternoon James, <br />have the weights listed on the cover sheet of the existing unit as well as the new unit. the new York unit use's the same <br />size curb as the unit that is on the roof now, so no curb adaptor will be needed. and the listed weight includes the <br />economizer. I did have a typo on it so the attached file have the right weight listed. I will work on getting an engineer to <br />get you the loads on this one. <br />Have a great day <br />Jonathan D. Farrell <br />(C) 425-309-6507 <br />(0) 425-252-4402 <br />From: James Bronder <JBronder@everettwa.gov> <br />Sent: Wednesday, March 11, 2020 3:37 PM <br />To: JONATHAN FARRELL <JONATHAN@gsheating.com> <br />Subject: M2003-034 4925 Evergreen Way Comments <br />Hi Jonathan, <br />Do you know if the weight comparisons include the addition of a curb adapter and economizer for the proposed <br />mechanical unit? If they don't, can you please send an update to the weight comparison and if needed, please have a <br />structural engineer look at the existing members if the revised weight comparison exceeds more than 5% per IEBC 2015 <br />Sec 707.2. <br />Thank you, <br />_ James Bronder, P.E., S.E. <br />Associate Engineer — Plans Examiner I Permit Services <br />425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />EVERETT Hours: M/W/Th/F: 7:30am-12:00pm & 1:00pm-3:00pm; Tu: 1:00pm-3:00pm <br />everettwa.gov I Facebook I Twitter <br />