Laserfiche WebLink
12/3/2021 <br />7:35:47AM <br />City of Everett <br />INSPECTION ACTIVITY REPORT <br />Page 1 <br />Permit No. E1402-065 <br />Applied 2/11/2014 <br />Approved 2/11/2014 <br />Issued 2/11/2014 <br />Parent Permit No. <br />Site Address 3409 FEDERAL "E <br />Applicant Lot <br />Owner HART THOMAS C Block <br />Contractor OWNER Tract <br />Description REPAIR & REPLACE WIRING <br />Notes <br />Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br />8/8/2014 12/13/2018 ElecRoughIn TRA Unable to inspect, <br />No access <br />8/8/2014 8/8/2014 ElecRoughIn TRA Approval See notes OK rough electrical/service <br />Note: <br />1) Install smoke detectors, 1 in entry <br />bedroom, 1 in hall outside bedroom, one on <br />every floor <br />2) Install straps at mast <br />8/8/2014 <br />8/8/2014 <br />ElecService <br />TRA <br />7/9/2015 <br />12/12/2018 <br />StatusReview <br />MCB <br />8/10/2015 <br />Letter <br />MEM <br />9/11/2015 <br />9/11/2015 <br />Consultation <br />TRA <br />3/2/2016 <br />3/2/2016 <br />ElecRoughIn <br />TRA <br />11/1/2016 <br />Letter <br />MEM <br />11/15/2016 <br />12/13/2018 <br />Final Elec <br />TRA <br />6/6/2017 6/6/2017 Elec Other SKB <br />7/14/2017 7/14/2017 ElecService SKB <br />12/11/2017 12/11/2017 ELEC ROUGH IN SKB <br />4/4/2018 4/5/2018 ELEC 03-ROUGH SKB <br />IN <br />Approval <br />Send Letter <br />Expiring, respond by <br />9-12-15 <br />PartialApproval OK to extend permit <br />180 days <br />Approval <br />Expired, 14 day <br />grace period <br />Corr Reqd See notes <br />Corr Reqd <br />PartialApproval <br />CORRECTION <br />CORRECTION See notes <br />5/14/2018 <br />5/14/2018 <br />ELEC 03-ROUGH <br />SKB <br />APPROVAL <br />IN <br />2/5/2019 <br />2/5/2019 <br />PERMIT <br />TAH <br />APPROVAL <br />EXTENSION TO <br />EXTENSION <br />08/04/2019 <br />8/26/2019 <br />8/29/2019 <br />PERMIT <br />TKJ <br />APPROVAL <br />file under review <br />EXTENSION <br />4/10/2020 <br />4/10/2020 <br />PERMIT <br />KLC <br />APPROVAL <br />Due to COVID-19 <br />EXTENSION <br />10/16/2020 <br />10/16/2020 <br />PERMIT <br />KLC <br />EXTENSIONA <br />COVID <br />EXTENSION <br />EXTENSION <br />4/19/2021 <br />4/19/2021 <br />PERMIT <br />KLC <br />EXTENSION A <br />COVID <br />EXTENSION <br />EXTENSION <br />1) Not complete. <br />2) Dishwasher must be GFCI. <br />3) Washing machine must be GFCI. <br />4) Sleeve switch at basement. <br />5) Arc fault protection required for all 120 <br />volt circuits except bath plugs. <br />6) Smoke detectors required all bedrooms. <br />Remove plumbing conduit from electrical <br />for sub panel <br />Not ready <br />OK sub panel. <br />Add smoke detector outside of bedrooms <br />upstairs. <br />Use a 3 conductor with ground between <br />smoke detectors. <br />Close unused opening on stairs junction <br />box. Ground and install mud ring on stairs <br />junction box, provide 6" of conductors at <br />stairs junction box. Mechanically make all <br />grounds. <br />INSP12 <br />