My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.4.2 Design-Build Fee will be adjusted as follows for any changes in the Work as set forth in a <br /> Change Order and in accordance with the requirements of Article 9 of the General Conditions. It is agreed <br /> that Design-Builder shall receive a fee for overhead and profit of Fifteen percent (15%) of the additional <br /> Cost of the Phase 2 Work incurred for that Change Order. <br /> 7.5 Cost of the Phase 2 Work. <br /> 7.5.1 Cost of the Phase 2 Work includes only those items expressly defined in this Section 7.5.1 <br /> that are reasonably incurred by Design-Builder in the proper performance of the Phase 2 Work. The Cost <br /> of the Phase 2 Work shall not include any Pass-Through Costs (as defined in Section 7.5.3 hereof), <br /> Construction General Conditions Work (as defined in Section 7.3 hereof), or costs intended to be covered <br /> by the Design-Build Fee(as defined in Section 7.4 hereof). For the avoidance of doubt, any confusion about <br /> the categorization of cost items between the Cost of the Phase 2 Work and Pass-Through Costs shall be <br /> resolved in favor of Pass-Through-Costs. Further, any confusion about the categorization of cost items <br /> between the Cost of the Phase 2 Work and Construction General Conditions Fee or Design-Build Fee shall <br /> be resolved in favor of Construction General Conditions Fee and Design-Build Fee, respectively. The Cost <br /> of the Phase 2 Work shall include only the following: <br /> 7.5.1.1 Except for those supervisory and administrative personnel who are covered by the <br /> General Conditions Fee(Exhibit D)and employees billed at all-inclusive billing rates(Exhibit E),wages of <br /> direct employees of Design-Builder performing the Work at the Site or,with Owner's agreement,at locations <br /> off the Site. <br /> 7.5.1.2 Except for those supervisory and administrative personnel who are covered by the <br /> General Conditions Fee (Exhibit D) and employees billed at all-inclusive billing rates (Exhibit E), wages <br /> or salaries of Design-Builder's personnel engaged in the performance of the Work and who are located at <br /> the Site or working off-Site to assist in the production or transportation of material and equipment necessary <br /> for the Work. <br /> 7.5.1.3 Except for those supervisory and administrative personnel who are covered by <br /> the General Conditions Fee(Exhibit D)and employees billed at all-inclusive billing rates(Exhibit E),wages <br /> or salaries of Design-Builder's personnel stationed at Design-Builder's principal or branch offices, but only <br /> to the extent such personnel perform tasks directly associated with the Project. <br /> 7.5.1.4 A multiplier of One Hundred Seventy percent(170%)shall be applied to the wages <br /> and salaries of the employees of Design-Builder covered under Sections 7.5.1.1 through 7.5.1.3 hereof to <br /> account for employee labor burden, including payroll taxes, pension costs, insurance and other fringe <br /> benefits. <br /> 7.5.1.5 Payments properly made by Design-Builder to Subcontractors and Design <br /> Consultants for performance of portions of the Work. <br /> 7.5.1.6 Costs, including acquisition, transportation, inspection, testing, storage, and <br /> handling of materials, furnishings, equipment, and supplies incorporated or reasonably used in completing <br /> the Work. <br /> 7.5.1.7 Costs of removal of debris and waste from the Site. <br /> 7.5.1.8 All fuel and utility costs incurred in the performance of the Work. <br /> 7.5.1.9 The cost of defending suits or claims for infringement of patent rights arising from <br /> the use of a particular design, process, or product required by Owner, paying legal judgments against <br /> Design-Builder resulting from such suits or claims, and paying settlements made with Owner's consent. <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.