James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.7.5 Whenever the actual cost for an Allowance Item is more than or less than the stated <br /> Allowance Value, the Design-Builder shall report such difference to Owner so that Owner can maintain a <br /> running tally of Allowance Item costs against Allowance Values. Prior to final payment, the Contract Price <br /> shall be adjusted accordingly by Change Order, subject to Section 7.7.4. The amount of the Change Order <br /> shall reflect the difference between actual costs incurred by Design-Builder for all Allowance Items and the <br /> total Allowance Value. <br /> Article 8 <br /> Procedure for Payment <br /> 8.1 Phase 1 Payments. Phase 1 Services shall be paid by Owner based on the not-to-exceed Phase <br /> 1 price and the all-inclusive billing rates and labor categories both set forth in Exhibit E(Supporting Pricing <br /> Information). No markups beyond those included in Exhibit E shall be added to billings from any <br /> subconsultants or subcontractors for Phase 1 services. All-inclusive billing rates and labor categories shall <br /> not be subject to any overtime pay obligations incurred by Design-Builder nor any rate increases during <br /> Phase 1. <br /> 8.2 Phase 2 Payments. <br /> 8.2.1 Progress payments will be made monthly for work duly certified, approved, and performed <br /> during the calendar month preceding the Application in accordance with the following procedure: <br /> 8.2.1.1 Draft Application. In accordance with the current City of Everett Construction <br /> Management Payment Schedule, Design-Builder shall submit to Owner a report on the <br /> current progress of the Work as compared to Design-Builder's Construction Schedule, and <br /> a draft, itemized application for payment for work performed during the current calendar <br /> month on a form supplied or approved by Owner. This shall not constitute a payment <br /> request. Design-Builder and Owner shall confer regarding the current progress of the Work <br /> and the amount of payment to which Design-Builder is entitled. Owner may on occasion <br /> request Design-Builder to provide data substantiating Design-Builder's right to payment, <br /> such as copies of requisitions from Subcontractors of any tier, and reflecting retainage as <br /> provided elsewhere in the Contract Documents. <br /> 8.2.1.2 Payment Request. After Design-Builder and Owner have met and conferred <br /> regarding the updated draft application, and Design-Builder has furnished all progress <br /> information required and all data requested by Owner under 8.2.1.1 above, Design-Builder <br /> shall submit, in accordance with the current City of Everett Construction Management <br /> Payment Schedule, Design-Builder's Application for Payment for Work completed during <br /> the previous month in accordance with Article 6 of the General Conditions on a form <br /> supplied or approved by Owner. Among other things, the Application shall state that <br /> prevailing wages have been paid in accordance with the pre-filed statements of intent to <br /> pay prevailing wages on file with Owner and that all payments due Subcontractors of any <br /> tier from Owner's payment the prior month have been made. <br /> 8.2.1.3 Disputed Amounts. If Design-Builder believes it is entitled to payment for <br /> Work performed during the prior calendar month in addition to the agreed-upon amount, <br /> Design-Builder may, also by the tenth day of the month, submit to Owner along with the <br /> approved payment request a separate written payment request specifying the exact <br /> additional amount due, the category in the Schedule of Values in which the payment is <br /> due, the specific Work for which the additional amount is due, and why the additional <br /> payment is due. Furthermore, Design-Builder and all Subcontractors shall file with Owner <br /> by the tenth day of the month certified copies of all payroll records relating to the additional <br /> amount due. <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.