My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF <br /> EVERETT <br /> Reservoir 3 Project <br /> Progressive Design-Build Contract Between <br /> Owner and Design-Builder <br /> This CONTRACT is made and entered into as of 2021,by and between the following parties, for services <br /> in connection with the Project identified below. <br /> OWNER: <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, Washington 98201 <br /> DESIGN-BUILDER: <br /> James W Fowler Co. <br /> PO Box 489 <br /> Dallas, Oregon 97338 <br /> PROJECT: <br /> City of Everett Reservoir 3 Structural Improvements <br /> In consideration of the mutual covenants and obligations contained herein, Owner and Design-Builder agree as set <br /> forth herein. <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.