My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit B.Owner's Project Criteria <br /> 31.Occupational Safety and Health Administration (OSHA) <br /> 32.Portland Cement Association (PCA) <br /> 33.Precast/Prestressed Concrete Institute (PCI) <br /> 34.Puget Sound Clean Air Agency (PSCAA) <br /> 35.Snohomish County Health Department <br /> 36.Steel Deck Institute (SDI) <br /> 37.Structural Engineers Association of Washington (SEAW) <br /> 38.Steel Structures Painting Council (SSPC) <br /> 39.Uniform Plumbing Code <br /> 40.United States Environmental Protection Agency (USEPA) <br /> 41.Washington Administrative Code (WAC) <br /> • WAC 246-290-200, 220, and 235 <br /> 42.Washington State Department of Health (WSDOH) <br /> 43.Washington State Environmental Protection Agency (WA SEPA) <br /> 44.Washington Safety and Health Act (WA SHA) <br /> 45.Washington Industrial Safety and Health Act (WISHA) <br /> 46.Washington Department of Ecology (WA DOE) <br /> 47.Washington Department of Labor & Industries (WA DOL&I) <br /> 48.Washington Model Toxic Control Act (MTCA) <br /> 49.Water Environment Federation (WEF) <br /> 4 Design, Performance, and Construction Criteria <br /> The Design-Builder shall design and construct the Reservoir 3 Structural Improvements <br /> Project in accordance with the following criteria. Table 1 includes Design and <br /> Performance Requirements, and Table 2 includes Construction Requirements. <br /> Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.