Laserfiche WebLink
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit B.Owner's Project Criteria <br /> 31.Occupational Safety and Health Administration (OSHA) <br /> 32.Portland Cement Association (PCA) <br /> 33.Precast/Prestressed Concrete Institute (PCI) <br /> 34.Puget Sound Clean Air Agency (PSCAA) <br /> 35.Snohomish County Health Department <br /> 36.Steel Deck Institute (SDI) <br /> 37.Structural Engineers Association of Washington (SEAW) <br /> 38.Steel Structures Painting Council (SSPC) <br /> 39.Uniform Plumbing Code <br /> 40.United States Environmental Protection Agency (USEPA) <br /> 41.Washington Administrative Code (WAC) <br /> • WAC 246-290-200, 220, and 235 <br /> 42.Washington State Department of Health (WSDOH) <br /> 43.Washington State Environmental Protection Agency (WA SEPA) <br /> 44.Washington Safety and Health Act (WA SHA) <br /> 45.Washington Industrial Safety and Health Act (WISHA) <br /> 46.Washington Department of Ecology (WA DOE) <br /> 47.Washington Department of Labor & Industries (WA DOL&I) <br /> 48.Washington Model Toxic Control Act (MTCA) <br /> 49.Water Environment Federation (WEF) <br /> 4 Design, Performance, and Construction Criteria <br /> The Design-Builder shall design and construct the Reservoir 3 Structural Improvements <br /> Project in accordance with the following criteria. Table 1 includes Design and <br /> Performance Requirements, and Table 2 includes Construction Requirements. <br /> Page 4 of 12 <br />