Laserfiche WebLink
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit B.Owner's Project Criteria <br /> Design-Builder shall coordinate disinfection of the reservoir and refill with the Owner's <br /> Representative. The City will conduct disinfection, and operate reservoir valves during <br /> refill and disinfection operations. <br /> The reservoir shall not be put back on-line without written approval from the Owner's <br /> Representative. <br /> Page 11 of 12 <br />