My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.14 Contract Price is defined or described in Section 2.3.1.1 of the Contract. <br /> 1.2.15 Contract Time(s) are the dates for Substantial Completion, Acceptance and Final <br /> Completion set forth in, or calculable from, Article 6 of the Contract. <br /> 1.2.16 Cost of the Phase 2 Work is defined or described in Section 7.5 of the Contract. <br /> 1.2.17 Day or Days shall mean calendar days unless otherwise specifically noted in the Contract <br /> Documents. <br /> 1.2.18 Design-Build Team is comprised of the Design-Builder, the Design Consultant (Engineer <br /> of Record), and Key Subcontractors (Key Firms) identified by the Design-Builder in its proposal in <br /> response to the Owner's Request for Proposals. The Key Firms are identified in Section 10.4 of <br /> the Contract. <br /> 1.2.19 Design-Builder is James W Fowler, Co.. <br /> 1.2.20 Design-Builder's Contingency is defined or described in Section 7.6.2 of the Contract. <br /> 1.2.21 Design-Build Fee is defined or described in Section 7.4 of the Contract. <br /> 1.2.22 Design Builder's Representative is defined or described in Section 10.2.2 of the Contract. <br /> 1.2.23 Design Builder's Senior Representative is defined or described in Section 10.2.1 of the <br /> Contract. <br /> 1.2.24 Design Consultant or Engineer of Record is a qualified, licensed design professional <br /> employed or retained to furnish design services required under the Contract Documents.A Design <br /> Sub-Consultant is a qualified, licensed design professional who is not an employee of the Design <br /> Consultant, but is retained by the Design Consultant or employed or retained by anyone under <br /> contract to Design Consultant, to furnish design services required under the Contract Documents. <br /> The Engineer of Record shall be a professional engineer licensed in the state of Washington. <br /> 1.2.25 Differing Site Conditions is defined or described in Section 4.2.1 of these General <br /> Conditions of Contract. <br /> 1.2.26 Electronic Data is defined or described in Section 12.1.1 of these General Conditions of <br /> Contract. <br /> 1.2.27 Final Application for Payment is defined or described in Section 6.7 of these General <br /> Conditions of Contract and 8.4 of the Contract. <br /> 1.2.28 Final Completion is the date on which all Work, except for warranties, is complete in <br /> accordance with the Contract Documents, including but not limited to, any items identified in the <br /> punch list and the submission of all documents set forth in Section 6.7.2 of these General <br /> Conditions of Contract. <br /> 1.2.29 Force Majeure Events are unanticipated events that are beyond the control of both Design- <br /> Builder and Owner, including the events of war, floods, national or regional labor disputes (but not <br /> labor disputes involving Design-Builder), earthquakes, pandemics, epidemics, adverse weather <br /> conditions not reasonably anticipated, and other acts of God. Force Majeure Events shall not <br /> include known events or conditions (and associated Legal Requirements) in existence at the time <br /> of execution of the GMP Amendment, including but not limited to existing laws, regulations or other <br /> known impacts associated with COVID-19. <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.