My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.3 Pursuant to Section 2.3.1.4 of the Contract, Design-Builder shall prepare and submit a <br /> schedule for the execution of the Phase 2 Work for Owner's review and response (Project <br /> Schedule). The Project Schedule shall indicate the dates for the start and completion of the various <br /> stages of Work, including the dates when Owner information and approvals are required to enable <br /> Design-Builder to achieve the Contract Time(s). The Project Schedule shall be revised as required <br /> by conditions and progress of the Work, but such revisions shall not relieve Design-Builder of its <br /> obligations to complete the Work within the Contract Time(s), as such dates may be adjusted in <br /> accordance with the Contract Documents. Owner's review of, and response to, the Project <br /> Schedule shall not be construed as relieving Design-Builder of its complete and exclusive control <br /> over the means, methods, sequences and techniques for executing the Work. <br /> 2.1.4 The parties will meet within seven(7)days after execution of the Contract to discuss issues <br /> affecting the administration of the Work and to implement the necessary procedures, including <br /> those relating to submittals and payment, to facilitate the ability of the parties to perform their <br /> obligations under the Contract Documents. <br /> 2.2 Design Professional Services. <br /> 2.2.1 Design-Builder shall, consistent with applicable state licensing laws, provide through <br /> qualified, licensed design professionals employed by Design-Builder, or procured from qualified, <br /> independent licensed Design Consultants, the necessary design services, including architectural, <br /> engineering and other design professional services, for the preparation of the required drawings, <br /> specifications and other design submittals to permit Design-Builder to complete the Work consistent <br /> with the Contract Documents. Nothing in the Contract Documents is intended or deemed to create <br /> any legal or contractual relationship between Owner and any Design Consultant. <br /> 2.3 Standard of Care for Design Professional Services. <br /> 2.3.1 The standard of care for all design professional services performed to execute the Work <br /> shall be the(i)the care and skill necessary to comply with the requirements of this Contract and(ii) <br /> care and skill ordinarily used by members of the design profession practicing under similar <br /> conditions at the same time and locality of the Project, whichever is greater. Notwithstanding the <br /> preceding sentence, if the Owner's Project Criteria contains specific performance standards for any <br /> aspect of the Work,the design professional services shall be performed to achieve such standards. <br /> 2.4 Design Development Services. <br /> 2.4.1 Design-Builder and Owner shall, consistent with any applicable provision of the Contract <br /> Documents, agree upon any interim design submissions that Owner may wish to review, which <br /> interim design submissions may include design criteria, drawings, diagrams and specifications <br /> setting forth the Project requirements. Interim design submissions shall be consistent with the <br /> Basis of Design Documents, as the Basis of Design Documents may have been changed through <br /> the design process set forth in this Section 2.4.1 hereof and Section 2.1.1 of the Contract. On or <br /> about the time of the scheduled submissions, Design-Builder and Owner shall meet and confer <br /> about the submissions, with Design-Builder identifying during such meetings, among other things, <br /> the evolution of the design and any changes to the Basis of Design Documents, or, if applicable, <br /> previously submitted design submissions. Changes to the Basis of Design Documents, including <br /> those that are deemed minor changes under Section 9.3 hereof, shall be processed in accordance <br /> with Article 9. Minutes of the meetings, including a full listing of all changes, will be maintained by <br /> Design-Builder and provided to all attendees for review. Following the design review meeting, <br /> Owner shall review and approve the interim design submissions and meeting minutes in a time that <br /> is consistent with the turnaround times set forth in Design-Builder's schedule. <br /> 2.4.2 Design-Builder shall submit to Owner Construction Documents setting forth in detail <br /> drawings and specifications describing the requirements for construction of the Work. The <br /> Construction Documents shall be consistent with the latest set of interim design submissions, as <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.