Laserfiche WebLink
2.7.5 Design-Builder shall coordinate the activities of all Subcontractors. If Owner performs other <br /> work on the Project or at the Site with separate contractors under Owner's control, Design-Builder <br /> agrees to reasonably cooperate and coordinate its activities with those of such separate contractors <br /> so that the Project can be completed in an orderly and coordinated manner without unreasonable <br /> disruption. <br /> 2.7.6 Design-Builder shall keep the Site reasonably free from debris, trash and construction <br /> wastes to permit Design-Builder to perform its construction services efficiently, safely and without <br /> interfering with the use of adjacent land areas. Upon Substantial Completion of the Work, or a <br /> portion of the Work, Design-Builder shall remove all debris, trash, construction wastes, materials, <br /> equipment, machinery and tools arising from the Work or applicable portions thereof to permit <br /> Owner to occupy the Project or a portion of the Project for its intended use. <br /> 2.7.7 The Design-Builder and each Subcontractor engaged in the Work shall pay all workers, <br /> laborers, or mechanics employed in the performance of any part of the Work an amount not less <br /> than the prevailing rate of wages established for each trade or occupation as established by the <br /> Washington Department of Labor and Industries. It is the Design-Builder's responsibility to <br /> determine the appropriate classifications and verify the applicable prevailing wage rates in effect at <br /> the time the proposal submittal is due. A worker, laborer, or mechanic whose type of work is not <br /> covered by any of the prevailing wage classifications and rates established by the Department of <br /> Labor and Industries shall be paid not less than the rate of wage listed for the classification which <br /> most nearly corresponds to the type of work to be performed, or as determined by the Industrial <br /> Statistician of the Washington Department of Labor and Industries. <br /> The hourly minimum rates for wages and fringe benefits can be obtained at the following URL: <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp <br /> Printed copies of the current prevailing wage rates are available for viewing at City of Everett Public <br /> Works, 3200 Cedar St, Everett, WA and the City will mail a hard copy of the prevailing wage rates <br /> upon written request received within seven days of the Proposal Submittal Date. <br /> 2.7.7.1 State wages: In accordance with RCW 39.12.020, the Design-Builder shall post <br /> on the Project site a copy of the approved Statements of Intent to Pay Prevailing Wages <br /> for the Design-Builder and every subcontractor of any tier. In addition, the Design-Builder <br /> shall post contact information for the Department of Labor and Industries regarding where <br /> a complaint about prevailing wages may be filed. <br /> 2.7.7.2 Owner does not guarantee that labor can be procured for the minimum wages <br /> provided for in the applicable prevailing wages. The prevailing rates of wages listed are a <br /> minimum only, below which Design-Builder cannot pay, and they do not constitute a <br /> representation that labor can be procured for the minimum listed. Design-Builder shall <br /> ascertain the wages above the minimum set forth that may have to be paid. <br /> 2.7.7.3 Before commencing the Work, Design-Builder and all Subcontractors, regardless <br /> of tier, shall file with the Owner a"Statement of Intent to Pay Prevailing Wages" approved <br /> by the Washington State Department of Labor and Industries certifying the rate of hourly <br /> wage to be paid each classification of worker, laborer, or mechanic to be employed upon <br /> the Work by the Design-Builder and Subcontractors. Such rates of hourly wage shall not <br /> be less than the prevailing wage rate. Before any payment is made by the Owner of any <br /> sums due under this contract, the Owner must receive from the Design-Builder and any <br /> Subcontractor, regardless of tier, a copy of the approved "Statement of Intent to Pay <br /> Prevailing Wages." Also following the Final Acceptance of the project, the Owner must <br /> receive from the Design-Builder and each Subcontractor, regardless of tier, a copy of the <br /> "Affidavit of Wages Paid" approved by the State Department of Labor and Industries. The <br /> Design-Builder and each Subcontractor shall pay all fees associated with and make all <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 9 <br />