My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
necessary to enable Design-Builder to perform the Work. Owner is further responsible for all costs, <br /> including attorneys' fees, incurred in securing these necessary agreements. <br /> 3.3 Owner's Representative. <br /> 3.3.1 Owner's Representative shall be responsible for providing Owner-supplied information and <br /> approvals in a timely manner to permit Design-Builder to fulfill its obligations under the Contract <br /> Documents. Owner's Representative shall also provide Design-Builder with prompt notice if it <br /> observes any failure on the part of Design-Builder to fulfill its contractual obligations, including any <br /> errors, omissions or defects in the performance of the Work. Provided, however, that the failure of <br /> Owner's Representative to provide such notice shall not relieve Design-Builder from the obligation <br /> to perform the Work and deliver the Project in a manner consistent with its obligations under the <br /> Contract Documents. Owner's Representative shall communicate regularly with Design-Builder <br /> and shall be vested with the authority to act on behalf of Owner. <br /> 3.4 Government Approvals and Permits. <br /> 3.4.1 Owner shall obtain and pay for all necessary permits, approvals, licenses, government <br /> charges and inspection fees set forth as an Owner responsibility in the Phase 2 Proposal. <br /> 3.4.2 Owner shall provide reasonable assistance to Design-Builder in obtaining those permits, <br /> approvals and licenses that are Design-Builder's responsibility. <br /> 3.5 Owner's Separate Contractors. <br /> 3.5.1 Owner is responsible for all work performed on the Project or at the Site by separate <br /> contractors under Owner's control. Owner shall contractually require its separate contractors to <br /> cooperate with, and coordinate their activities so as not to interfere with, Design-Builder in order to <br /> enable Design-Builder to timely complete the Work consistent with the Contract Documents. <br /> Article 4 <br /> Hazardous Conditions and Differing Site Conditions <br /> 4.1 Hazardous Conditions <br /> 4.1.1 Unless shown or indicated in Contract Documents or identified in the Contract Documents <br /> to be within the scope of the Work, Design-Builder is not responsible for any Hazardous Conditions <br /> encountered at the Site. Upon encountering any Hazardous Conditions, Design-Builder will stop <br /> Work immediately in the affected area and duly notify Owner and, if required by Legal <br /> Requirements, all government or quasi-government entities with jurisdiction over the Project or <br /> Site. <br /> 4.1.2 Upon receiving notice of the presence of suspected Hazardous Conditions, Owner shall <br /> take the necessary measures required to ensure that the Hazardous Conditions are remediated or <br /> rendered harmless. Such necessary measures may include Owner retaining qualified independent <br /> experts to(i)ascertain whether Hazardous Conditions have actually been encountered, and, if they <br /> have been encountered, (ii) prescribe the remedial measures that Owner must take either to <br /> remove the Hazardous Conditions or render the Hazardous Conditions harmless. <br /> 4.1.3 Design-Builder shall be obligated to resume Work at the affected area of the Project only <br /> after Owner provides it with written certification that (i) the Hazardous Conditions have been <br /> removed or rendered harmless and (ii) all necessary approvals have been obtained from all <br /> government and quasi-government entities having jurisdiction over the Project or Site. <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.