My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner will have the right to discharge the claim or lien and hold Design-Builder liable for costs and <br /> expenses incurred, including attorneys' fees. <br /> 7.4 Design-Builder's General Indemnification. Design-Builder's General Indemnification. In <br /> addition to any other indemnification of defense obligation that Design-Builder may have under the <br /> Contract Documents, Design-Builder shall defend, indemnify, and hold Owner harmless from and <br /> against all claims,demands,losses,damages,or costs, including but not limited to damages arising <br /> out of bodily injury or death to persons and damage to property, caused by or resulting from: <br /> 7.4.1 The sole negligence of Design-Builder or any of its Subcontractors; <br /> 7.4.2 The concurrent negligence of Design-Builder, or any Subcontractor, but only to the extent <br /> of the negligence of Design-Builder or such Subcontractor; and <br /> 7.4.3 The use of any design, process, or equipment which constitutes an infringement of any <br /> United States patent presently issued,or violates any other proprietary interest, including copyright, <br /> trademark, and trade secret. <br /> In any action against Owner and any other entity indemnified in accordance with this section, by <br /> any employee of Design-Builder, its consultants of any tier, Subcontractors, Sub-subcontractors, <br /> agents, or anyone directly or indirectly employed by any of them, the indemnification obligation of <br /> this section shall not be limited by a limit on the amount or type of damages, compensation, or <br /> benefits payable by or for Design-Builder or any consultant or Subcontractor under RCW Title 51, <br /> the Industrial Insurance Act,or any other employee benefit acts. In addition, Design-Builder waives <br /> immunity as to Owner only, in accordance with RCW Title 51.7.5 <br /> Article 8 <br /> Time <br /> 8.1 Obligation to Achieve the Contract Times. <br /> 8.1.1 Design-Builder agrees that it will commence performance of the Work and achieve the <br /> Contract Time(s) in accordance with Article 6 of the Contract. <br /> 8.2 Delays to the Work. <br /> 8.2.1 If Design-Builder is delayed in the performance of the Work due to acts, omissions, <br /> conditions, events, or circumstances beyond its control and due to no fault of its own or those for <br /> whom Design-Builder is responsible, the Contract Time(s) for performance shall be reasonably <br /> extended by Change Order. Delays attributable to and within the control of a Subcontractor or <br /> supplier shall be deemed to be delays within the control of Design-Builder. By way of example, <br /> events that may entitle Design-Builder to an extension of the Contract Time(s) include acts or <br /> omissions of Owner or anyone under Owner's control (including separate contractors), changes in <br /> the Work, Differing Site Conditions, Hazardous Conditions, and Force Majeure Events. Design- <br /> Builder shall make all reasonable efforts to prevent and mitigate the effects of any delay, whether <br /> occasioned by an act of Force Majeure or otherwise. <br /> 8.2.2 Design-Builder is not entitled to a change in Contract Time unless the progress of the Work <br /> on the critical path is delayed and completion of the Work within Contract Time is delayed. A <br /> Request for a Change Order that includes a request for an adjustment in the Contract Time shall <br /> be delivered to Owner in accordance with Article 9 and, in addition to any requirements in Article <br /> 9, shall: <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.