Laserfiche WebLink
0®F s'"1"..t , <br /> O4:16 464: <br /> 18908 Highway 99 - Suite B, Lynnwood, WA 98036 • Seattle Line 206.464.0441 <br /> rto 0 Lynnwood Line 425.672.4730 • Fax Line 206.464.0415 <br /> June 18. 2019 <br /> Forma Construction <br /> 016 1 St Avenue South, Suite 400 <br /> Seattle, Washington 98134 <br /> Attention: Lori Nicholson <br /> RE: City of Everett Service Center 3110 Pine Street Everett, Washington. <br /> Roofing Material Weights: <br /> 5/8" CDX Plywood: 1.5 lbs per square foot <br /> Modified Sopra G Base Sheet: .35 lbs per sf(Where the Sopravap'R <br /> :emporary rooting is not used) <br /> Sopravap"R": .18 lbs per sf (Where temporary roofing is needed for <br /> plywood replacement) <br /> 2" Polyiso 4'x8' Insulation: 12.8 lbs each x 5-6 pcs <br /> '/2"`per foot slope 4' x 4' tapered Polyiso: 3.85 lbs each x about 34 pcs <br /> (Only for crickets) <br /> 1" Pre-primed Dens Deck: 1.2 lbs per sf <br /> Sopralene Flam Stick Base: .58 lbs per sf <br /> Sopralene Flam 180 Smooth: .83 lbs per sf- (Only in waterways) <br /> Sopralene Flam 250 FR GR: 1.16 lbs per sf <br /> If you have any questions or need any additional information, please do not <br /> hesitate to call. Thank you. <br /> Sincerely, <br /> Sound Roof Services, Inc. <br /> (3 <br /> Brian Storey, Ow er <br />