Laserfiche WebLink
O <br />N <br />ry <br />�I <br />_C <br />W <br />Q <br />0 <br />m <br />M� <br />O <br />O <br />co <br />rn <br />�r- <br />N <br />M <br />a� <br />U <br />Q <br />m <br />0 <br />0 <br />O <br />c <br />M <br />LO <br />N <br />co <br />O <br />O <br />co <br />co <br />m <br />Q <br />00 <br />M <br />R <br />N <br />N <br />0 <br />N <br />6� <br />OFFICE FRONT ASSEMBLY BY <br />BANK VENDOR. INSTALL ON <br />STRUCTURAL SLAB. <br />CORNER BEAD - TYPICAL <br />2 LAYERS 5/8" GYPSUM WALL <br />i UNDERSIDE OF STRUCTURE <br />BOARD TO EXTEND TO <br />SEALANT <br />UNDERSIDE OF DECK <br />02 04 <br />A00.42 <br />METAL STUD <br />A00.42 <br />SOUNDGUARD ISOLATOR <br />i CONT. SLIP TRACK <br />BY MARINOWARE <br />CERAMIC TILE FLOOR i <br />METAL STUDS ATTACH <br />METAL STUDS ATTACH <br />CENTRAL LOBBY SIDE i TO STRUCTURE ABOVE <br />TO STRUCTURE ABOVE <br />j i `: ;;. 2 LAYERS 5/8" GYPSUM WALL <br />LIGN <br />? ALIGN '' BOARD TO EXTEND TO <br />w <br />OFFICE JAMB DETAIL <br />SCALE: 3" = 1'41 05 <br />n A K u n "A M n 1 A/ A Mr! <br />/r\ crnnrrnn�i-r <br />)OOR PULL <br />rc\ QTn0CC0nAI'r <br />2' <br />BOXED HEADER <br />SCHEDULED PARTITION <br />METAL CLIP <br />HOLLOW METAL FRAME <br />SCHEDULED DOOR <br />SEE PARTITION SCHEDU <br />C <br />UNDERSIDE OF DECK <br />SOUNDGUARD ISOLATOR <br />BY MARINOWARE <br />METAL STUD <br />SCHEDULED CEILING <br />SEE RCP <br />SHADOW MOLDING <br />AS SPECIFIED <br />SCHEDULED CEILING <br />SEE RCP <br />CORNER BEAD, <br />TYPICAL <br />OFFICE FRONT DOOR <br />ASSEMBLY BY BANK <br />VENDOR <br />SCHEDULED CARPET <br />SCHEDULED CERAMIC TILE <br />TRANSITION STRIP <br />TS-1 <br />•' 1001ki NOYM1DIUM11 I• : 1• ! I a r1l"al4 9.2 "1 1 A • i II 0 1 I rmllr 111•1 W' <br />STEEL KID FRAME 16 <br />GA. PRIME PAINTED <br />ANCHORS <br />WALK OF <br />4 1/2" <br />STOREFRONT BEYOND <br />I <br />(E) STOREFRONT <br />GLASS/ALUMINUM <br />DOOR AS SCHEDULED <br />1" TEMPERED INSULATING UNIT <br />�LE THRESHOLD - <br />:SSIBILITY <br />METAL ANCHOR <br />SCHEDULED DO( <br />noUBLE STUDS <br />HEDULED PARTITION <br />LLOW METAL FRAME <br />• 4 1 ' ' : 1: a fmd I' <br />!C\ C`T!'I�CC�(I AIT /C\ CT/'I�CCOII AIT <br />SEE PARTITION SCHEDU <br />■ <br />oil <br />1f1 <br />f� <br />UNDERSIDE OF STRUCTURE <br />SEALANT <br />CONT. SLIP TRACK <br />METAL STUDS ATTACH <br />TO STRUCTURE ABOVE <br />2 LAYERS 5/8" GYPSUM WALL <br />BOARD TO EXTEND TO <br />UNDERSIDE OF DECK <br />SOUNDGUARD ISOLATOR <br />BY MARINOWARE <br />METAL STUD <br />SCHEDULED CEILING - <br />SEE RCP <br />SHADOW MOLDING <br />AS SPECIFIED <br />SCHEDULED CEILING - <br />SEE RCP <br />CONT. BOX BEAM <br />CORNER BEAD, <br />TYPICAL <br />OFFICE FRONT SYSTEM BY <br />BANK VENDOR. INSTALL ON <br />STRUCTURAL SLAB. <br />SCHEDULED CARPET <br />SCHEDULED CERAMIC TILE <br />4 1/2" X 4 1/2" BALL II <br />BEARING HINGES U <br />N <br />UL LISTED LEVEL-2 <br />FIBERGLASS (BULLET <br />RESISTANT) , <br />4a Q^.. a <br />DOOR SECTION T TELLER LINE 1 6 SCALE. 3" - 1 STOREFRONT HEAD AND SILL DETAILS STOREFRONT JAMB DETAILS -SINGLEDO SCALE. 3" OFFICE BULK A TAIL GLASS PANEL <br />SCALE: 3" = 1'-0" SCALE: 3" = 1'-0„ _ -0 04 <br />_ 1 - -0 <br />r.. <br />JLL Third Party Project Management <br />800 5th Avenue <br />Seattle, WA 98104 <br />Contact: Jim Foster <br />jim.foster@am.jll.com <br />Tel 206.375.4788 <br />Date Description <br />03/19/2021 ISSUE FOR PERMIT <br />Seal I Signature <br />ss6'<: <br />ARCHIT13CT <br />1MVIS CHU <br />sTATs oi? o <br />Project Name <br />GREENTREE PLAZA <br />Project Number <br />032.4596.003 <br />Description <br />Scale <br />f_f 11 <br />M <br />© 2021 Gensler <br />