Laserfiche WebLink
P. <br />0 <br />N <br />Of <br />i <br />c <br />a� <br />W <br />a <br />0 <br />m� <br />M <br />0 <br />0 <br />rn <br />cV <br />M <br />N <br />m <br />0 <br />0 <br />O <br />co <br />rn <br />LO <br />N <br />CY) <br />O <br />0 <br />0 <br />M <br />d <br />6 <br />N <br />N <br />O <br />CV <br />SHEET NOTES <br />01 WALL TO RECEIVE LEVEL 5 FINISH AND BE PRIMED WITH <br />"BENJAMIN MOORE FRESH START HIGH HIDING ALL <br />PURPOSE PRIMER", TINTED WITH P-20 PAINT PRIOR TO WALL <br />COVERING INSTALL. GC TO ALLOW FOR 10-DAY CURING TIME <br />OF PRIMER MINIMUM BEFORE WALL COVERING INSTALL AT A <br />MINIMUM TEMPERATURE OVER 60 DEGREES F. <br />02 FRP WAINSCOT TO BE 42" HIGH AND WIDTH TO MATCH <br />SERVICE SINK. <br />03 FLOOR TILE TO STOP AT BASE OF TELLER LINE <br />04 TELLER LINE MILLWORK AND UNDERCOUNTER STEEL TO BE <br />INSTALLED DIRECTLY ON TOP OF CONCRETE FLOOR SLAB <br />GENERAL NOTES <br />A. REFER TO FINISH SCHEDULE ON A00.30. <br />B. REFER TO A00.00 AND A00.30 FOR EXTENT OF <br />FINISHES AND FOR ADDITIONAL NOTES. <br />C. ALL PARTITIONS SHALL BE PAINTED P-15 AND TO <br />RECEIVE B-11, U.N.O. <br />D. ALL FLOORS SHALL HAVE CARPET CPT-5, U.N.O. <br />E. ALL GYP. CEILINGS TO BE PAINTED P-15, U.N.O. <br />F. PROVIDE STRAIGHT, FLUSH BASE AT CARPETED <br />AREAS AND COVED BASE AT HARD FLOORING <br />SURFACES, U.N.O. <br />G. SEE GENERAL NOTES ON SHEET A00.40 FOR <br />DOOR FINISHES. <br />H. ENSURE SURFACES TO RECEIVE FINISHES ARE <br />CLEAN, TRUE AND FREE OF IRREGULARITIES. DO <br />NOT PROCEED WITH WORK UNTIL SATISFACTORY <br />CONDITIONS HAVE BEEN CONFIRMED. <br />i. SEE GENERAL NOTES ON POWER AND <br />COMMUNICATIONS PLAN FOR COVER PLATE <br />COLORS. <br />LEGEND <br />NOT IN CONTRACT <br />ffiffieA MILLWORK <br />CHANGE IN FLOOR FINISH <br />WALL FINISH <br />X <br />CX <br />BASE FINISH <br />EXTENT OF WALL FINISH <br />XXX FLOOR FINISH <br />SPECIAL FINISH - REFER TO <br />SCHEDULE FOR INSTALLATION <br />XXX REQS. <br />EXTENT OF WALL FINISH <br />ALIG N <br />FLOOR TILE START POINT <br />GREENTREE PLAZA <br />305 SE EVERETT MALL WAY, STE 31 <br />EVERETT, WA 98208 <br />SERIAL NUMJMANH. ID: WA4-158 <br />NRSP VERSION: 3.0 <br />BULLETIN: 04-2020 <br />nl Ge s er <br />1200 Sixth Avenue Tel 206.654.2100 <br />Suite 500 Fax 206.654.2121 <br />Seattle, WA 98101 <br />United States <br />JLL <br />JLL Third Party Project Management <br />800 5th Avenue <br />Seattle, WA 98104 <br />Contact: Jim Foster <br />jim.foster@am.jll.com <br />Tel 206.375.4788 <br />Date Description <br />03/19/2021 ISSUE FOR PERMIT <br />Seal l Signature <br />8951 CISTE ED <br />CH!TrCT <br />I Milts CHU <br />op wasammw <br />Project Name <br />GREENTREE PLAZA <br />Project Number <br />032.4596.003 <br />Description <br />Scale <br />1/4 If = 1'-0if <br />A050,01 <br />© 2021 Gensler <br />Cl) <br />