My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1700 13TH ST 2021 3RD FLOOR Plans 2022-11-30
>
Address Records
>
13TH ST
>
1700
>
3RD FLOOR
>
Plans
>
1700 13TH ST 2021 3RD FLOOR Plans 2022-11-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 2:37:50 PM
Creation date
12/14/2021 8:37:44 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1700
Tenant Name
3RD FLOOR
Permit
B2102-023
Year
2021
Notes
TI build out of extg 3rd fl sheel space for the install of new medical imaging equip
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4_1 <br />_C' <br />Ube <br />0 <br />T 11 <br />0 <br />VO <br />I Yj � <br />M <br />(3) <br />I n S tr.c t i o n s <br />This form is to be used by Project Manager, Contractor, and Service Engineer. Information is used to develop and determine site ready <br />date,, <br />Be sure to contact the Zone Installation Specialist (ZlS), Field Service Engineer (FSE), or National Support Specialist (NSS) if you have <br />questions concerning any of these checklist items. <br />Ceifing (Hard): Installed and painted. <br />El Ceiling (Drop -In): Installed, <br />1 -1 <br />J Customer Site Preparation: Venffied per Philips Final Drawings. <br />Delivery Path and Truck Parking: Has been checked with the customer and lead FSE including verifying floor loading, delivery <br />route, elevator capacity, height, width and depth clearances, and a plan for bad weather. <br />E] Doors: installed. <br />ED <br />Drawings <br />(Final).- <br />Shows all roonn obstacles to <br />include millwork, lighting overlay, structure overlay, med gases and plumbing. <br />Flooring: <br />Installed <br />and covered vJth protective <br />covering (i.e. scratch protection). <br />0 <br />0. Glass: Installed. <br />l Pern omits and InspM - Completed by applicable governing authorities. Method statement available and safety meetings <br />1 10 <br />attended (OSHPD, AHCA). <br />El Site Is Safe To Work: PPE requirements identified (Construction and Hospital). No open Mains, slippery floors, sharp edges, <br />o If <br />hazardous goods on site. <br />0 1 <br />Sprinklers: Installed. <br />El Transport & Handling Tools: Crane, forklift, wheels and trolleys have been specified with the LMP/rigging company. <br />Walls: Installed and final finished, (i.e. final coat painted and/or tiled). <br />Existing Equipment: Is dismant[clad and removed from the site. <br />Eli Floor Levelness: Checked with Laser Level and is level per Philips Final Drawings. <br />E r -1 Sysitem Orientation: Verified per Philips Final Drawings. <br />[11 Table isocenter: Verified per Philips Final Drawings. <br />01 ERB Conductor Bar.- Instafled per Philips Final Drawings. All Philips -provided electrical boxes and contractor -provided raceway <br />are grounded to the ERB. <br />01J. Mains Power Supply-, Installed per Philips Final Drawings. (including impedance, isolated grounds, it size verified, and <br />dist.ribution unit has been installed). <br />UPS: Fully installed per Philips Final Drawings, and startup has been scheduled with vendor. <br />X Video Connection Boxes: Locations, video sources, and display destinations are verified with customer, and <br />El Ceiling Obstructions.- Verify there are no obstructions where Philips rails will be installed. <br />El Ceiling Plate for Equipment Rack (EP Boom) (If applicable): Installed and leveled per Philips Final Drawings. <br />Ceiling Unistruts (P1001 or equal),: Installed and leveled per Philips Final Drawings. <br />Clearances: Verified to the closest obstacles (i.e. wa�ls, cabinets), in order to lift up the C-arm, monitor support, <br />etc. <br />El Fixing Blocks: Provided by Philips, verify the block properly it in the Unistrut channel with no obstructions, <br />as designed. <br />FlexArm Clearance (if applicable): Verified per Philips Final Drawings. <br />El Door Interlock Switch: If required, is installed per Philips Final Drawings. <br />EJ X-Ray in Use or Warning Light: If required, is installed per Philips Final Drawing& <br />p1111111 1111 p 111111 Jill <br />El Physicist: If required, verify the Physicist has been scheduled. <br />WaTutImN <br />747 V <br />'"'awl <br />M <br />10711W <br />p RIM IN <br />ion, IN! <br />:E <br />0 <br />00 <br />-W <br />Igo <br />0 <br />N <br />> <br />0 <br />lr-- <br />0 <br />co <br />CD <br />C.0 <br />CO <br />E <br />0 <br />0 <br />C\j <br />E <br />Z <br />>0, <br />c� <br />0 <br />0 <br />0 <br />CD <br />QD <br />Z <br />CL <br />o <br />E <br />0 <br />UJ <br />0 <br />CD <br />CM <br />> <br />0 <br />r-- <br />C:1 <br />co <br />a) <br />Lo <br />N <br />-0 <br />>_ <br />0 <br />CD <br />u8) <br />E <br />:3 <br />N <br />C) <br />co <br />Z <br />Q0 <br />0 <br />00 <br />THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.