Laserfiche WebLink
4 <br />3 <br />55' 4" V.I.F. LEASE LIME <br />"I <br />Komi <br />Q <br />CONSTRUCTIONL PLAN <br />,:s,:,':. a <: .j.,.::, t.'; <br />. n... .. S. 'f.' u _ ,.. aY .. _ ., 3 P <br />,i �Q � �.� l i X:. u,... �+R1 v}. „Y h R.3� yv y� .M''F,�.i �. ,^Y:,9 �'=Y`�'Y`t �,.J..}d, i?'2`� �' ;�" �`ht,^ 5 ���3 <br />�' �"y <br />:...., <br />,: <br />�. h .1 h '.c v .. ..., ,.. .. . ... ..a.. <br />.,. ✓ 4 3' .. ., ,<.,..: _ e sa ..,, .... Y. P <br />...-.. ... X .� L`.. S 'JX <br />':U :ram ...a r., .: ..�.•.... . -....- ...: a ,�,�r" x, i, X,? 'Z�... �.,:.. <br />,.. <br />.. t ?r <br />�'v � 1 .M'- C S. h.. 1 S'::d .'S.: ,'x +u. fS.;:,.e fir Y,Y...• :, <br />,5/a yb. „{* r.n,, 4�^=^ ;"'t. .,- ...�.,. :4 <br />.,.Y <br />NOTES <br />EXISTING STOREFRONT SYSTEM, GLAZING, AND DOOR(S) TO REMAIN. <br />EXISTING EXTERIOR WALL AND/OFF CONSTRUCTION TO REMAIN. PATCH AND REPAIR AS REQUIRED. <br />- AS INDICATED IN THESE PLANS. <br />PREPARE EXISTING CONCRETE FLOOR SURFACE FOR INSTALLATION OF NEW FLOORING MATERIALS �, <br />SEE SPECIFICATIONS FOR ADDITIONAL FLOOR PREPARATION NOTES. <br />4 <br />EXISTING MOP SINK TO BE REMOVED. <br />5 <br />EXISTING DASHED FLOORIWALL FIXTURES AND SIGNAGE TO BE REMOVED IN THEIR ENTIRETY. <br />6 <br />LEASE LINE. <br />7 <br />EXISTING INTERIOR DOOR TO BE REMOVED IN ITS ENTIRETY. <br />8 <br />EXISTING INTERIOR WALL TO BE REMOVED IN ITS ENTIRETY. <br />9 <br />EXISTING TOILET ROOM, PLUMBING FIXTURES AND FLOORING TO BE REMOVED IN THEIR ENTIRETY. <br />10 <br />EXISTING THRESHOLD TO REMAIN. REPLACE IF IT EXCEEDS 1/2" IN HEIGHT. <br />1 1 <br />EXISTING FIRE EXTINGUISHER TO BE REMOVED. <br />12 <br />EXISTING ELECTRICAL PANEL(S) TO REMAIN. <br />13 <br />EXISTING PARTITION WALL TO REMAIN. PATCH AND REPAIR AS NEEDED TO RECEIVE NEW FINISHES AS SPECIFIED IN THESE PLANS. <br />14 <br />EXISTING DEMISING WALL TO REMAIN, PATCH AND REPAIR AS REQUIRED. <br />PORTION OF EXISTING INTERIOR WALL TO BE REMOVED UP TO 7 0® A.F.F. FOR A NEW INVENTORY AND TOILET OPENING AS INDICATED IN <br />15 <br />THESE PLANS. <br />16 <br />EXISTING STRUCTURAL COLUMN TO REMAIN. REMOVE ALL FINISHES AND PREPARE FOR NEW FINISHES AS INDICATED IN THESE PLANS, <br />17 <br />EXISTING FLOOR MOUNTED IT/DATA RACK TO BE REMOVED. <br />18 <br />EXISTING DRINKING FOUNTAIN TO BE REMOVED. <br />19 <br />EXISTING WALK OFF MAT TO BE REMOVED. <br />1. GENERAL CONTRACTOR AND/OR SUBCONTRACTORS <br />SHALL REVIEW THE EXISTING FACILITY TO DETERMINE <br />THE EXTENT OF DEMOLITION REQUIRED TO INSTALL THE <br />NEW WORK. A WRITTEN OUTLINE OF ALL REQUIRED <br />DEMOLITION SHALL BE SUBMITTED TO T-MOBILE <br />DESCRIBING THE FOLLOWING (BUT NOT LIMITED TO): <br />1A CONDITION OF EXISTING POWER PANELS AND <br />TRANSFORMERS; IBILITY FOR RELOCATION AND <br />FEASIBILITY <br />REFURBISHING, OR NEED FOR REPLACEMENT DUE TO <br />AGE OR EXISTING CONDITION. <br />1.2 CONDITION OF EXISTING GYPSUM BOARD ON EXISTING <br />DEMISING WALLS AND RECOMMENDATION OR WHETHER <br />TO REMOVE EXISTING OR REUSE TO BE DETERMINED IN <br />FIELD. <br />1.3 SUMMARIZE RECOMMENDATIONS FOR REUSE OF <br />EXISTING MATERIALS, EQUIPMENT, AND ACCESSORIES. <br />ONCE REFURBISHED TO A LIKE -NEW CONDITION, <br />ITEMIZE THE CREDIT TO THE CONTRACT. <br />1.4 TENANT G.C. SHALL NOTIFY THE ARCHITECT OF ANY UN - <br />NOTED EXISTING CONDITION WHICH CONFLICTS WITH <br />THE PROJECT REQUIREMENTS AND MAY REQUIRE <br />MODIFICATION, RELOCATION, OR REMOVAL TO COMPLETE <br />THE PROJECT WITHIN 24 HOURS SO THAT THE <br />NECESSARY DRAWING REVISIONS MAYBE <br />INCORPORATED INTO THE PROJECT REQUIREMENTS. <br />1.5 IN ADDITION TO THE ABOVE, REFER TO GENERAL <br />DEMOLITION NOTES INDICATED IN SPECIFICATION <br />DIVISION 2- EXISTING CONDITIONS. <br />1.6 CONDITION OF EXISTING MECHANICAL SYSTEM; <br />FEASIBILITY OF REUSING, RELOCATION, OR <br />REFURBISHING EXISTING EQUIPMENT AND <br />DUCTWORK; AND RECOMMENDATION OF <br />REPLACEMENT, IF NECESSARY, PRIOR TO BID. <br />SEE MECHANICAL DRAWINGS FOR SCOPE OF <br />MECHANICAL WORK. <br />0 1' 21 4' <br />1. <br />CHECK MECHANICAL AND ELECTRICAL DRAWINGS PRIOR RO DEMOLITION <br />14. <br />G.C. SHALL CONSTRUCT A BARRICADE WALL AS REQUIRED. G.C. SHALL <br />WITH REGARD TO UTILIZING ANY EXISTING WIRING, LINES, COMPONENTS, <br />COORDINATE REQUIREMENTS WITH MALL PROPERTY MANAGEMENT. <br />ETC. <br />15. <br />BARRICADE GRAPHICS SHALL BE PROVIDED BY MALL UNLESS OTHERWISE <br />2. <br />PROVIDE TRASH CONTAINER AS REQUIRED AT LOCATION TO SUIT <br />REQUESTED. G.C. SHALL ENGAGE T-MOBILE'S SIGN VENDOR FOR BARRICADE <br />LANDLORD. REMOVE DEBRIS DAILY AND HAUL FROM THE SITE AT TIME TO <br />GRAPHICS AS REQUIRED. <br />SUIT LANDLORD. <br />16. <br />FIRE SPRINKLER SYSTEM TO REMAIN - G.C. TO RE -WORK/ MODIFY SYSTEM AS <br />3. <br />NOTIFY ARCHITECTS IMMEDIATELY OF ANY DISCPRENANCIES OR <br />REQUIRED FOR NEWCONSTRUCTION. VERIFY IN FIELD. <br />UNFORESEEN ITEMS NOT SHOWN ON DRAWINGS. <br />17. <br />WHERE REQUIRED BY THE LOCAL JURISDICTION, G.C. SHALL PREPARE A <br />4. <br />ALL REMOVED MATERIAL AND DEBRIS, NOT OTHERWISE DESIGNATED, <br />"RECYCLING PLAN" TO DIVERT DEBRIS FOR RECYCLING. G.C. SHALL KEEP <br />BECOMES THE PROPERTY OF THE CONTRACTOR, WHO SHALL REMOVE IT <br />RECORDS OF DIVERTED MATERIAL AS REQUIRED. G.0 TO VERIFY <br />FROM THE SITE. <br />REQUIREMENTS WITH JURISDICTION AND TO MALL OPERATIONS/ LANDLORD <br />5. <br />G.C. SHALL NOT DEMOLISH AND LOAD BEARING WALLS OR CONSTRUCTION <br />WHERE APLLICABLE. <br />THAT WILL COMPROMISE THE STRUCTURAL INTEGRITY OF THE EXISTING <br />18. <br />REMOVE ALL EXISTING INTERIOR PARTITIONS, DOORS, AND DOOR FRAMES <br />SPACE. G.G. TO NOTIFY THE ARCHITECT IMMEDIATELY OF ANY STRUCTURAL <br />SCHEDULED FOR DEMOLITION. REMOVE ALL MILLWORK, EQUIPMENT, ETC. THAT <br />CONCERNS DURING CONSTRUCTION. <br />IS ATTACHED TO PARTITIONS SCHEDULED FOR DEMOLITION. <br />6. <br />EXISTING EQUIPMENT NOT BEING USED MUST BE COMPLETELY <br />19, <br />REMOVE EXISTING HVAC CEILING DIFFUSERS AND RETURN GRILLES AS <br />REMOVED/DISPOSED OF PROPERLY, NOTHING CAN BE ABANDONED ABOVE <br />SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION! DEMOLITION <br />THE CEILING. <br />AND NEW CONSTRUCTION. MODIFY EXISTING DUCTWORK AS REQUIRED BY <br />7. <br />REMOVE EXISTING ACCOUSTICAL CEILING GRID AND TILES, LIGHT FIXTURES, <br />NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND CAP OFF SUPPLY <br />AND GYPSUM WALL BOARD SOFFITS AS SCHEDULED FOR DEMOLITION AND <br />AND RETURN DUCTS AT NEAREST SOURCE ABOVE CEILNG. <br />AS REQUIRED BY PARTITION DEMOLTION AND NEW CONSTRUCTION WORK. <br />20. <br />REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS, AND PIPING AS <br />MAINTAIN EXISTING CEILING WIRE HANGERS FOR FUTURE USE. <br />SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION <br />S. <br />REMOVE EXISTING ELECTRICAL DEVICES, OUTLETS, TELEPHONE AND DATA <br />AND NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND CAP OFF AT <br />JACKS AND THERMOSTATS IN PARTITIONS SCHEDULED FOR DEMOLITION. <br />WET STACK. <br />MODIFY EXISTING WIRING AS REQUIRED BY NEW CONSTRUCTION OR, IF NOT <br />21. <br />REMOVAL/ RELOCATION OF ALL CEILING EQUIPMENT (TYCO, FIRE ALARM, <br />REQUIRED, TERMINATE AND CAP OFF AT NEAREST PANEL OR SOURCE <br />SPRINKLER, SHOPPER TRAK, ETC.) MUST BE PERFORMED BY THE REQUIRED <br />ABOVE CEILING. <br />VENDORS. T-MOBILE'S VENDOR TO RELOCATE SECURITY CAMERAS AS NEEDED <br />9. <br />REMOVE EXISTING FLOOR FINISHES SCHEDULED FOR REMOVAL AND AS <br />PER NEW FIXTURE LAYOUT, <br />REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. PREPARE <br />22. <br />G.C. TO CONFIRM FLOOR SLAB IS SMOOTH AND LEVEL AND NOTIFY <br />EXISTING FLOOR SURFACE PER MANUFACTURER FOR INSTALLATION OF <br />CONSTRUCTION PM OF ANY DISCREPANCIES. <br />NEW FLOORING MATERIAL INDICATED IN THESE PLANS. G.C. MAY NEED TO <br />23. <br />MAINTAIN EXISTING EXITS, EMERGENCY LIGHTING, AND ILLUMINATION MEANS <br />PERFORM A MOISTURE TEST PRIOR TO ANY DEMOLITION OR NEW FLOORING <br />OF EGRESS DURING DEMOLITION AND CONSTRUCTION AS REQUIRED BY JHA <br />INSTALLATION. NEWLY REPLACED OR LIKE -NEW FINISHES MAY REMAIN AT <br />AND ALL GOVERNING CODES. <br />THE DISCRETION OF THE CONSTRUCTION PM. G.C. TO VERIFY PRIOR TO <br />24. <br />SAW -CUTTING SHOWN ON PLANS IS AN INDICATION OF THE INTENDED WORK <br />REMOVAL. PROTECT ALL NEW FLOOR FINISHES UNTIL FINAL CLEANING. <br />FOR BIDDING AND COORDINATION PUPOSES ONLY. IT IS NOT INTENDED FOR BE <br />10. <br />REMOVE ALL CONSTRUCTION DEBRIS FROM AREA. REPAIR ALL ADJACENT <br />AS SPECIFICATION OR METHOD. <br />DAMAGED SURFACES, AS NECESSARY. PREPARE ALL DAMAGED SURFACES <br />25. <br />WHEN EXISTING MECHANICAL SYSTEM IS TO REMAIN, G.C. TO CLEAN <br />FOR FINISHES AS SCHEDULED OR REFINISH TO MATCH EXISTING. <br />DUCTWORK, DIFFUSERS, AND REPLACE HVAC AIR FILTERS AFTER <br />11. <br />PROVIDE A SMOOTH, NEAT, AND CONTIUOUS APPEARANCE WHERE <br />CONSTRUCTION AND CLEANUP IS COMPLETE PRIOR TO TURNING PROJECT <br />DEMOLITION WORK MEETS ADJACENT EXISTING WORK. REMOVED EXISTING <br />OVER TO T-MOBILE. <br />FINISHES AS REQUIRED TO PROVIDE BEAT, STRAIGHT SEAMS AND <br />26. <br />DURING CONSTRUCTION, THE G.C. IS TO PROVIDE A PORTABLE FIRE <br />TRANSITIONS BETWEEN EXISTING AND MATCHING NIEl14 FINISHES. <br />EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A WITHiNG A 75 FOOR <br />12. <br />IN ACCORDANCE WITH LOCAL CODES, REPLACE ALL FIRE SUPPRESSION <br />TRAVEL DISTANCE TO ALL PORTIONS OF THE SPACE. <br />AND FIRE ALARM EQUIPMENT DISTURBED BY DEMOLITION WORK. MAINTAIN <br />INTEGRITY OF FIRE SUPPRESSION AND FIRE ALARM SYSTEMS. VERIFY IN <br />FIELD. <br />13. <br />IN THE CASE THAT THE EXISTING CABLE LINE, PHONE LINE AND BLOCK, T-1 <br />LINE AND DATA CABLING PRESENT, G.C. SHALL SALVAGE AND REWORK TO <br />FACILITATE NEW INSTALLATION. <br />12920 SE 38th STREET <br />BELLEVUE, WA 98006 <br />www.T-N4obilE).com <br />COPYRIGHT NOTICE <br />THESE DRAWINGS AND SPECIFICATIONS ARE COPYRIGHTED AND SUBJECT TO <br />COPYRIGHT PROTECTION AS AN "ARCHITECTURAL WORK" UNDER SEC. 102 OF <br />THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED JANUARY 2003. THE PROTECTION <br />INCLUDES, WITHOUT LIMITATION, THE OVERALL FORM, ARRANGEMENT AND <br />COMPOSITION OF SPACES AND ELEMENTS OF THE DESIGN. UNDER SUCH <br />PROTECTION, UNAUTHORIZED USE OF THESE DRAWINGS AND SPECIFICATIONS <br />MAY RESULT IN CESSATION OF CONSTRUCTION, BUILDING SEIZURE, AND/OR <br />MONETARY LIABILITY. <br />ARCHITECT <br />2056 Byers Roil <br />-,llj,l➢j bLlrq,Ohio 45",t2 <br />S444.8'04.7700 <br />nl 7 <br />®ga-^^ <br />"ET <br />STATE OF WASH6NSTo1N <br />0 /0 / � - <br />CONSULTING ENGINEER: <br />Lu <br />Lu <br />Lo <br />Lum <br />UJ <br />Lu <br />ui <br />i <br />i <br />DATE: July 02, 2021 <br />SCALE: AS NOTED <br />DRAWN BY: PT <br />SAP NUMBER: <br />4 3 2 1 <br />