UTILITY TRANSFORMER, <br />480/277V, 10, 4W <br />1500KVA <br />PROPOSED <br />UTILITY <br />GROUND <br />(PER <br />UTILRY) <br />METERING/MAIN BREAKER <br />SECTION <br />BONDING JUMPER <br />PER NEC 250.24(A) <br />(4),250.28(C)9250.8(A)(7) <br />SEE NOTE 2 <br />(TYP)-----__ <br />mob <br />sammIm''I'l <br />PROPOSED UTILITY CTS/PTS SHALL BE LOCATED WITHIN <br />COMPARTMENTS APPROVED BY THE UTILITY AS SHOWN IN <br />THIS DRAWING PACKAGE. <br />REACTORS TO BE WIRED AS DEPICTED IN DETAIL B OF <br />SHEET E-6. <br />3000A GE SWITCHBOARD, 277148OV, 31o, 4W 65KAIC WITH GROUND FAULT PROTECTION <br />277/UTION SECTION <br />ABB POWER UNITS <br />AVAILABLE FAULT <br />AVAILABLE FAULT <br />CURRENT BY LOCATION <br />CURRENT PROVIDED BY <br />REACTOR RESULT <br />UTILITY <br />AFC @ TRANSFORMER <br />48,135A <br />NA <br />AFC @ SWITCHBOARD <br />47,540A <br />NA <br />AVERAGE AFC @ POWER <br />4244A <br />0 <br />25KA OR GREAT ER <br />UNIT (NO REACTOR) <br />, <br />REACTORS REQUIRED <br />AFC @ POWER UNIT <br />22,535A <br />�® <br />THROUGH REACTOR <br />3000A BUSS <br />1201208V DISTRIBUTION SECTION <br />PROPOSED GFCi <br />RECEPTACLE <br />ABB CONDUIT AND WIRING SCHEDULE <br />FROM <br />TO <br />CONFIGURATION <br />(3) 750 MCM AL (THIVY, N-2) + <br />H <br />UTILITY TRANSFORMER <br />PROPOSED <br />(1) 750 MCM AL (THWN-2) NEUT <br />SWITCHBOARD <br />IN EACH OF (8) 4" CONDUIT + <br />(1) SPARE 4" CONDUIT <br />PROPOSED <br />(3) 500 MCM AL (THWN-2) + <br />SWITCHBOARD <br />PROPOSED REACTOR <br />(1) #2 AWG CU (THWN-2) EGC <br />IN (1) 3" CONDUIT <br />PROPOSED POWER <br />(3) 500 MCM AL (THWN-2) + <br />PROPOSED REACTOR <br />UNIT (EV CHARGER) <br />(1) #2 AWG CU (THWN-2) EGC <br />IN (1) 3" CONDUIT <br />PROPOSED <br />FUTURE BESS <br />(3) 3" CONDUITS + <br />SWITCHBOARD <br />EQUIPMENT <br />(3) 1 1/4" CONDUITS <br />PROPOSED POWER <br />PROPOSED DC 35OKW <br />(2) 500 MCM CU (XHHW-2) I KV + <br />U5 <br />UNIT (EV CHARGER) <br />DISPENSER (POST) DC <br />(1) #2 AWG CU (THWN-2) EGC <br />POWER <br />IN (1) 2 1/2" CONDUIT <br />PROPOSED POWER <br />PROPOSED DC 175KW <br />(2) 250 MCM CU (XHHW-2) I KV + <br />UNIT (EV CHARGER) <br />DISPENSER (POST) DC <br />(1) #2 AWG CU (THWN-2) EGC <br />POWER <br />IN EACH OF (2) 2 1/2" CONDUITS <br />PROPOSED POWER <br />PROPOSEDDC <br />(3) # 12AWG CU (THWN-2) + <br />UNIT (EV CHARGER) <br />DISPENSER (POST) <br />(1) #12,AWG CU (THWN-2) EGC <br />AUXILIARY POWER <br />IN (1) 3/4" CONDUIT <br />(1) MULTIMODE FIBER (ST/ST CONN, 4 <br />PROPOSED POWER <br />PROPOSED DC <br />STRANDS) <br />UNIT (EV CHARGER) <br />DISPENSER+ <br />(I PAIR) #16 AWG (TW/SH PAIR) <br />COMMUNICATION(POST) <br />IN (1) 1 1/2" CONDUff <br />PROPOSED POWER <br />PROPOSED POWER <br />(2) TWISTED PAIR #16 - 2 (TWISH PAIR) <br />UNIT (EV CHARGER) <br />UNIT (EV CHARGER) <br />+ (1),#2 AWG CU (THWN-2) EGC <br />IN (1) 1 1/2" CONDUIT <br />PROPOSED <br />(1) #12 AWG CU (THWN-2) + <br />UO <br />SWITCHBOARD <br />PROPOSED GFCI <br />(1) #12 AWG CU (THWN-2) NEUT + <br />120/208V SECTION <br />RECEPTACLE <br />(1) #12 AWG CU (THWN-2) EGC <br />IN (1) 3/4" CONDUIT <br />ELECTRFYAMER�CA, LLC, <br />2003 EDMUND HALL DRWE <br />SUITE 200 <br />RESTON, VRGN�A 20191 <br />END <br />6800 W 115th S7, SUITE 2292 <br />OVERLAND PARK, KS 66211 <br />(913) 458-2000 <br />0-� <br />PROJECT NO- <br />197479 <br />'31 <br />DRAWN BY: <br />RSP <br />CHECKED BY- <br />NMB <br />09/12/2018 <br />IT IS A ViOLAMN OF LAW FOR ANY PERSON, UNLESS <br />THEY ARE ACTING UNDER THE DIRECTION OF A <br />LICENSED PROFESSIONAL ENGINEER, TO ALTER TMS <br />DOCUMENT. <br />IVAIO0069 EVERETT <br />WALMART 3053 <br />1605 SE EVERETTMALL WA Y <br />EVERETT, WA 98208 <br />SHEET TITLE <br />SHEET NUMBER <br />