STRUCTURAL NOTES <br />(THESE NOTES ARE TYPICAL UNLESS NOTED OR DETAILED OTHERWISE ON DRAWINGS) <br />CODE <br />FOUNDATIONS: SOLDIER POLES <br />ANCHOR TESTING <br />ALL MATERIALS, WORKMANSHIP; DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, <br />SOILS REPORT: REPORT NO: 945216 <br />EACH GROUND ANCHOR SHALL BE TESTED. THE MAXIMUM TEST LOAD SHALL NOT EXCEED THE MANUFACTURER <br />SPECIFICATIONS, AND THE INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION, SPECIFICATIONS AND STANDARDS <br />PREPARED BY: NELSON GEOTECHNICAL ASSOICATES <br />RECOMMENDED MAXIMUM LOAD. TENDON ANCHORS SHALL RE LOADED SIMULTANEOUSLY TO THE ENTIRE <br />WHERE REFERENCED ON THE DRAWINGS ARE TO BE THE LATEST EDITION. <br />DATED: 02/19/2016 <br />TENDON. STRESSING OF A SINGLE ELEMENT OF MULTI -ELEMENT TENDONS WILL NOT BE PERMITTED. <br />DESIGN LOADS <br />SOLDIER PILE DESIGN PARAMETERS: <br />A DIAL GAUGE OR VERNIER SCALE CAPABLE OF MEASURING TO 0.001 INCHES SHALL BE USED TO MEASURE THE <br />GROUND ANCHOR MOVEMENT. THE MOVEMENT MEASURING DEVICE SHALL HAVE A MINIMUM TRAVEL EQUAL TO <br />REFER TO PRESSURE DIAGRAM <br />SOIL ADHESION: 1500 PSF <br />THE THEORETICAL ELASTIC ELONGATION OF THE TOTAL ANCHOR LENGTH AT THE MAXIMUM TEST LOAD PLUS 1 <br />STATEMENT ®F SPECIAL INSPECTIONS <br />LATERAL EARTH PRESSURES: REFER TO STRUCTURAL NOTES <br />INCH. THE DIAL GAUGE OR VERNIER SCALE SHALL BE SUPPORTED INDEPENDENT OF THE JACKING SYSTEM & <br />RETAINED STRUCTURE & SHALL BE ALIGNED SO THAT ITS AXIS IS WITHIN 5® FROM THE AXIS OF THE GROUND <br />EXCAVATIONS AND DRAINAGE INSTALLATION SHALL BE OBSERVED BY A SOILS ENGINEER RETAINED BY THE OWNER, <br />ANCHOR. <br />SPECIAL INSPECTIONS ARE REQUIRED AS INDICATED IN THE FOLLOWING TABLE. THE CONTRACTOR SHALL SUBMIT A <br />IF EXCAVATION SHOWS SOIL CONDITIONS TO BE OTHER THAN THOSE ASSUMED ABOVE, NOTIFY THE STRUCTURAL <br />WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER PRIOR TO COMMENCEMENT OF <br />ENGINEER FOR POSSIBLE FOUNDATION REDESIGN, <br />A HYDRAULIC JACK OR RAM SHALL BE USED TO APPLY THE TEST LOAD. THE JACK & PRESSURE GAUGE SHALL BE <br />WORK IN ACCORDANCE WITH CHAPTER 1704.4 OF THE IBC. <br />CALIBRATED BY AN INDEPENDENT TESTING LABORATORY AS A UNIT. THE PRESSURE GAUGE SHALL BE GRADUATED <br />FREQUENCY AND DISTRIBUTION OF REPORTS -INSPECTION REPORTS SHALL BE PROVIDED FOR EACH DAY ON SITE BY <br />ANCHOR/GROUT <br />IN 100 PSI INCREMENTS OR LESS. THE RAM TRAVEL OF THE JACK SHALL NOT BE LESS THAN THE THEORETICAL <br />SPECIAL INSPECTOR. STRUCTURAL OBSERVATION REPORTS SHALL BE PROVIDED AFTER EACH OBSERVATION. REPORTS <br />ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER 19 OF THE INTERNATIONAL BUILDING <br />ELASTIC ELONGATION OF THE TOTAL ANCHOR LENGTH AT THE MAXIMUM TEST LOAD PLUS 1 INCH. THE JACK SHALL <br />BE INDEPENDENTLY SUPPORTED & CENTERED OVER THE ANCHOR SO THAT THE ANCHOR DOES NOT CARRY THE <br />SHALL BE DISTRIBUTED TO THE CONTRACTOR, ARCHITECT, ENGINEER AND BUILDING OFFICIAL, <br />CODE. CONCRETE STRENGTHS SHALL BE VERIFIED BY 28-DAY STANDARD CYLINDER TESTS, UNLESS APPROVED <br />WEIGHT OF THE JACK. <br />OTHERWISE. GROUT STRENGTHS SHALL BE VERIFIED BY 2-INCH CUBE TESTS PER ASTM C109. <br />SPECIAL INSPECTION <br />ANCHOR LOAD TEST <br />CONCRETE MIX DESIGNS SHALL CONFORM TO THE UNIFORM BUILDING CODE. COMPRESSIVE STRENGTHI AT 28 DAYS <br />SHALL BE AS FOLLOWS: <br />AT LEAST (2) ANCHOR SHALL BE PERFORMANCE TESTED TO 200% OF THE DESIGN LOAD. ANCHORS TO BE TESTED <br />SHALL BE SELECTED BY THE GEOTECHMCAL ENGINEER. ADDITIONAL ANCHOR TESTS MAY BE REQUIRED AT THE <br />GROUTED ANCHOR <br />REQUEST OF THE GEOTECHNICAL SPECIAL INSPECTOR. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF <br />GROUTED ANCHOR f'c = 3000 PSI MIN <br />WHALERS IF REQUIRED TO LIMIT PILE DEFLECTION DURING TESTING. THE PERFORMANCE TEST SHALL BE <br />GROUTED ANCHORS <br />COMPLETED BY INCREMENTALLY LOADING THE GROUND ANCHOR IN ACCORDANCE WITH THE FOLLOWING TABLE. <br />ANCHOR TESTING X GEOTECH ENGINEER ALLOWABLE ANCHOR LOADS = PER SCHED <br />SHOP & FIELD WELDING <br />SINGLE PASS FILLET WELDS:5 5�16" X GROUTED ANCHORS SHALL BE MANUFACTURED BY DYWIDAG SYSTEMS INTERNATIONAL OR ENGINEER APPROVED <br />EQUAL. ANCHORS SHALL BE FACTORY DOUBLE CORROSION PROTECTED. REFER TO ANCHOR SCHEDULE FOR <br />FILLET WELDS > 5/16" X GROUTED DIAMETER AND ANCHOR ROD DIAMETER. <br />PARTIAL & COMPLETE PENETRATION X ANCHOR RODS SHALL CONFORM TO ASTM A722, fu = 150 KSI <br />OTHER WELDING X ALL ANCHORS SHALL BE LOCKED OFF PER THE ANCHOR SCHEDULE <br />NOTE: <br />ALL ITEMS MARKED WITH AN "X" SHALL BE INSPECTED IN ACCORDANCE WITH IBC CHAPTER 17. SPECIAL STRUCTURAL STEEL <br />INSPECTION SHALL BE PERFORMED BY A QUALIFIED TESTING AGENCY DESIGNATED BY THE OWNER. THE <br />ARCHITECT, STRUCTURAL ENGINEER, AND BUILDING OFFICIAL SHALL BE FURNISHED WITH COPIES OF ALL STRUCTURAL STEEL DESIGN, FABRICATION AND ERECTION SHALL BE IN ACCORDANCE WITH THE AISC <br />RESULTS. ANY INSPECTION FAMNG TO MEET THE PROJECT SPECIFICATIONS SHALL BE IMMEDIATELY BROUGHT "SPECIFICATION FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS", LATEST <br />TO THE ATTENTION OF THE DESIGN TEAM. EDITION. <br />SHAPES SHALL CONFORM TO ASTM A992, Fy = 50 KSL <br />ANCHOR LOADING <br />ANCHOR UNLOADING <br />LOAD <br />HOLD TIME <br />LOAD <br />HOLD TIME <br />ALIGNMENT LOAD <br />1 MINUTE <br />175% DESIGN LOAD <br />UNTIL STABLE <br />25% DESIGN LOAD <br />5 MINUTES <br />150% DESIGN LOAD <br />UNTIL STABLE <br />50% DESIGN LOAD <br />5 MINUTES <br />125% DESIGN LOAD <br />UNTIL STABLE <br />75% DESIGN LOAD <br />5 MINUTES <br />100% DESIGN LOAD <br />UNTIL STABLE <br />100% DESIGN LOAD <br />5 MINUTES <br />75% DESIGN LOAD <br />UNTIL STABLE <br />125% DESIGN LOAD <br />5 MINUTES <br />50% DESIGN LOAD <br />UNTIL STABLE <br />150% DESIGN LOAD <br />5 MINUTES <br />25% DESIGN LOAD <br />UNTIL STABLE <br />175% DESIGN LOAD <br />5 MINUTES <br />ALIGNMENT LOAD <br />UNTIL STABLE <br />200% DESIGN LOAD <br />60 MINUTES <br />SIoOP DRAWINGS <br />PLATES, ANGLES, AND RODS SHALL CONFORM TO ASTM A36, Fy = 36 KSI. <br />THE ALIGNMENT LOAD (AL) SHOULD BE THE MINIMUM LOAD REQUIRED TO ALIGN THE TESTING APPARATUS & <br />SHOP DRAWINGS FOR THE FOLLOWING ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND STRUCTURAL <br />SHOULD NOT EXCEED 5% OF THE DESIGN LOAD. DIAL GAUGES SHOULD BE SET TO ZERO AFTER THE ALIGNMENT <br />ENGIINEER FOR REVIEW PRIOR TO FABRICATION: <br />STRUCTURAL TUBING SHALL CONFORM TO ASTM A500 GRADE B, Fy = 46 KSI. <br />LOAD HAS BEEN APPLIED. <br />1. DRIVEN SOLDIER PILES 2. GROUTED ANCHORS <br />STEEL PIPE SHALL CONFORM TO ASTM A53 GRADE B, Fy = 35 KSI. <br />A CREEP TEST SHALL BE PERFORMED DURING THE 200% DL HOLD TIME. ANCHOR MOVEMENT DURING THE CREEP <br />TEST SHALL BE MEASURED & RECORDED AT 1, 2, 3, 5, 6, 10, 20, 30, 40, 50 & 60 MINUTES OF ELAPSED TIME FROM <br />SHOP DRAWINGS SHALL BE REVIEWED, REVISED AS REQUIRED FOR FIELD CONDITIONS, AND DATE STAMPED BY THE <br />BOLTS CONNECTING STEEL MEMBERS SHALL CONFORM TO ASTM A325-N. BOLTS SHALL BE 3J4"° MINIMUM, UNO <br />WHEN THE LOAD INCREMENT WAS APPLIED. <br />CONTRACTOR PRIOR TO REVIEW BY THE ENGINEER. CONTRACTOR SHALL PROVIDE (3) SETS OF SHOP DRAWINGS FOR <br />ANCHOR BOLTS SHALL CONFORM TO ASTM A307. <br />ENGINEER'S REVIEW. ALLOW TWO WEEKS FOR SHOP DRAWING APPROVAL BY ENGINEER. <br />ACCEPTABLE ANCHOR TESTS <br />ENGINEER'S <br />ENGINEERS SHOP DRAWING REVIEW IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AND CONTRACT <br />CONTRACTOR SHALE PROVIDE CONNECTION ADJUSTMENT TOLERANCES TO SATISFY THE REQUIREMENTS OF AISC <br />A LOAD TESTED OR PROOF TESTED ANCHOR WITH A 10 MINUTE HOLDCREEPTEST IS CONSIDERED ACCEPTABLE <br />DOCUMENTS. MARKINGS OR COMMENTS SHALL NOT BE CONSTRUED AS RELIEVING THE CONTRACTOR FROM <br />MANUAL OF STEEL CONSTRUCTION. <br />WHEN: THE ANCHOR CARRIES THE MAXIMUM TEST LOAD WITH LESS THAN 0.04" OF MOVEMENT BETWEEN THE 1 <br />COMPLIANCE WITH THE PROJECT PLANS AND SPECIFICATIONS. THE CONTRACTOR REMAINS RESPONSIBLE FOR <br />ALL STEEL MEMBERS, SHAPES, BOLTS, AND ACCESSORIES EXPOSED TO WEATHER SHALL BE PRIMED AND PAINTED. <br />& 10 MINUTE READINGS. <br />DETAILS AND ACCURACY, FOR CONFORMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS, FOR <br />SELECTING FABRICATION PROCESSES, FOR TECHNIQUES OF ASSEMBLY, AND FOR PERFORMING THE WORK IN A SAFE <br />WELDING <br />A LOAD TEST OR PROOF TESTED ANCHOR WITH A 60 MINUTE HOLD CREEP TEST IS CONSIDERED ACCEPTABLE <br />MANNER. <br />WHEN: THE ANCHOR CARRIES THE MAXIMUM TEST LOAD WITH LESS THAN 0,08" OF MOVEMENT PER LOG CYCLE <br />WELDING SHALL CONF0?M°TO AWS STRUCTURAL WELDING CODE", LATEST EDITION. ALL WELDING SHALL BE <br />OF THE TIME & THE CREEP RATE IS LINEAR OR DECREASING. <br />ENGINEER'S SHOP DRAWING REVIEW OF STRUCTURAL COMPONENTS DESIGNED BY OTHERS IS FOR LOADS IMPOSED <br />DONE WITH 70 KSI LOW HYDROGEN ELECTRODES. WHERE NOT CALLED OUT, MINIMUM FILLET WELD SIZE SHALL BE <br />ON THE BASIC STRUCTURE. THE COMPONENT DESIGNER IS RESPONSIBLE FOR CODE CONFORMANCE AND ALL <br />PER TABLE 5.R IN AWS D1.1, LATEST EDITION. <br />IN ADDITION TO THE ABOVE, A TESTED ANCHOR SHALL NOT EXPERIENCE A PULLOUT FAILURE AT THE MAXIMUM <br />CONNECTIONS TO THE BASIC STRUCTURE. SHOP DRAWINGS SHALL INDICATE MAGNITUDE AND DIRECTION OF THE <br />TEST LOAD. A PULLOUT FAILURE IS DEFINED AS THE LOAD AT WHICH ATTEMPTS TO INCREASE THE TEST LOAD <br />LOADS IMPOSED ON THE BASIC STRUCTURE AND SHALL BE STAMPED & SIGNED BY A PROFESSIONAL ENGINEER <br />WELDING OF REINFORCING BARS SHALL NOT BE PERMITTED UNLESS SPECIFICALLY CALLED OUT ON DRAWINGS OR <br />RESULT IN CONTINUED PULLOUT MOVEMENT OF THE TEST ANCHOR. <br />REGISTERED IN THE SAME STATE AS THE PROJECT. <br />APPROVED BY STRUCTURAL ENGINEER. WELDING OF GRADE 60 REINFORCING BARS SHALL BE PERFORMED USING <br />LOW HYDROGEN ELECTRODES.. WELDING OF GRADE 40 REINFORCING BARS SHALL BE PERFORMED USING E70XX <br />ANCHORS THAT HAVE CREEP RATES GREATER THAN SPECIFIED CAN BE INCORPORATED IN THE FINISHED WORK AT A <br />FABRICATION SHALL BEGIN ONLY AFTER SHOP DRAWINGS BEARING THE STAMP AND SIGNATURE OF THE PROJECT <br />ELECTRODES. SEE REINFORCING NOTES FOR MATERIAL REQUIREMENTS OF WELDED BARS. WELDING WITHIN 4" OF <br />LOAD EQUAL TO 1/2 OF THE FAILURE LOAD. THE FAILURE LOAD IS THE MAXIMUM LOAD CARRIED BY THE ANCHOR <br />ARCHITECT, ENGINEER OF RECORD, AND CONTRACTOR HAVE BEEN RECEIVED. <br />COLD BENDS IN REINFORCING BARS IS NOT PERMITTED. <br />AFTER THE LOAD HAS BEEN ALLOWED TO STABILIZE FOR 10 MINUTES. <br />PILING INSTALLATION <br />ALL WELDING SHALL BE DONE BY WASHINGTON ASSOCIATION OF BUILDING OFFICIALS (WABO) CERTIFIED WELDERS. <br />IF AN ANCHOR FAILS, THE CONTRACTOR SHALL BE RESPONSIBLE TO MODIFY THE DESIGN AND/OR THE <br />INSTALLATION METHODS USED IN CONSTRUCTION. ANY MODIFICATIONS BY THE CONTRACTOR THAT REQUIRE <br />REFERENCE PLAN FOR ANY BAITER PILES REQUIRED. <br />PILE CORROSION PROTECTION <br />CHANGES TO THE STRUCTURE SHALL HAVE PRIOR APPROVAL PER THE ENGINEER. <br />STEEL PILING SHALL BE DRIVEN INTO THE SUBGRADE TO A POINT OF REFUSAL BY MEANS OF A TRACTOR MOUNTED <br />PILES SHALL BE PAINTED TO PROTECT AGAINST CORROSION. BEFORE APPLYING PAINT PILES SHALL BE CLEAN AND <br />PROCEDURE/CONSTRUCTION SEQUENCING: <br />HAMMER W/ AN ENERGY RATING OF 1500 FT -LB, WITH REFUSAL BEING DEFINED AS 1 INCH OR LESS OF <br />FREE OF RUST OR DEBRIS. PAINTING SHALL CONSIST OF AN ORGANIC ZINC PRIMER COAT NOT LESS THAN 2.5 MILS <br />PENETRATION DURING 15 SECONDS OF SUSTAINED DRIVING. <br />DRY FILM THICKNESS. TOP COAT SHALL CONSIST OF AN EPDXY PAINT NOT LESS THAN 3.0 MILS DRY FILL THICKNESS. <br />PRECONSTRUCTION MEETING <br />UTILITY LOCATION/EXISTING CONDITIONS <br />PILES SHALL BE PAINTED TO 2°-0" BELOW GRADE MINIMUM. <br />_III-1 I I-1 I I - <br />CONTRACTOR SHALL CALL THE ENGINEERING INSPECTION LINE TO SET UP A PRECONSTRUCTION MEETING <br />ANY SCUFF MARKS OR SCRATCHES THAT OCCUR DURING CONSTRUCTION SHALL BE REPAIRED WITH A FIELD <br />PRIOR TO ANY SITE WORK. 60 PCF <br />THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY <br />APPLIED EPDXY PAINT. <br />FIELD SURVEYOR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE <br />CONCRETE PLACEMENT <br />ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY <br />TIMBER LAGGING/SAWN LUMBER <br />VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER <br />CONCRETE SHALL NOT BE ALLOWED TO FREE -FALL TO THE BOTTOM OF THE DRILLED HOLE, BUT SHALL EITHER <br />UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CG <br />SAWN LUMBER SHALL CONFORM TO GRADING AND DRESSING RULES, WEST COAST LUMBER INSPECTION BUREAU <br />BE TREMIED OR PUMPED INTO THE HOLE. <br />ENGINEERING ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES <br />(CLIB), LATEST EDITION. LUMBER SHALL BE THE GRADE LISTED BELOW: <br />AND SITE FEATURES PRESENTED ON THESE DRAWINGS. <br />LAGGING <br />CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE <br />ALL LAGGING SHALL BE TREATED WITH ACZA WOOD PRESERVATIVE TREATMENT WITH THE LEVELS LISTED BELOW. <br />ANY LAGGING FIELD CUT SHALL HAVE ACZA TREATMENT FIELD APPLIED TO THE CUT END. <br />TIMBER LAGGING SHALL BE INSTALLED AT SHORING WALLS. VOIDS BETWEEN LAGGING AND SOIL SHALL BE <br />UNDERGROUND UTILITIES LOCATION SERVICE (1-600-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. <br />BACKFILLED IMMEDIATELY AFTER LAGGING INSTALLATION. DRAINAGE BEHIND THE WALL MUST BE <br />CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK <br />AND SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES. <br />MAINTAINED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LIMIT THE AMOUNT OF EXPOSED SOIL WITHOUT <br />LAGGING TO AVOID LOSS OF SOIL. NO MORE THAN 4 FEET OF EXCAVATION SHALL BE EXPOSED BEFORE <br />INSTALLING LAGGING. PASSIVE EARTH <br />PRESSURE = 60 PCF <br />IF THE ACTUAL FIELD VERIFIED LOCATION OF UTILITIES COULD RESULT IN A CONFLICT WITH THE SHORING, THE EXCAVATIONS SHALL NOT REMAIN UNLAGGED OVERNIGHT. OVER 2 PILE D A <br />ENGINEER SHALL BE NOTIFIED IMMEDIATELY. INCLUDES A 1.5 <br />FACTOR OF SAFETY <br />PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT OVERHEAD OBSTRUCTIONS, INCLUDING ELECTRICAL <br />LINES, DO NOT INTERFERE WITH USE OF THE CONTRACTOR'S DRILLING EQUIPMENT. <br />COORDINATE AND ARRANGE FOR ALL UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED <br />OWNERS AND APPROPRIATE UTILITY COMPANIES. INTERRUPTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY <br />WITH THE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES AND WITH A MINIMUM 48 HOURS EARTH PRESSURE DIAGRAM <br />ADVANCE NOTICE. <br />SCALE: NTS <br />EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT <br />CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. <br />EROSION AND SEDIMENTATION CONTROL <br />ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE <br />PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. <br />THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF STREETS WILL <br />NOT BE ALLOWED WITHOUT PRIOR APPROVAL. <br />REFER TO CIVIL DRAWINGS FOR ADDITIONAL EROSION CONTROL INFORMATION. <br />TEMPORARY SHORING <br />CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN TEMPORARY SHORING AND <br />BRACING IN ADDITION TO SHORING SHOWN ON THESE PLANS AS NECESSARY TO PROTECT WORKERS, EXISTING <br />BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND <br />EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE <br />FOR REMOVAL OF ANY TEMPORARY SHORING AND BRACING, AS REQUIRED. <br />CZA TREATMENT <br />H PSF SEISMIC <br />URCHARGE <br />O <br />� <br />a <br />La <br />L <br />8- <br />U <br />LL <br />WLn <br />Z <br />LU <br />r1 <br />k <br />co <br />a- <br />00 <br />00 <br />W <br />Q <br />® <br />� <br />Q <br />DESIGN <br />DRAWN: <br />CHECK: <br />JOB NO <br />DATE: <br />Off <br />iCP <br />DMT <br />1 8232.1 0 <br />" <br />10 <br />0 <br />LLJ <br />Ae <br />SHEET: <br />