Laserfiche WebLink
8/17/2021 Page <br /> City of Everett <br /> 9:00:43AM <br /> INSPECTION ACTIVITY REPORT <br /> c <br /> Permit No. C1901-005 Site Address 3815 COLBYAVE <br /> Applied 1/9/2019 Applicant LAMPING LISA Lot <br /> Approved 2/5/2019 Owner LAMPING RODNEY D&LISA M Block <br /> Issued 2/15/2019 Contractor OWNER Tract <br /> Parent Permit No. Description REMODEL OF NON LIVING SPACE IN BASEMENT <br /> Notes THE BASEMENT WILL BE REMODELED TO ADD(1)BATHROOM,(2)BEDROOMS,AND <br /> LIVING ROOM AREA <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 8/26/2019 8/26/2019 PERMIT CRB APPROVAL SEE NOTES (8/26/2019 2:34 PM CRB) <br /> EXTENSION MAKING PROGRESS BUT NOT <br /> ENOUGH FOR INSPECTION YET <br /> 12/27/2019 12/27/2019 BLDG DWF NOT READY 12/26/2019 1:08 PM Lisa Lamping <br /> 08-FRAMING <br /> Contact Name:Lisa Lamping <br /> Site Address:3815 COLBY AVE <br /> Phone:4253394158 <br /> e-Mail:Lisa@atyourleisure.net <br /> (12/27/2019 7:52 AM DWF) <br /> Need Mechanical,Plumbing and Electrical <br /> RI before Framing Inspection. <br /> 2/14/2020 2/14/2020 PLUMB SDP CORRECTION eTRAKiT Inspection 2/13/2020 3:59 PM Lisa Lamping <br /> 02-GROUND Request <br /> Contact Name:Lisa Lamping <br /> Site Address:3815 COLBY AVE <br /> Phone:4253394158 <br /> e-Mail:lisa@atyourleisure.net <br /> (2/14/2020 2:50 PM SDP) <br /> 1)Repipe the washer waste piping as <br /> discussed. <br /> 2)Air admittance valves must be exposed <br /> to the atmosphere,install boxes or move out <br /> of the wall. <br /> 3)Remove the shower vent,not required. <br /> 2/21/2020 2/21/2020 PLUMB SDP APPROVAL eTRAKiT Inspection 2/20/2020 8:35 AM Lisa Lamping <br /> 02-GROUND Request I can be at the site in 10 min.after calling <br /> 425-339-4158 <br /> Contact Name:Lisa Lamping <br /> Site Address:3815 COLBY AVE <br /> Phone:4253394158 <br /> e-Mail:lisa@atyourleisure.net <br /> 2/21/2020 2/21/2020 MECH 04-ROUGH SDP APPROVAL <br /> IN <br /> 4/29/2020 4/29/2020 PLUMB SDP APPROVAL As noted (4/29/2020 12:09 PM SDP) <br /> 03-ROUGH IN Call for an inspection of the shower pan <br /> and shower valves when you are ready. <br /> Shower pan test:After the pan lining is <br /> installed,plug the drain piping and fill the <br /> shower pan with water up to the threshold, <br /> call for inspection with the water in the pan. <br /> This test is to insure that the lining of the <br /> shower does not leak.After inspection you <br /> may proceed with the tile. <br /> 6/9/2020 6/9/2020 PLUMB 05-OTHER SDP APPROVAL shower pan test 6/8/2020 3:08 PM Lisa Lamping <br /> Shower pan if filled with water <br /> Contact Name:Lisa Lamping <br /> Site Address:3815 COLBY AVE <br /> Phone:4253394158 <br /> e-Mail:lira@atyourleisure.net <br /> INSP12 CrIWSVST- S <br />