Laserfiche WebLink
INSPECTION REPORT <br />Date Permit:CFrr <br />Contractor:_��' <br />Owner: <br />Site Address: --4-S28 <br />F INSPECTION REQUESTED <br />ELECTRICAL BUILDI MECHANICAL PLUMBING <br />❑ Temp Service ❑ Groundwork/Slab ❑ Groundwork/Slab <br />❑ Groundwork ❑ Footing ❑ Rough In ❑ Rough In <br />❑Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ Framing ❑ Rooftop Units ❑ Water Service <br />❑Grounding ❑ Insulation ❑ Mechanical final ❑ Medical Gas <br />Ceiling Grid ❑ Drywall Nailing ❑ Plumbing Final <br />❑ Electrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Roof Nailing ❑ Rough In/Service Hot Water Tank <br />❑ Footing drains ❑ Ceiling Grid ❑ Refrigeration ❑ Rough in <br />❑ Roof drains Building Final ❑ Gas Pipe Final ❑ HWT Final <br />OTHER G'R CONSULTATION: <br />❑ APPROVAL ❑ PA L APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK F 'TC.O. ORRECTION REQUESTED El❑ OR ❑ VIOLATION <br />UN TO PERFORM INSPECTION: <br />jll�ALL (425) 257-8881 FOR REINSPECTION — 24 hour notice required <br />Maik Is <br />r + �s �j r. <br />IN ! .a f <br />Inspector: Date: <br />EIR (101 ATABAR, INC. <br />