My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3420 HAYES ST RECOR 2021-12-16
>
Address Records
>
HAYES ST
>
3420
>
RECOR
>
3420 HAYES ST RECOR 2021-12-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 1:04:22 PM
Creation date
12/16/2021 1:04:19 PM
Metadata
Fields
Template:
Address Document
Street Name
HAYES ST
Street Number
3420
Tenant Name
RECOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/21/2021 City of Everett Page 1 <br /> 10:50:03AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2105-111 Site Address 3420 HAYES ST <br /> Applied 5/18/2021 Applicant JIB TECH LLC Lot <br /> Approved 5/19/2021 Owner WOLFE PROPERTY HOLDINGS LLC Block <br /> Issued 5/21/2021 Contractor JIB TECH LLC Tract <br /> Parent Permit No. Description Install new 200amp 480v service <br /> Notes Install new 200amp 480v service <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 6/1/2021 6/1/2021 ELEC 09-FINAL TJJO CORRECTION eTRAKiT Inspection 5/31/2021 9:59 AM JIB TECH LLC <br /> Request <br /> Contact Name:JIB TECH LLC <br /> Site Address:3420 HAYES ST <br /> Phone:4254177392 <br /> e-Mail:Jbarlow.bg@gmail.com <br /> (6/1/2021 12:19 PM TJJO) <br /> -nec 110.24(a)Service equipment other <br /> than dwelling unit shall be legibly marked <br /> in the field with available fault current. <br /> -wac 110.022(3)For the purposes of legibly <br /> marking of disconnecting means as required <br /> in NEC 110.22,an identification plate is <br /> required <br /> -nec 250.52(5)ground rod furthest from <br /> meter has numerous cut marks and no taper, <br /> a full 8'rod is required <br /> -wac 250.64 protect grounding electrode <br /> conductor with one of the methods listed <br /> a-d <br /> -fuse rejection kit needs to be installed if <br /> aic calculation dictates <br /> 6/11/2021 6/11/2021 ELEC 09-FINAL TJJO APPRVD-PERN eTRAKiT Inspection 6/10/2021 10:39 PM JIB TECH LLC <br /> Request <br /> Contact Name:JIB TECH LLC <br /> Site Address:3420 HAYES ST <br /> Phone:4254177392 <br /> e-Mail:Jbarlow.bg@gmail.com <br /> (6/11/2021 1:50 PM TJJO) <br /> Corrections approved <br /> INSP12CRWsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.