Laserfiche WebLink
QUANTUM I CONSULTING, ENGINEERS <br />-K1111115IN2.1 <br />DATE: <br />9/6/2018 <br />TO: FROV I: <br />Matt Schreifels John Riley, P.E., S.E. <br />2812 Architecture <br />Olin fields. Aparients -- <br />Building N Roof 'trusses Retrofit <br />I met with Justin Church (General Contractor) at the Olin Fields Apartments Building Id site to <br />observe the fire damaged roof trusses retrofit repair and other completed structural repair work. <br />instead of installing new replacement trusses, Justin's crew was allowed to instead add 15/32" <br />thick plywood sheathing to one side of each of the fire -damaged trusses. The plywood sheathing <br />covered the entire height of the trusses for the full length and was attached with 1/4" diameter by . <br />1-1/2" long Simpson SDS screws spaced at 8" on center along the top and bottom chords and 12" <br />on center along all diagonal/intermediate members. All plywood panel edges either fell on truss <br />wood members or had 2x4 flat blocking added along unsupported panel edges between abutting <br />truss members. All of this work looked acceptable and in conformance with the repair intent. <br />At several locations the fire -damaged truss bottom chords were accidently cut out and replaced at <br />one end. This condition is acceptable as installed provided horizontal Simpson CS16 straps x 4' <br />long are added centered between the ends of the replacement bottom chord 2x4 members and the <br />abutting original truss bottom chords (where they were cut). All strap nail holes shall be filled <br />and the straps may be placed over the plywood sheathing. In addition, any damaged/removed <br />truss steel press plate connectors shall be replaced with Simpson tie plates that Justin purchased. <br />T P37 and TP45 tie plates shall be used to replace the original removed press plates with all nail <br />holes filled with 8d x 1-1/2" long nails. At one slightly fire damaged scissor truss adjacent to the <br />other repaired trusses, Justin was instructed to add plywood sheathing along one side as specified <br />above that extends from the perimeter bearing wall to the central ridge line (1/2 of the truss span). <br />For the shear walls, it is acceptable to use 7/1694 APA-rated OSB sheathing in lieu of the specified <br />15/32" sheathing, and it is acceptable to use .131" diameter x 3" long nails in lieu of the specified <br />.148" diameter x 3-1/4" long nails. <br />Thanks, <br />John Riley, S.E., P.E. <br />Principal <br />Quantum Consulting Engineers LLC <br />1511 Third Avenue, Suite 323 <br />Seattle, WA 98101 <br />T 206.957.3906 <br />F 206.957.3901 <br />www.quantumce.com <br />1511 THIRD AVENUE <br />SUITE 323 <br />SEATTLE, WA 98101 <br />TEL 206.957.3900 <br />FAX 206,957.3901 <br />Nw.quant"smce,com „ <br />f�` <br />