Laserfiche WebLink
INSPECTION REPORT <br /> j <br /> .4�� Date' �� Permit: ham/g` i—i t i <br /> ...,_ <br /> ', <br /> Contractor: <br /> 2� Owner: <br /> Site Address: 4:85 (9.3 0E 114' �J 1 ?- 103 <br /> TYPE OF INSPECTION RUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Groundin• ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> g Grid ❑Drywall Nailing ❑Plumbing Final <br /> 4fill Elec ' ❑Shear Nailing GAS PIPE <br /> r"•- ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE- 'IP <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: , <br /> EIR(10/06) DATABAR,INC. <br />