Laserfiche WebLink
• <br /> Next Years Labor Escalation' ' 3.00% 328 263 149 15 43 91 91 91 131 103 12 0 0 0 .+ _ <br /> u. <br /> n a '� 3�_ v E oa o`E ar E 3c_ 3 - c u� �_ c,sV 2 <br /> L c 2 E o `o i N 4'- `u' - - N —x ..1'0 n - aid °f Total <br /> TOTAL ESTIMATED COST AND FEE,$ °E �m B. -.c Q o_ ¢Ea, <w <v a'-^ v -�c <y q t =i<" G y <br /> tE gCEe zY uo .O1u cqa > e. g'`s <br /> o C 'o 1 G i o Rae e rc`y 21,1 ?`0 3 i1 i s j¢z` R w o"a u.iO E ,-.1.' d oo m 5 preadsheet Check <br /> 9 weeks 31 weeks 6 3 weeks 1 week 1 week �1 week �1 week m 2 weeks 3 weeks LL 12 weeks c 1 week 64 weeks 9 weeks 64 weeks <br /> 14,928 12,545 7,001 665 2,068 6,534 4,264 4,254 5,981 4,707 665 600 30,941 16,941 $ 110,094 9110,094 <br /> 'Next years labor escalation was calculated assuming MEM of the work would be completed next year. <br /> Enter data In yellow 8 green shaded' I 'cells only.Other formula cells are locked to prevent accidental changes.There is no password protection. <br /> I Overall Project Multiplier I 2.80 <br /> r" FeeiProtit as a i of DSC Only 000% <br /> Assumptions/Clarifications <br /> 1.This proposal assumes that City Staff will be in the lead role for this work,that ParameMx wall be worldng as-directed and Parametdx labor effort will be invoiced on an hourly basis. <br /> 2.Tasks and the associated levels of effort are estimates of the time that will be required based on our current knowledge of Cilys needs and schedule for the work and are subject to change if the <br /> needs/schedule become clearer or change from the assumed.In this case,Parametrx will notify the City and propose/negotiate amendments to this proposal. <br /> 3.Parametrix will not exceed the proposed fee amount without written approval of the City.Any fee/effort that is not required to be expended will not be billed and will remain with the City. <br /> 4.If additional tasks are required beyond those identified above,Parametdx will negotiate with the City for an additional services amendment. <br /> 5.With the exception of Design/Build Advisory Services,fees proposed are inclusive only of services required to assist the City in completing Design/Builder procurment.Design/Builder procurement is <br /> anticipated to be completed in mid-May of 2022.Additional fees to support the City during design and construction phases will be proposed/negotiated at a later date,as required. <br /> 6.At the direction of the City,no additional Design/Build Advisory Services have been proposed within this requrest.It is anticipated that the services that were put in place under the previous proposal will be <br /> adequate through December 31,2022.At that point in time,additional Design/Build Advisory Services will be proposed/negotiated,as required. <br /> 7.Costs proposed within this document are based on the Parametnx billing rates for 2021.Subsequent fee proposals and or amendments wall be calculated using Paremetrix billing rates for 2022,if proposed <br /> for work taking place after 12/31/21. <br /> B.Costs for Tasks 1(PRC Application/Approval and RFQ)8 Task 2(D/B Advisory)were added to this fee estimate at the request of Coy staff This work has already been authorized and Task I work has been <br /> completed. <br /> 9.For the purposes of calculating the hours per week,we have used the following seumptions for each of the tasks identified within our proposal: <br /> Task LOA Finish We ks <br /> PRC Application/Approval 5/31/2021 7/22/2021 <br /> Develop RFS Document 6/21/2021 6/2/2021 <br /> Develop RFP Document 10/4/21 12/6/21 <br /> Misc PM During Procurement Process 10/421 5/1322 1 <br /> Review Qualifications 8 Attend Scoring 11/121 11/19/21 <br /> Coordinate Release of RFP 12/321 <br /> Presubmission Meeting 1/1022 1/1122 <br /> One on One Meetings 1/1022 1/1122 <br /> Interviews 8 Scoring 2/3/22 2/4/22 <br /> Review Proposals and Attend Scoring 12122 2/422 <br /> Negotiate PreCon Fees 2/7/22 2/2522 <br /> Negotiate D/B Agreement 2/722 5/422 1 <br /> City Council Approve Selected D/B 5/1322 1 <br /> 0/13 Advisory Services 10/421 12/3122 64 <br /> \\puyapanaDl\PSO_Home\codydan\Everett Water Plant\PMX Fees\Everett Exhibit B-Parametrx Fee Estimate Rev 11-02-21.xisx V 2.0 11/20/2014 <br />