Laserfiche WebLink
• <br /> f. Could erosion occur as a result of clearing,construction,or use? If so, generally <br /> describe. <br /> Previous construction activities resulted in some on-site erosion along the slopes of <br /> the rerouted drainage ditches. Construction activities associated with restoration also <br /> have the potential to result in erosion. However,the proposed restoration actions are <br /> intended to stabilize the slopes along the drainage ditches and other localized areas <br /> as necessary to prevent further erosion. <br /> g. About what percent of the site will be covered with impervious surfaces after <br /> project construction(for example,asphalt or buildings)? <br /> No impervious surfaces are proposed as part of the Project. <br /> h. Proposed measures to reduce or control erosion,or other impacts to the earth, if <br /> any: <br /> Restoration actions are proposed to stabilize the slopes along the drainage ditches <br /> and other areas as necessary to prevent further erosion.The contractor will implement <br /> a Temporary Erosion and Sediment Control Plan during restoration activities to avoid <br /> or minimize potential erosion. <br /> 2. Air (help] <br /> a. What types of emissions to the air would result from the proposal during <br /> construction,operation,and maintenance when the project is completed?If any, <br /> generally describe and give approximate quantities if known. <br /> The Project previously had and will have short-term emissions from the heavy equipment used <br /> to complete the proposed Project activities. No long-term emissions will result from the <br /> completed Project. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? <br /> If so,generally describe. <br /> There are no off-site sources of emissions or odor that may affect the Project. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br /> The Project will adhere to applicable regulations for the reduction or control of emissions. <br /> Equipment will be inspected daily to ensure that uncontrolled emissions do not occur. <br /> 3. Water jheipl <br /> a. Surface Water:jheipl. <br /> 1) Is there any surface water body on or in the immediate vicinity of the site <br /> (including year-round and seasonal streams,saltwater, lakes,ponds, <br /> wetlands)? If yes,describe type and provide names.If appropriate,state what <br /> stream or river it flows into. <br /> There are multiple existing drainage ditches that border the property and flow east <br /> to the Marshland Canal. A drainage ditch referred to as the UNT is located at the <br /> southern boundary of the Project area, between the Golden Eagle Farms property <br /> and the Tonnes property.The Marshland Canal is an agricultural canal that <br /> connects to the Snohomish River to the north at the Marshland Flood Control <br /> District pump station.The pump station prevents any direct connection with the <br /> Snohomish River.The Snohomish River is located approximately 0.5 mile to the <br /> north and east of the Project area. <br /> 5 <br />