Laserfiche WebLink
GENERAL NOTES(APPLICABLE TO ALL SHEETS): EROSION CONTROL NOTES(APPLICABLE TO ALL SHEETS): PLANTING NOTES(APPLICABLE TO ALL SHEETS): ABBREVIATIONS <br /> 1. TOPOGRAPHIC SURVEY PROVIDED BY AS.P.I.LAND SURVEYING AND PLANNING AND SIGNED AND SEALED GENERAL PRACTICES: 1. CARE SHALL BE PROVIDED FOR AU.PLANTS DURING THE PLANT ESTABUSHMENT PERIOD AS MAY BE <br /> ON 01/17/2020. 1. AU MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHOULD BE INSPECTED AND NECESSARY TO KEEP PLANTS IN A LIVE,HEALTHY GROWING CONDITION.THESE DUTIES MAY INCLUDE: ABBRV ABBREVIATION <br /> 2. PROJECT TO BE CONSTRUCTED IN ONE PHASE. MAINTAINED REGULARLY TO PREVENT CONTAMINATION OF WATERS FROM FUELS,LUBRICANTS, A PRUNING,CULTIVATING,REMOVAL OF WEEDS FROM PLANTING BEDS AND MULCH AREAS. AQ ANCHOR QEA <br /> 3. WORK SHALL BE PERFORMED IN A MANNER THAT:A.)PREVENTS ANY DAMAGE TO PRIVATE PROPERTY AND HYDRAUUC FLUIDS AND OTHER TOXIC MATERIALS. B. WATER PLANT MATERIAL IN THE MORNING HOURS A MINIMUM OF THREE TIMES PER WEEK TO <br /> PROPERTY OWNER'S POLES,FENCES,SHRUBS,ETC.B.)PROTECTS ALL UNDERGROUND AND OVERHEAD 2. DISCHARGING HYDROSEED MIXTURES AND WASHING OUT HYDROSEEDERSAND OTHER EQUIPMENT IN ENHANCE EARLY ROOT GROWTH. CONT CONTINUED OR CONTINUOUS <br /> UTILITIES. OR ADJACENT TO SURFACE WATERS IS PROHIBITED. C. ADJUSTMENT OF STAKES AND TIES TO MAINTAIN PLANT IN UPRIGHT AND PLUMB CONDITION. CMP CORRUGATED METAL PIPE <br /> 4. ALL UTIUTY COMPANIES SHALL BE NOTIFIED AND UTILITIES SHALL BE FIELD VERIFIED FOR HORIZONTAL 3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND AFTER ANY RAINFALL D. RE-SET SETTLED PLANTS TO PROPER GRADES AND POSITION.RESTORE PLANTING SAUCER AND <br /> AND VERTICAL LOCATION PRIOR TO START OF CONSTRUCTION. DEFICIENCIES SHALL BE CORRECTED IMMEDIATELY.PROJECT SITE CONDITIONS MAY REQUIRE MULCH;ADDING PLANTING SOIL AND MULCH AS MAY BE REQUIRED. CP CONTROL POINT(SURVEYED) <br /> 5. DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.PONDING OF WATER IN INSTALLATION OF ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES. 2. ALL PLANTS SHALL BE NURSERY GROWN.THEY SHALL BE TYPICAL OF THEIR SPECIES,CULTIVAR OR CPE CORRUGATED POLYETHYLENE <br /> STREETS,DRIVES,ETC.WILL NOT BE ACCEPTABLE. SEEDING AND GROUND COVER: VARIETY.THEY SHALL BE SOUND,HEALTHY AND VIGOROUS AND SHALL BE FREE OF DISEASE AND ANY <br /> 6. WORK SHALL BE PERFORMED IN MANNER THAT COMPLIES WITH ALL APPUCABLE LOCAL STATE AND 1. STRAW MULCH AND TALL FESCUE SHOULD NOT BE USED IN RIPARIAN AREAS. EVIDENCE OF INSECTS.IF IN LEAF,THEY SHALL BE DENSELY FOUATED,WITHOUT LEAF SPOTS, CY CUBIC YARD <br /> FEDERAL STORM WATER POLLUTION PREVENTION LAWS AND ORDINANCES. 2. SEED SHALL BE PLACED ON DISTURBED SOIL AS SOON AS POSSIBLE OR WITHIN 14 DAYS AFTER THE DISCOLORATION,CURL WILTING,CHLOROSIS OR DAMAGE THEY SHALL HAVE HEALTHY, DIA DIAMETER <br /> 7. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGH THE COMPLETION OF THE PROJECT AND CONSTRUCTION ACTIVITY IS COMPLETE WITH THE GOAL OF PROVIDING A PERMANENT COVER OF NATIVE WELL-DEVELOPED ROOT SYSTEMS. <br /> THROUGH THE ESTABUSHMENT OF VEGETATION SUFFICIENT TO PROVIDE EROSION PROTECTION.SEE GRASSES AS QUICKLY AS POSSIBLE 3. SIZES SPECIFIED IN THE PLANT UST ARE THE MINIMUM SIZES TO WHICH THE PLANTS ARE TO BE JUDGED. DWG DRAWING <br /> ADDITIONAL NOTES THIS SHEET. 3. COVER ALL SEEDED AREAS WITH EROSION CONTROL FABRIC IMMEDIATELY UPON COMPLETION OF THE MEASUREMENTS ARE NOT TO INCLUDE ANY TERMINAL GROWTH. E EAST <br /> 8. ALL REQUIRED PERMITS AND APPROVALS SHALL BE OBTAINED PRIOR TO BEGINNING CONSTRUCTION. SEEDING APPLICATION. 4. PLANT HARDINESS:THE SUPPLIER OF ALL PLANTS SHOULD CERTIFY THAT THE ORIGIN OF THE PLANTS IS <br /> 4. WATERING:A CONTINUOUS,CLOSE STAND OF GRASS SHALL BE ESTABLISHED WITH NO GAPS OR BARE FROM HARDINESS ZONE 6 THROUGH 8 ONLY. EA EACH <br /> SPOTS EXCEEDING A HAND'S BREADTH.WHEN REQUIRED TO GERMINATE OR SUSTAIN THE GRASS UNTIL 5. MULCH,IF SPECIFIED,IS TO BE DOUBLE SHREDDED HARDWOOD BARK MULCH FOR TREES AND SHRUBS. EL,ELEV ELEVATION <br /> THE PROJECT IS COMPLETE WATER SHALL BE USED TO GENTLY WET THE SEEDED AREA IN THE MORNING 6. TOPSOIL SHALL BE FERTILE,WEED FREE,FRIABLE NATURAL LOAM,UNIFORM IN COMPOSITION,FREE OF <br /> GRADING NOTES(APPLICABLE TO ALL SHEETS): HOURS A MINIMUM OF THREE TIMES PER WEEK THROUGHOUT THE PROJECT DURATION. STONES,LIMBS,PLANTS AND THEIR ROOTS,DEBRIS AND OTHER EXTRANEOUS MATTER OVER 2-IN ESC EROSION AND SEDIMENT CONTROL <br /> 1. THE SURFACE OF AREAS TO BE GRADED SHALL BE PREPARED TO RECEIVE FILL BY REMOVING VEGETATION, 5. INSPECT PERMANENTLY SEEDED AREAS FOR FAILURE,MAKE NECESSARY REPAIRS AND RE-SEED OR DIAMETER.THE SOIL SHALL BE CAPABLE OF SUSTAINED PLANT GROWTH AND HAVE A 5%MINIMUM EX EXISTING <br /> TOPSOIL,AND OTHER UNSUITABLE MATERIALS,AND SCARIFYING THE GROUND TO PROVIDE A BOND WITH OVERSEED WITHIN THE SAME GROWING SEASON IF POSSIBLE.IF THE GRASS COVER IS SPARSE OR PATCHY, ORGANIC CONTENT. <br /> THE ALL MATERIAL ALL CUT AND FILL SLOPES PROPOSED BY THESE PLANS SHALL BE 3:1 RE-EVALUATE THE CHOICE OF GRASS AND QUANTITIES OF FERTILIZER APPUED. INSTALLATION: FT FOOT OR FEET <br /> (HORIZONTALVERTICAL)OR FLATTER UNLESS OTHERWISE SPECIFIED. 1. VERIFY GRADES ARE CONSTRUCTED AS INDICATED ON PLANS PRIOR TO PLANTING. FS FINISHED SURFACE <br /> _ 2. AT A MINIMUM,ALL FILL SLOPES SHALL BE PLACED IN 10-INCH MAXIMUM UFTS COMPACTED TO NOT LESS 2. STAKE PLANT LOCATIONS:PRIOR TO PLANTING,LAY OUT THE EXTENT OF THE PLANT BEDS AND THE <br /> THAN 95 PERCENT DENSITY(STANDARD PROCTOR). PROPOSED LOCATION. IE INVERT ELEVATION <br /> 3. FINE GRADING AND SEEDING SHALL OCCUR AT ALL AREAS DISTURBED BY THE WORK OF THE PROJECT. SEEDING NOTES(APPLICABLE TO ALL SHEETS): 3. FINELY ADJUST PLANT LOCATIONS IN THE FIELD AS NECESSARY TO BE CLEAR OF OBSTACLES.FINISHED IN INCH OR INCHES <br /> 4. FINE GRADING SHALL INCLUDE REMOVAL OF ALL DEBRIS(ROOTS,ROCKS,TRASH,AND OTHER FOREIGN 1. SEED SHALL BE PLACED ON DISTURBED SOIL AS SOON AS POSSIBLE OR WITHIN 14 DAYS AFTER THE PLANTING AREAS SHALL BE GRADED SO AS NOT TO IMPEDE DRAINAGE <br /> MATERIAL)LARGER THAN 2 INCHES IN ANY DIMENSION AND THE APPLICATION OF 2-3 INCHES OF CONSTRUCTION ACTIVITY IS COMPLETE WITH THE GOAL OF PROVIDING A PERMANENT COVER OF 4. BACKFILL THE PLANTING HOLES WITH IN-SITU SOIL REMOVED FOR PLANTING PIT.FOLLOWING BACKFILL, MAX MAXIMUM <br /> TOPSOIL FINE GRADING SHALL ACHIEVE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND IN GENERAL NATIVE GRASSES AS QUICKLY AS POSSIBLE. WATER TO THE POINT OF SATURATION AND TAMP TO COMPACT BACKFILL ADD EXISTING SOIL TO BRING MIN MINIMUM <br /> ACCORDANCE WTTH THE DRAINAGE PLANS.LANDSCAPE AREAS SHALL NOT BE SLOPED LESS THAN 2%. 2. FERTILIZING:PRIOR TO PLANTING,SOIL SHALL BE PREPARED WITH THE FOLLOWING: THE FINAL GRADE OF THE PLANTING HOLE TO THE SURROUNDING SOIL SURFACE RAKE THE UNUSED <br /> 5. GROUND COVER REQUIREMENTS AU.DISTURBED AREAS SHALL BE PLANTED WITH AN APPROVED GROUND GROUND UMESTONE 75 LB/1000 SF SOIL OUTSIDE OF THE PLANTING HOLE TO EVENLY DISTRIBUTE EXCESS THROUGHOUT THE BED,TAKING MISC MISCELLANEOUS <br /> COVER WITHIN 14 CALENDAR DAYS.ALL PERIMETER DIKES,SWALES,DITCHES,PERIMETER SLOPES,AND ALL N-P-K TURF-GRADE FERTILIZER APPLIED AT A RATE OF 1 LB NITROGEW1000 SF. CARE NOT TO CREATE A SOIL MOUND OR TO ALTER THE EXISTING GRADE N NORTH <br /> SLOPES STEEPER THAN 3:1 MUST BE STABILIZED IN 7 DAYS.SLOPES 50'OR GREATER IN LENGTH MUST BE THE FERTILZER SHALL HAVE A 3-1-2 OR 4-1-2 ANALYSIS.CONTRACTOR SHALL PROVIDE 5. SHRUBS,GROUNDCOVERS AND PERENNIALS PLANTED ON SLOPES GREATER THAN 3:1 SHALL HAVE A <br /> STABILIZED WITHIN 7 DAYS EXCEPT WHEN THE SLOPE IS FLATTER THAN 4:1.SLOPES LESS THAN 50'MUST BE LABELS FOR THE FERTILIZER TO THE ENGINEER FOR APPROVAL PRIOR TO APPUCATION. NATURAL FIBER GEOTEXTILE WOVEN MESH MATERIAL PINNED TO THE GROUND PER MANUFACTURER'S NAD NORTH AMERICAN DATUM <br /> STABIUZED IN 14 DAYS EXCEPT WHEN THE SLOPE IS STEEPER THAN 3:1,THEN THE 7 DAY REQUIREMENT 3. COVER ALL SEEDED AREAS WITH MULCH IMMEDIATELY UPON COMPLETION OF THE SEEDING SPECIFICATIONS.GROUNDCOVER BEDS SHALL HAVE 2"OF GROUND LEAF COMPOST SPREAD ONTO NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM <br /> APPLIES.INSTALL TEMPORARY SEEDING ON ALL AREAS THAT WILL BE LEFT IDLE FOR MORE THAN 14 DAYS. APPUCATION.SPECIFIED EROSION CONTROL FABRIC SHALL BE CONSIDERED MULCH.IN AREAS WHERE SLOPE PRIOR TO PLACING MESH.EXCAVATE PLANT PITS THROUGH MESH. <br /> NO EROSION CONTROL FABRIC IS SPECIFIED,MULCH SHALL CONSIST OF WEED FREE STRAW.STRAW OC ON CENTER <br /> SHALL BE APPLIED AT A RATE OF 90LBS/ACRE. OHW ORDINARY HIGH WATER <br /> 4. WATERING:CONTRACTOR IS RESPONSIBLE FOR ESTABUSHING A CONTINUOUS,CLOSE STAND OF GRASS PE PROFESSIONAL ENGINEER,POLYETHYLENE <br /> WITH NO GAPS OR BARE SPOTS EXCEEDING A HAND'S BREADTH.WHEN REQUIRED TO GERMINATE OR <br /> SUSTAIN THE GRASS UNTIL THE PROJECT IS COMPLETE,WATER SHALL BE USED TO GENTLY WET THE PROP PROPOSED <br /> SEEDED AREA IN THE MORNING HOURS A MINIMUM OF THREE TIMES PER WEEK THROUGHOUT THE <br /> PROJECT DURATION. PVC POLYVINYL CHLORIDE <br /> S. INSPECT PERMANENTLY SEEDED AREAS FOR FAILURE MAKE NECESSARY REPAIRS AND RE-SEED OR S SOUTH <br /> OVERSEED WITHIN THE SAME GROWING SEASON IF POSSIBLE.IF THE GRASS COVER IS SPARSE OR <br /> PATCHY,RE-EVALUATE THE CHOICE OF GRASS AND QUANTITIES OF UME AND FERTILIZER APPUED. SF SQUARE FOOT OR FEET <br /> FINAL STABILIZATION BY PERMANENT SEEDING OF THE SITE REQUIRES THAT IT BE COVERED BY A 70% SPEC SPECIFICATION <br /> COVERAGE RATE <br /> STA STATION <br /> STD STANDARD <br /> TESC TEMPORARY EROSION AND SEDIMENT CONTROL <br /> TYP TYPICAL <br /> UNT UNNAMED TRIBUTARY <br /> W WEST <br /> u <br /> i <br /> i <br /> z <br /> al <br /> S <br /> b <br /> V <br /> 5. <br /> DETAIL AND SECTION REFERENCING <br /> DETAIL REFERENCE NUMBER ca. <br /> S DRAWING ON WHICH DETAIL APPEARS 0ca v <br /> ="INDICATES TYPICAL OR ON SAME DRAWING 5 g <br /> w m <br /> . DETAIL REFERENCE NUMBER O DETAIL °Z <br /> SCALE:1"=10' 2<' <br /> za <br /> INDICATES DIRECTION z o <br /> OF CUTTING PLAN <br /> 8 <br /> ozm <br /> i 0 <br /> a SECTION"A"IS SHOWN ON DRAWING"C-2" - <br /> V J <br /> -1-.6 <br /> 2 Oz <br /> • <br /> SECTION REFERENCE LETTER AO SECTION _ 0 <br /> O, PLAN NUMBER WHICH SECTION WAS TAKEN SCALE 1 =10 - <br /> LLx <br /> 2 az <br /> g 100%DESIGN-PERMIT SET <br /> REVISIONS <br /> 2. - REV DATE BY APP'D DESCRIPTION DESIGNED BY:J.SEXTON GOLDEN EAGLE FARMS G_2 <br /> f.t; \Z ANCHORILII <br /> DRAWN B"' ON, P�"'E RESTORATION PLAN <br /> CHECKED BY:D.CISAKOWSKI <br /> clEA EVERETT APPROESMMEDERS <br /> WASHINGTOn NOTES,ABBREVIATIONS,&LEGEND SHEET# 2 OF 11 <br /> c DATE JUNE 2019 <br /> Oo <br />