My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7401 LARIMER RD 2021-12-21
>
Address Records
>
LARIMER RD
>
7401
>
7401 LARIMER RD 2021-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 11:53:15 AM
Creation date
12/17/2021 11:51:12 AM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
7401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD TESC NOTES: CONSTRUCTION SEQUENCING NOTES: <br /> THE CONTRACTOR SHALL PROVIDE INSPECTION AND REPORTING BY A CERTIFIED EROSION 1. INSTALL CONSTRUCTION SILT FENCING AND CONSTRUCTION ENTRANCE. <br /> AND SEDIMENTATION CONTROL LEAD(CESCL)AS REQUIRED BY THE WASHINGTON STATE <br /> DEPARTMENT OF ECOLOGY(WSDOE). 2. EXCAVATE THE PROPOSED UNT CHANNEL INSTALL THE PROPOSED CULVERT,AND <br /> REALIGN THE NORTH ACCESS ROAD WHILE LEAVING SOIL PLUGS IN PLACE BETWEEN <br /> THE FOLLOWING EROSION AND SEDIMENTATION CONTROL NOTES APPLY TO ALL THE PROPOSED UNT CHANNEL AND EXISTING UNT CHANNEL AND NORTH DITCH. <br /> CONSTRUCTION SITE ACTIVITIES AT ALL TIMES,INCLUDING SITE STOCKPILES,UNLESS <br /> OTHERWISE SPECIFIED ON THESE PLANS. 3. INSTALL BLOCK NETS ON THE NORTH OUTLET OF THE PROPOSED CULVERT. <br /> 1. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, 4. REMOVE SOIL PLUG AT THE NORTH DITCH TO ALLOW PROPOSED UNT CHANNEL TO <br /> MAINTENANCE,REPLACEMENT,AND UPGRADING OF THESE TESC FACILITIES IS THE BACKWATER. <br /> RESPONSIBILITY OF THE CONTRACTOR(OR OWNER IF WORK IS SELF-PERFORMED) <br /> UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND 5. INSTALL BLOCK NET IN EXISTING UNT CHANNEL UPSTREAM OF THE PROPOSED UNT <br /> VEGETATION/LANDSCAPING IS ESTABLISHED. CHANNEL AND DOWNSTREAM OF THE EXISTING UNT CHANNEL <br /> 2. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY 6. REMOVE SOIL PLUG SEPARATING THE EXISTING UNT AND PROPOSED UNT BY MOVING <br /> FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.DURING THE CONSTRUCTION THE MATERIAL INTO THE EXISTING UNT CHANNEL ALLOWING THE PROPOSED UNT TO <br /> PERIOD,NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE FLOW. <br /> PERMITTED.THE FLAGGING SHALL BE MAINTAINED FOR THE DURATION OF <br /> CONSTRUCTION. 7. RESCUE AND RELOCATE ANY FISH FOUND ALONG EXISTING UNT. <br /> 3. THE TESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO ALL 8. PLACE AND COMPACT FILL MATERIAL ALONG EXISTING UNT AND TONNES PROPERTY. <br /> DEMOLITION ACTIVITIES,AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT <br /> AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM OR 9. PLACE AND COMPACT FILL MATERIAL IN SOUTHERN PORTION OF DITCH 3. <br /> ROADWAYS,OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br /> 10. REMOVE REMAINING BLOCK NETS. <br /> 4. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br /> ANTICIPATED SITE CONDITIONS.DURING THE CONSTRUCTION PERIOD,THESE TESC 11. PLACE AND LEVEL TOPSOIL MATERIAL <br /> FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND <br /> TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. 12. INSTALL PLANTINGS AND SEED DISTURBED AREAS. <br /> 5. THE TESC FACILITIES SHALL BE INSPECTED DAILY AND MAINTAINED AS NECESSARY TO 13. DURING CONSTRUCTION,MAINTAIN AND UPGRADE TESC BMPS AS NEEDED TO <br /> ENSURE THEIR CONTINUED FUNCTIONING. PREVENT SEDIMENT FROM LEAVING THE SITE. <br /> 6. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A 14. INSTALL POST-CONSTRUCTION SILT FENCING TO REMAIN IN PLACE UNTIL THE <br /> MINIMUM OF ONCE PER MONTH OR WITHIN 48 HOURS FOLLOWING A STORM EVENT. VEGETATION IS ESTABLISHED. <br /> 7. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF 15. REMOVE CONSTRUCTION BMPS. <br /> CONSTRUCTION AND SHALL BE MAINTAINED FOR THE DURATION OF THE PROJECT. <br /> ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL ROADWAY AREAS <br /> ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br /> NOTES NOTES <br /> 1. STABILIZED CONSTRUCTION ENTRANCE SHALL ATTACH IN A MANNER THAT POST SEE WSDOT STANDARD 1, INSTALL THE ENDS OF THE SILT FENCE TO POINT <br /> MEET THE REQUIREMENTS OF WSDOT STANDARD ASSURES FABRIC IS FIRMLY SPECIFICATIONS B-01.3191A SLIGHTLY UPSIOPE TO PREVENT SEDIMENT FROM <br /> SPECIFICATION SECTION B-01.3(7(. HELD SBY UPPORT IN <br /> FLOWING AROUND THE ENDS OF THE FENCE. <br /> REDUCES THE WAY THAT i REDUCES THE POTENTIAL <br /> b FOR FABRIC TEARING 2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br /> ,�'T� FASTEN 5'IN D.C.TO WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br /> \ +Y:I POST EVERY 6"IN O. AND 8.01.3(15). <br /> BACKUP SUPPORT <br /> 3. SPLICES SHALL LOCATIONS. <br /> TI NEVER IF PLACED IN LORE W <br /> A SPOTS <br /> \ ORS OR UMP AAS,F SPLICESEN MAY NEED TO <br /> {{ LOW OR SUMP AREAS,THE FENCE MAY NEED TO <br /> 0 <br /> INSTALL DRIVEWAY CULVERT B,KCKFILLED& III "f -SELF-LOCKING TIE-NVLONE BE REINSTALLED UNLESS OTHERWISE APPROVED. <br /> IF THERE IS A ROADSIDE DITCH COMPACTED _ <br /> ,� PRESENT NATIVE SOIL ,GEOTEXTILE t '. 1 6/61M INTENSIL S. INSTALL SILT FENCING PARALLEL TO MAPPED <br /> d .25'--...-- , 'I 120X MIN TENSILE STRENGTH, <br /> \ W STABILIZED <br /> CONTOUR LINES, <br /> F1p V <br /> ,\ „-/ 5. DURING EXCAVATION,MINIMIZE DISTURBING <br /> =5f FIT THE GROUND AROUND TRENCH AS MUCH AS IS <br /> _l-- FEASIBLE,AND SMOOTH SURFACE FOLLOWING <br /> ki. EXCAVATION TO AVOID CONCENTRATING FLOWS. <br /> \� • 30'MIN TYPICAL _('\ COMPACTION MUST BE ADEQUATE TO PREVENT <br /> N <br /> :74-1111:C347-4:44 <br /> BURY GEOTEXTIII } UNDERCUTTING FLOWS. <br /> o t I IN TRENCH <br /> BACKUP SUPPORT <br /> P A \ Ii SEOSTANLE FOR SEE STANDARD SPECIFICATION <br /> \ `'y �,. (TYPICAL) <br /> �;$,�).�� 'a f�� ' �- \ iiii <br /> : �� SECTIONS33.2ID),TIABLEU L' O STEEL�1 (TYPIUL)ST <br /> �� - -- PERMEABLE BALLAST TYPICAL SEE I i '' � [] <br /> ` / STANDARD SPECIFICATION 3,,, w SK <br /> SECTION 9-03.9121 PSF/ v0 <br /> 1'MIN 'S"H. l e/ TYPICAL INSTALLATION DETAIL \v \0- FABRIC w m <br /> A LENGTH AS REQUIRED 300 MIN,EXCEPT DEPTH rc�� /� ` \ ,, 'QpA (GEOTE%)1LE) O AA.,.- <br /> MAY BE REDUCED TO SO'MIN FOR TYPICAL 1- N (TYPICAL) <br /> - SITES WITH LESS THAN ONE ACRE TK' ` pQ <br /> OF EXPOSED SOIL OR APPROVED BY INSPECTOR -_ -\tr4p -' INSTALL BACKUP SUPPORT FOR <br /> LX THE GEOTEXTILE SEE STANDARD / i Z Q' <br /> a i PLACE CONSTRUCTION GEOTEXTILE FOR SOIL - SPECIFICATIONSECTION 8.013191A I : POD ,I} Z Od_ <br /> yg STABILIZATION FROM THE EDGE OF THE EXISTING ` -- PROVIDE FULL WIDTH OF '-` o m <br /> ROADWAY TO THE CONSTRUCTION ENTRANCE, INGRESS/EGRESS AREA q 112 'y9• SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br /> o I OR AS DIRECTED BY THE ENGINEER 15 MIN i �/' I pO'g O TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE - <br /> I <br /> 3 P ti QPp\`° FENCE AT THE OVERLAP. - <br /> > SPLICE DETAIL <br /> e <br /> g ISOMETRIC VIEW IJI TYPICALSIIT FENCE WSDOT STD PGN130.30-02 ACCEPTABLE SUBSTITUTE _ <br /> _ 71EXCEPT STEEL POST REQUIRED OZ <br /> WSDOT STD PLAN-80.10-02 ACCEPTABLE SUBSTITUTE WITH BACKUP SUPPORT <br /> CONSTRUCTION ENTRANCE ; P. a To <br /> i CITY OF EVERETT Ica"" ISOMETRIC ,CITY OF EVERETT z o <br /> so PUBLIC WORKS DEPARTMENT i s ,- I IR'd' PUBLIC WORKS DEPARTMENT •Q <br /> r I9 Q <br /> 9 5x ':'..n,.,, laZa ip+�' ..'T a-rem 04/03%2017 20�`,� i' iHenx, ,.� "�iw w F.. O�i ITj °T �N <br /> 4 Y <br /> ga <br /> 1@ CONSTRUCTION ACCESS 201 5( TEMPORARY SILT FENCE 214 LL x <br /> 7:,-. <br /> REVISIONS <br /> _ REV DATE BY APP'D DESCRIPTION DESIGNED BY.1.SEXTON GOLDEN EAGLE FARMS <br /> \Z ANCHOR in , DRAWN BY:J.SEXTON RESTORATION PLAN T-2 <br /> E CHECKED BY-T.DRURY <br /> `'`'`� EVERETT APPROVED BY:G.SUMMERS <br /> rl QEA crc-.ci SCALE:AS NOTED <br /> WASHINGTON TESC NOTES AND DETAILS SHEET 4 of 11 <br /> DATE:OCTOBER 2020 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.