My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/9/2021
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 12/9/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 3:31:06 PM
Creation date
12/17/2021 3:30:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/9/2021
Council Approval Date
12/1/2021
Department
Public Works
Department Project Manager
Heather Griffin/Keith Alewine/Tom Hood
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$15,015,255.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: November 4, 2021 ADDRESS: 609 North Hill Blvd. <br /> CONTRACTOR: Interwest Construction Inc. CITY/STATE: Burlington,WA 98233 <br /> PROJECT TITLE: Grand Avenue Park Bridge WORK ORDER NO. PW-3588 <br /> DATE WORK COMPLETE: March 15, 2021 FINAL AMOUNT: $15,015,255.20 <br /> Excluding Washington State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I,the undersigned,certify and declare, under penalty of perjury under the laws of the State of Washington, <br /> that the foregoing is true and correct: I am authorized to sign for the claimant; that in connection with the <br /> work performed and,to the best of my knowledge,no loan,gratuity or gift in any form whatsoever has been <br /> extended to any employee of the City Everett, nor have I rented or purchased any equipment or materials <br /> from any employee of the City of Everett; that the attached final estimate is a true and correct statement <br /> showing all the monies due the claimant from the City of Everett for work performed and material <br /> furnished under this Contract; that I have carefully examined said final estimate and understand the same <br /> and; that I,on behalf of the claimant, hereby release and forever discharge the City of Everett from any and <br /> all claims of whatsoever nature which I or the claimant may have, arising out of the performance of said <br /> Contract,which are not set forth in the attached Contractor Claim Reservation. <br /> DATED at Burlington,WA this 4th day of November , 20 21 . <br /> (City, State)X �" "� 0Y�2�'�/J� <br /> X President <br /> CONTRACTOR TITLE <br /> Interwest Construction Inc. <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final estimate to be <br /> based upon actual measurements and to � �� <br /> be true and rrect. APPROVED Date: 1 1 & �'- <br /> -/L <br /> X X_ <br /> ity Engineer Pu c Works Director <br /> Tom Hood, P.E. Ryan Sass, P.E. <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all <br /> subcontractor's agents and forwarded with the Final Contract Voucher Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.