My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 RUCKER AVE FAST SIGNS 2021-12-17
>
Address Records
>
RUCKER AVE
>
2902
>
FAST SIGNS
>
2902 RUCKER AVE FAST SIGNS 2021-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 3:40:37 PM
Creation date
12/17/2021 3:40:09 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2902
Tenant Name
FAST SIGNS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 1:111 I. , <br /> EVERETT December 10, 2020 <br /> WASHINGTON Tim Irvine <br /> ocg.11c@yahoo.com <br /> 508 S Second St,STE 100 <br /> Mount Vernon,Washington 98273 <br /> Owner: DMT Rucker LLC <br /> Job Address: 2902 Rucker Ave <br /> Plan Check No: M2011-084 <br /> RE: Building Permit Review Letter <br /> Dear Mr. Irvine, <br /> In response to the application for a building permit,the plans have been <br /> examined and you are advised that revisions may be necessary before a permit <br /> can be issued. Please review and respond to the comments below. <br /> 1. The proposed locations of the new rooftop mechanical units do not appear <br /> to have anchorage details provided. It also unclear given the new locations of <br /> the units that the weight and their associated lateral loads can be supported by <br /> the existing roof framing without strengthening or other such reinforcement <br /> provided. Please clarify, revise drawings,and provide design calculations as <br /> required. IEBC 106.2.1,707.2. <br /> l <br /> RESUBMITTAL REQUIREMENTS <br /> In order for the processing of your application to continue,it will be necessary <br /> to provide the Building Division with two new sets of revised construction <br /> documents reflecting the corrections requested. Please include a response <br /> letter indicating how the corrections were resolved. <br /> All codes cited refer to the 2015 International Building Code (IBC), 2015 <br /> International Existing Building Code (IEBC),the 2015 International Fire Code <br /> (IFC),the 2015 International Mechanical Code(IMC),and/or the 2015 <br /> Washington State Energy Code (WSEC),as amended by the State of Washington <br /> and adopted by the City of Everett. The current IBC referenced standard for <br /> accessible design is the 2009"Accessible and Usable Buildings and Facilities" <br /> PERMIT SERVICES (ICC/ANSI A117.1). Federal ADA regulations and standards may be more <br /> restrictive. <br /> 9. 3200 Cedar Street <br /> Everett,WA 98201 <br /> © 425.257.8810 <br /> 425.257.8857 fax <br /> Oeveretteps@everettwa.gov <br /> everettwa.gov/permits <br /> Page 1 of 2 C <br />
The URL can be used to link to this page
Your browser does not support the video tag.