My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2925 RUCKER AVE 2021-12-17
>
Address Records
>
RUCKER AVE
>
2925
>
2925 RUCKER AVE 2021-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 3:53:21 PM
Creation date
12/17/2021 3:51:45 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2925
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/12/2021 City of Everett Page i <br /> 8:23:59AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M2012-080 Site Address 2925 RUCKER AVE <br /> Applied 12/22/2020 Applicant Norman Griffith Lot <br /> Approved 12/22/2020 Owner 1111 HEWITT LLC Block <br /> Issued 12/23/2020 Contractor NORMAL MECHANICAL LLC Tract <br /> Parent Permit No. B2009-037 Description Replace 4 Reznor Unit Heater,Natural Gas Furnace&Gas Piping <br /> Notes Replacement is like for like due to fire damage to building <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 1/12/2021 1/12/2021 GAS 01-ROUGH IN SDP APPROVAL eTRAKiT Inspection 1/11/2021 2:41 PM Norman Griffith <br /> Request <br /> Contact Name:Norman Griffith <br /> Site Address:2925 RUCKER AVE <br /> Phone:2062959118 <br /> e-Mail:normanhgriffith@gmail.com <br /> (1/12/2021 2:13 PM SDP) <br /> The four tenant spaces have separate gas <br /> lines and gas meters located in the alley <br /> instead of inside 2927 Rucker.All tested at <br /> 15#.Ok for service. <br /> 2/23/2021 2/23/2021 MECH 06-FINAL SDP NO ACCESS eTRAKiT Inspection 2/22/2021 8:02 AM Norman Griffith <br /> Request <br /> Contact Name:Norman Griffith <br /> Site Address:2925 RUCKER AVE <br /> Phone:2062959118 <br /> e-Mail:normanhgriffith@gmail.com <br /> (2/23/2021 3:15 PM SDP) <br /> No access at 1:48 pm <br /> 3/3/2021 3/3/2021 MECH 06-FINAL TAHU APPRVD-PERN <br /> 3/3/2021 3/3/2021 GAS 03-FINAL TAHU APPRVD-PERIv <br /> 3/11/2021 3/11/2021 GAS 03-FINAL TAHU APPROVAL <br /> INSP12 <br /> S MUMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.