Laserfiche WebLink
• <br /> are <br /> v �rY WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> * If item (a)-(ii,iii,or v)is selected,the work must also comply with section (a)-(vil).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> r/ (a) Electrical plan review is not required for: <br /> ❑ (i) Low voltage systems; <br /> a--❑ (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> �❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder, <br /> Li does <br /> Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the projects distribution system <br /> does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2; or <br /> (C)A required fire pump system. <br /> ■ (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> ❑ (vi) Electric power production source(s) such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. <br /> (vii)For installations in(a)(ii),(iii), and(v)of this subsection to be considered,the following must be available <br /> ❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the projects scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental,and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> n (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> l l occupancies defined in this chapter. <br /> I I (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-1 Table 900-2 <br /> Health or Personal care Facilities Educational and Institutional Facilities,Places of Assembly,or Other Facilities <br /> Health or Personal Care Facility Plan Review <br /> Type Required Educational,institutional,or Plan Review <br /> rUspitai 4es Other Facility Types Required <br /> N.t, n5 ..'tt ur lang;ern-i 'tea Wcatona _ Y <br /> carsua.it Vr.aitutic'ai '%ea <br /> 3roarding ho:Te r_. _ <br /> 4sti,tec5 I,:riE faci+ry ;es <br /> Prr,fate escchos an)nespite3 vet- •Notes to Tables 900-1 and900-2. <br /> ;P r,ate ycr atr c hoose:tai es --._.- 1.A,city atltharizrg tc tic electrical'insp€rt orns <br /> ',later-my c,c;- tr> May reclu re,purl r ie,a ors fatuity ty ces no: <br /> r tcry sxgery°ac'sc= vas rr ?e=,^,=eo by the d a;pertrrenr. <br /> Renal lentceiaVala c;g1,c `refa '.. <br /> Resicint,ai treatment faculty fie_ <br /> linhancecl ser,pie facility Yea <br /> ,-.ct.t'-essoentlal-enabiiltatio, PERMIT# <br /> Page 2-Plan Review <br /> ce„_ef <br />