CERTIFICATE OF COMPLETION <br /> Project: Maple Heights Bridge Seismic Retrofit <br /> Contractor: Combined Construction, Inc. <br /> Work Order No. PW3693 <br /> The above-mentioned project was constructed per the plans and specifications and <br /> to the satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> Pub is Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> -2/9/Z-1 <br /> r, City of Everett Date <br /> Cassie Fra n <br /> Atte t: kliA/01)1 C,26C-2 <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> David C. Hall, City Attorney <br /> Date <br />