My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3931 FRIDAY AVE 2021-12-21
>
Address Records
>
FRIDAY AVE
>
3931
>
3931 FRIDAY AVE 2021-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 10:26:58 AM
Creation date
12/21/2021 10:26:49 AM
Metadata
Fields
Template:
Address Document
Street Name
FRIDAY AVE
Street Number
3931
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> 12/13/2021 12:52 <br /> Issued By SCM1 SUNDBERG,CURT M. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 9/3/2020 <br /> Fund 401 Account 5 Program 710 Function 1o9 Activity 675 <br /> Program <br /> Title REPLACE 3931 FRIDAY AVE 710109675 <br /> Work Order No 20201674 Project Activity Type SERVICE REQUEST Status CL <br /> Status 9/3/2020 Time 13:46 Original WO Billing <br /> Customer Information <br /> Customer Name DOPPS,MARIA Customer Id <br /> Address 3931 Street FRIDAY AVE <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( 425 ) 346-6051 Ext <br /> Second Phone ( ) - Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 3931 Street FRIDAY AVE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem SEWER SEWER <br /> Sub Problem SS SIDE SEWER <br /> Requested By BML BAUER,MACKENSY L. Date Requested 3/20/2020 <br /> Agency Related Request 00194473 <br /> Initiated From PUBLIC PUBLIC <br /> Utility Locate(USA) No 20327999 Called Date Expiration Date 9/25/2020 <br /> Assignment Information <br /> Dept PW PUBLIC WORKS Priority Estimated Hours <br /> Crew SCONST SEWER CONSTRUCTION(OLHAVA) <br /> Contractor <br /> Assigned To LBM LESTER,BRIAN M. <br /> Assigned By SCM1 SUNDBERG,CURT M. <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments INVENTORY MATERIAL IN THE AMOUNT OF$196.08 JOURNALIZED IN <br /> 2021. <br /> Action Taken REPLACED SIDE SEWER FROM MAIN TO PROP LINE. TIED INTO EXISTING 6"PVC CLEANOUT <br /> AT PROP LINE. CLEANOUT WAS AT GRADE AT TIME OF REPAIR. SS IS 8.5 FEET DEEP AT <br /> CLEANOUT. MAIN IS 10 FEET DEEP. CONNECTION IS A WYE ON SIDE OF MAIN. <br /> Recommended Action <br />
The URL can be used to link to this page
Your browser does not support the video tag.