Laserfiche WebLink
• • <br /> same material located in different areas, may, or may not, require additional samples, depending on <br /> the usage of each area. Sprayed and troweled on materials require at least three tests to confirm they <br /> are .no. ACBM. Differing quantities of suspect homogeneous materials also affect the number of <br /> samples needed. <br /> Analysis of samples must be done by an accredited laboratory. <br /> Assessing friability is done per the EPA definition that the material can be crumbled to a powder <br /> using hand pressure. The forces expected to act on any material cannot be anticipated by this <br /> inspector. <br /> An accredited Asbestos Management Planner should be consulted for assessments of condition or <br /> potential for disturbance. These assessments are usually only required for inspections of schools. <br /> Estimated quantities are given as a courtesy and should not be relied on for bidding purposes. An <br /> accredited Asbestos Project Designer is reauired for quantifying.ACBM's. <br /> The inspector who prepared this report hereby certifies by signature below, that : <br /> • has received training pursuant to 40 CFR Part 763, Sub-part E,Appendix C <br /> • has had at least fifteen (15) years professional experience in the asbestos abatement industry <br /> 1085 07/10/19 <br /> Robert C. Scherf Certification # Expiration Date <br /> Limitations <br /> This inspection was prepared in a manner intended to comply with current statutes governing the <br /> specific purpose stated herein for the locality in which it was performed. This report can be expected to <br /> become outdated as regulations, site conditions or usage of this information change over time. <br /> Reasonable diligence was excercised to discover ACBM's during the inspection. Standard industry <br /> practices recognize that every square inch of a building cannot reasonably be exposed or sampled <br /> during the survey process, especially in occupied structures. Wall or chimney interiors, underground <br /> pipes, liners of septic tanks, woodstove flues or water heaters, `Bakelite' toilet bowls and junction <br /> boxes, every area under carpets or burn debri, are all examples of this. Items not attached to <br /> structures are not normally addressed by this type of report. Consequently, some materials may <br /> remain concealed, or untested, which are not identified in this report. Materials not addressed in <br /> this report should be assumed to contain asbestos until determined otherwise by an accredited <br /> professional. The results of such analysis must be incorporated by addenda into this report prior to <br /> disturbance of these materials.A copy of this report must remain onsite during such activities. <br /> Samples are believed to be representative of similar materials found throughout the areas inspected, <br /> however, the required random sampling protocol could miss some ACBM's. <br /> Inspector is not responsible for conclusions based upon third party laboratory inaccuracies. <br /> Full depth sampling is required when roofing will be disturbed. Attempts by inspector to fill holes after <br /> such sampling by use of tar, caulking, etc. are beyond the scope of this report and if performed should <br /> be considered temporary leak prevention, not warranted to be a professional roofing repair. <br /> Drawings are not to scale. Site maps are included on multi-structure projects only. <br /> Advice for the handling of asbestos is beyond the scope of this report and nothing herein should be <br /> construed as such. Multiple agencies regulations may differ in these regards. <br /> This inspection was performed for compensation, and as such it is not warranted complete and it <br /> cannot be used for any purpose if the preparer voids it's use due to lack of payment for this service. <br /> This document is protected under USC 17 (aka Copyright Act of 1979). <br /> This inspection is also limited by site conditions and those specified by the client. This site was : <br /> Occupied Yes / No <br /> Unlimited access Yes/ No <br /> Limited scope Yes/ No <br /> Destructive sampling X Yes/ No ...- <br />