My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1325 SE EVERETT MALL WAY FLYING SQUIRREL 2021-12-22
>
Address Records
>
SE EVERETT MALL WAY
>
1325
>
FLYING SQUIRREL
>
1325 SE EVERETT MALL WAY FLYING SQUIRREL 2021-12-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 9:00:45 AM
Creation date
12/22/2021 8:59:52 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1325
Tenant Name
FLYING SQUIRREL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/8/2021 City of Everett Page <br /> 2:19:52PM <br /> INSPECTION ACTIVITY REPORT <br /> 10/21/2021 10/22/2021 BLDG 13-CEILING KMK NOT READY Complete 10/20/2021 10:04 AM GAFFNEY <br /> GRID mechanical CONSTRUCTION <br /> inspection PM inspection,electrical and HVAC called <br /> in for AM. <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address: 1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> Tory@GAFFNEYCONSTRUCTION.COM <br /> (10/22/2021 7:41 AM KMK) <br /> Complete mechanical inspection above <br /> grid.Leave this area open for mechanical <br /> inspection <br /> 10/27/2021 10/27/2021 FIRE 02-BLDG SAG CORRECTION need knox caps for <br /> PRE-FINAL FOR FDC <br /> 10/27/2021 10/27/2021 BLDG 13-CEILING KMK APPROVAL as noted 10/26/2021 9:30 AM GAFFNEY <br /> GRID CONSTRUCTION <br /> HVAC inspection re-inspection is scheduled <br /> for 10/26,only thing failed before was a 10' <br /> section of insulation,everything else was <br /> good. AM inspection please <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address: 1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> tory@GAFFNEYCONSTRUCTION.COM <br /> (10/27/2021 3:11 PM KMK) <br /> Be sure mechanical low voltage permit is <br /> scheduled and approved before cover.At <br /> this time there is not activity on it. <br /> 11/4/2021 11/4/2021 BLDG 16-FINAL KMK NOT READY see notes 11/2/2021 1:58 PM GAFFNEY <br /> CONSTRUCTION <br /> If plumbing doesn't get signed off can we <br /> please still do a site walk to see any <br /> potential issues we can resolve ASAP. <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address:1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> Tory@GAFFNEYCONSTRUCTION.COM <br /> (11/4/2021 9:43 AM KMK) <br /> Obtain finals on all sub permits to include: <br /> 1.Fire(on Building permit) <br /> 2.Electrical <br /> 3.Utilities <br /> Recall for a building final when the above <br /> is completed <br /> 11/5/2021 Any 11/5/2021 11:1: FIRE 03-BLDG RJJ APPROVAL confirmed Knox 11/4/2021 2:39 PM GAFFNEY <br /> FINAL FOR FIRE caps installed CONSTRUCTION <br /> FDC Knox Caps were installed on 11/3/21. <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address: 1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> tory@GAFFNEYCONSTRUCTION.COM <br /> 11/8/2021 11/8/2021 CERTIFICATE OF KLC APPROVAL Attached <br /> OCCUPANCY <br /> INSP12 <br /> CRWsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.