Laserfiche WebLink
11/8/2021 City of Everett Page <br /> 2:19:52PM <br /> INSPECTION ACTIVITY REPORT <br /> 10/21/2021 10/22/2021 BLDG 13-CEILING KMK NOT READY Complete 10/20/2021 10:04 AM GAFFNEY <br /> GRID mechanical CONSTRUCTION <br /> inspection PM inspection,electrical and HVAC called <br /> in for AM. <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address: 1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> Tory@GAFFNEYCONSTRUCTION.COM <br /> (10/22/2021 7:41 AM KMK) <br /> Complete mechanical inspection above <br /> grid.Leave this area open for mechanical <br /> inspection <br /> 10/27/2021 10/27/2021 FIRE 02-BLDG SAG CORRECTION need knox caps for <br /> PRE-FINAL FOR FDC <br /> 10/27/2021 10/27/2021 BLDG 13-CEILING KMK APPROVAL as noted 10/26/2021 9:30 AM GAFFNEY <br /> GRID CONSTRUCTION <br /> HVAC inspection re-inspection is scheduled <br /> for 10/26,only thing failed before was a 10' <br /> section of insulation,everything else was <br /> good. AM inspection please <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address: 1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> tory@GAFFNEYCONSTRUCTION.COM <br /> (10/27/2021 3:11 PM KMK) <br /> Be sure mechanical low voltage permit is <br /> scheduled and approved before cover.At <br /> this time there is not activity on it. <br /> 11/4/2021 11/4/2021 BLDG 16-FINAL KMK NOT READY see notes 11/2/2021 1:58 PM GAFFNEY <br /> CONSTRUCTION <br /> If plumbing doesn't get signed off can we <br /> please still do a site walk to see any <br /> potential issues we can resolve ASAP. <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address:1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> Tory@GAFFNEYCONSTRUCTION.COM <br /> (11/4/2021 9:43 AM KMK) <br /> Obtain finals on all sub permits to include: <br /> 1.Fire(on Building permit) <br /> 2.Electrical <br /> 3.Utilities <br /> Recall for a building final when the above <br /> is completed <br /> 11/5/2021 Any 11/5/2021 11:1: FIRE 03-BLDG RJJ APPROVAL confirmed Knox 11/4/2021 2:39 PM GAFFNEY <br /> FINAL FOR FIRE caps installed CONSTRUCTION <br /> FDC Knox Caps were installed on 11/3/21. <br /> Contact Name:GAFFNEY <br /> CONSTRUCTION <br /> Site Address: 1325 SE EVERETT MALL <br /> WAY <br /> Phone:4255081631 <br /> e-Mail: <br /> tory@GAFFNEYCONSTRUCTION.COM <br /> 11/8/2021 11/8/2021 CERTIFICATE OF KLC APPROVAL Attached <br /> OCCUPANCY <br /> INSP12 <br /> CRWsYSTEMS <br />