My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7710 EVERGREEN WAY FELLOWSHIP CHRISTIAN SCHOOL 2022-05-13
>
Address Records
>
EVERGREEN WAY
>
7710
>
FELLOWSHIP CHRISTIAN SCHOOL
>
7710 EVERGREEN WAY FELLOWSHIP CHRISTIAN SCHOOL 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 12:06:33 PM
Creation date
12/22/2021 9:48:13 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7710
Tenant Name
FELLOWSHIP CHRISTIAN SCHOOL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUELIC WORKS DEPARTMENT Q EMAILED <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 ` -A <br /> 425-257-8800 <br /> COST ESTIMATE SHEET ) .1 <br /> 9 I D(� <br /> 't. <br /> Receipt # ,/\ 1 i' V OM Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order 7545.00 Service Order# <br /> Contact Person Nick Smith 3 !„'�'')— �6�rht�y�-co, Telephone# 360354-5860 <br /> Requested By Sabrina Fandler Date of Request 9/14/2018 <br /> Property Owner(name) Fellowship Christian School <br /> Charge Cost to(name if different than owner) Attn: Nick Smith <br /> Address 8911 Vernon Road #M132 City Lake Stevens, WA Zip 98258 <br /> Installation Location 7710 Evergreen Way <br /> Installation type/description/size/etc. 6" tap on 8" water main and connect to contractor installed <br /> 6" D.I. pipe. City crew to excavate, shore, restore and provide traffic control the above work. <br /> n The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $1513.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $3173.00 Matt Welborn <br /> Equipment Rental $1070.00 Randy Allen <br /> Paul McKee <br /> Tax $289.00 Jim Spooner <br /> Sabrina Fandler <br /> Restoration $1500.00 Benyam Stephanos <br /> TOTAL $7545.00 Grant Moen <br /> Prepared by: Jim Spooner ;_ Date Estimate Prepared 9/14/2018 <br /> Accepted by: Representing F tl p �,� ,k f, `j i e,tg ,14 o)ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.es62018\7710 Evergreen Way CEFP <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.