My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9404 HOLLY DR 2021-12-22
>
Address Records
>
HOLLY DR
>
9404
>
9404 HOLLY DR 2021-12-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 10:24:20 AM
Creation date
12/22/2021 10:24:18 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9404
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI�ORKS PERMIT FAA Date Applied: 4/29/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2104-073 <br /> EVERETT 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $45.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WOODARD TED JAMES/ESCOLERO PATRICIA D JIM WOODARD <br /> 9404 HOLLY DR 9404 HOLLY DR <br /> EVERETT,WA,98204 EVERETT,WA,98204 <br /> PHONE: PHONE:2069102229 <br /> TAX PARCEL ID#:00480200101600 SITE ADDRESS:9404 HOLLY DR <br /> DESCRIPTION:REPLACE FENCE WI NEW 6'CHAIN LINK FENCE W/PRIVACY SLATS <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4.The fence shall be no greater than 6 feet in height on the rear and side yards. <br /> 5.The fence shall be no greater than 42 inches in height in the front yard(shortest property frontage,unless otherwise noted or <br /> previously determined). <br /> 6. Fence shall be no greater than 36 inches in height within the 15ft sight triangles at the intersection of the roadway and the <br /> alley/intersecting roadway. <br /> 7. Protect all existing underground utilities during construction. Fence posts shall be at least 2ft away from any underground utility. <br /> 8. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 9. This fence constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> 10.This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit <br /> Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: .. a L� l► <br /> Fence in R.O.W. $25.00 <br /> PW Site Inspection$20.00 MAY 07 2021 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> ef27°1 <br /> may arise because of installation and maintenance of the <br /> 0-5/0 <br /> ,5 0 /40 / improvement or other right-of-way use here to applied for and further <br /> [� agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.