My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1916 HOYT AVE 2021-12-22
>
Address Records
>
HOYT AVE
>
1916
>
1916 HOYT AVE 2021-12-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 1:33:40 PM
Creation date
12/22/2021 11:01:20 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1916
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/8/2021 City of Everett Page 1 <br /> 3:43:36PM /� <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1701-001 Site Address 1916 HOYT AVE <br /> Applied 1/3/2017 Applicant MICHAEL GEORGE Lot <br /> Approved 2/28/2017 Owner STEWARD JEFFREY B&CALLIE A Block <br /> Issued 6/21/2017 Contractor OWNER Tract <br /> Parent Permit No. Description DUPLEX,CHANGE GARAGE TO LIVING SPACE <br /> Notes AND EXTERIOR STAIRWAY/WILL ALSO INCL 2 GRAVEL PARKING SPOTS AND 3 PARKING <br /> SPOTS IN GARAGE UNDER CARPORT/ON SITE RAIN GARDEN/BATHROOM IN GARAGE <br /> INFILL DWELLING UNIT,NO STRUCTURES TO BE PLACED WITH IN REQUIRED OPEN SPACE <br /> NCB16-011 <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 7/19/2017 7/19/2017 Footing KMK Approval OK to pour <br /> 7/19/2017 7/19/2017 Foundation KMK Approval OK to pour <br /> 7/19/2017 7/19/2017 UFER Ground KMK Approval OK to pour <br /> 8/25/2017 8/25/2017 PlbgGrWork SDP Approval As noted 1.3"waste line tie-in under slab in crawl <br /> space. <br /> 2.1"pex water line from front house to the <br /> back house. <br /> 9/7/2017 9/7/2017 PlbgGrWork SDP Approval Remainder of <br /> groundwork ok to <br /> cover. <br /> 9/14/2017 9/14/2017 StructSlab KMK Corr Reqd Not ready-no need for structural slab <br /> inspection <br /> 9/15/2017 9/15/2017 StructSlab KMK Approval See notes Wire mesh installed in garage slab as per <br /> plan <br /> 3/5/2018 3/5/2018 BLDG 13-OTHER KMK APPROVAL Complete nailing <br /> SW sill plate <br /> 3/5/2018 3/5/2018 BLDG KMK APPROVAL Complete nailing <br /> 07-EXTERIOR SW sill plate <br /> 6/27/2018 6/27/2018 BLDG DWF CORRECTION Not ready Need electrical,plumbing,and mechanical <br /> 08-FRAMING rough ins before framing. <br /> 9/27/2018 9/27/2018 PLUMB SDP APPROVAL As noted Glue temp/pressure drain pipe(for water <br /> 03-ROUGH IN heaters) <br /> 11/8/2018 11/8/2018 MECH 04-ROUGH SDP PARTIAL APPR Upper unit-OK rough in-Noted:stove <br /> IN exhaust will be installed at final on alley <br /> side. <br /> Lower unit-Venting must maintain the <br /> floor/ceiling fire rating. <br /> 11/8/2018 11/8/2018 MECH SDP PARTIAL APPR Refrigeration& <br /> 03-REFRIGERATIO condensate lines OK <br /> 11/14/2018 11/14/2018 BLDG DWF CORRECTION Not ready <br /> 08-FRAMING <br /> 11/14/2018 11/14/2018 MECH 05-OTHER DXW OTHER Only 1 heat pump to 2 units. <br /> Will check on inspection <br /> 11/14/2018 11/14/2018 MECH 05-OTHER DXW APPROVAL As noted Lower floor- <br /> Bath,laundry,dryer rough in OK as noted: <br /> Complete insulation wrap on last 1'at each <br /> end. <br /> Top floor- <br /> Bath,laundry,dryer rough in OK as noted: <br /> Kitcehn hood duct on outside wall-will <br /> check at final. <br /> 11/16/2018 11/16/2018 BLDG DWF PARTIAL APPR Obtain electcial and mechanical inspections <br /> 08-FRAMING approval for 2nd heat pump. <br /> Complete fire taping(mud/tape) <br /> screws/holes <br /> Need positive connection post/beam- <br /> seismic <br /> OK to insulate <br /> Will inspection corrections on next <br /> inspection. <br /> 1NSP12CRWsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.