Laserfiche WebLink
S i <br /> CITY OF EVERETT <br /> EVERETT Community, Planning & Economic Development Department <br /> WASHINGTON Planning Division <br /> NOTICE OF PLANNING DIRECTOR DECISION <br /> Project File Number: REVI120-014 <br /> Applicant: Robert&Karen Spencer <br /> Site Location: 1910 W Mukilteo Blvd., Everett,WA 98203 <br /> Tax Parcel#: 00417100000303 <br /> Zoning: R-S,Suburban Residential <br /> Staff Contact: Grace Pollard Igpollard@everettwa.gov/425.257.8731 <br /> Project Description: The applicant has requested a height and maximum footprint modification under <br /> Everett Municipal Code(EMC) 19.07.020.J & 19.07.020.M.The proposed action is a request to build a 560 <br /> square foot addition to the existing 477 square foot detached garage totaling 1,037 square feet, up to 20-feet <br /> in height.The proposed structure will have a 20'-11"setback from the rear property line,a 5'-3"setback from <br /> the west interior side property line,and a 61'-2"setback from the east interior property line.The subject <br /> property is a 19,602 square foot lot developed with a 2,408 square foot,single floor,single-family residence. <br /> The building materials of the proposed accessory building include Hardiplank and composite shingles in the <br /> same color and style as the existing single-family residence. <br /> A 14-day public comment period for the proposal was completed; no written comments in opposition were <br /> received. <br /> Decision:The City of Everett Planning Director grants APPROVAL with CONDITIONS to construct a 1,037 <br /> square foot accessory building up to the maximum height of 20 feet.The following conditions shall apply: <br /> 1. Any changes to the design, height,square footage,siding, roof material, roof pitch,and/or setbacks of <br /> the proposed accessory building requires prior Planning approval. <br /> 2. A geological assessment letter or a geological report must be submitted with your building permit <br /> application per requirements of EMC 19.37.070—EMC 19.37.073 and EMC 19.37.080 and shall be submitted <br /> with the building permit application. <br /> 3. A Base Elevation Survey form must be completed and submitted with the building permit application. <br /> 4. A Height Survey form must be conducted prior to the framing inspection.Submit the completed height <br /> survey form to the inspector during the framing inspection verifying the height is under 20'-0". <br /> riv `cy zLfih for David Stalheim December 18,2020 <br /> David Stalheim, Interim Planning Director Date <br /> Appeal Process:The administrative decision may be appealed to the Hearing Examiner no later than 14 days <br /> from the day after the date of mailing of the decision. For information regarding appeals please refer to <br /> Everett Municipal Code Title 15,Chapter 02,Section 600(EMC 15.02.600)and contact Grace Pollard at <br /> 425.257.8731 or gpollard@everettwa.gov with any questions. <br /> 2930 Wetmore Ave,Ste 8-A 425.257.8731 ' planning@everettwa.gov <br /> Everett,WA 98201 425.257.8742 fax everettwa.gov <br />