Laserfiche WebLink
4) Is there any specific detail I need to know regarding the new permit? <br /> Regards, <br /> Gus Hosn <br /> (2060 799-1525 <br /> On Tue, Sep 3, 2019 at 10:42 AM Ted de Budden<TBudden@everettwa.gov>wrote: <br /> Mr. Hosn, <br /> Please find attached: A copy of the Electrical Evaluation guidelines as discussed on the phone. <br /> A separate permit obtained by your Electrical contractor is required. The permit will to establish a separate <br /> record of the evaluation taking place, and the entity taking responsibility for the Electrical System installed <br /> within your building. <br /> Thank you for responding to the Inspection concerns related to this matter. <br /> Regards <br /> Ted de Budden <br /> Chief Inspector 1 Peiinit Services <br /> 425.257-72711 3200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> Hours: Monday - Friday 7:30am-12:00pm and 1:00pm-4:00pm <br /> everettwa.gov 1 Facebook I Twitter <br /> Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to <br /> disclosure pursuant to the Public Records Act. <br /> Original Message <br /> From: ENG ADMIN RICOH@ci.everett.wa.us<ENG ADMIN RICOH@ci.everett.wa.us> <br /> Sent: Tuesday, September 3, 2019 10:47 AM <br /> To: Ted de Budden<TBudden@everettwa.gov> <br /> Subject: Message from "RNP0026739C3C9E" <br /> This E-mail was sent from "RNP0026739C3C9E" (MP C3503). <br /> Scan Date: 09.03.2019 10:47:01 (-0700) <br /> Queries to: ENG ADMIN RICOH@ci.everett.wa.us <br />